Thursday, July 14, 2011 11:25 PM PST 
Comments closed
DHA Valley

I have paid 11 installments for a 5 marla plot in DHA Valley. Now, yesterday I have received a letter from DHA, that I am informed not to submit the 12th installment (last installment) since this has been deferred on the requests of customers.
This is beyond my understanding, they have got 11 installments and at this stage when we were about to pay the last installment, they sent this letter.
Can anyone explain, whats the DHA Valley authority upto?
Regars

Sleepless replied on Friday, July 15, 2011 01:20 AM PST 
I got the same letter from them. Wonder what they are upto?

AK replied on Friday, July 15, 2011 02:06 AM PST 
Seems they have realized that after paying all installments, people will get annoyed due to no development work under progress. So its better to keep last installment halted to avoid immense pressure from people who have invested their life savings in this fraud scheme.

Sleepless replied on Friday, July 15, 2011 02:39 AM PST 
Considering the fact that civilians as well as military/ex-military have invested in this project, I am sure they will be facing immense pressure in the near future.
DHA Islamabad should have never gone for a project that they could'nt hope to finish.
"Military Inc." is once again exploiting the poor, the downtrodden and the voiceless of Pakistan.

AK replied on Friday, July 15, 2011 03:38 AM PST 
I would suggest to establish a community of DHA Valley fraud victims and file a petition in Supreme Court.

A Poor Victim replied on Friday, July 15, 2011 05:55 PM PST 
This project was probably never a project of DHA who were lured in by BT for such a gigantic venture. They are now finding it hard to complete. Even if they somehow manage to do, it will take many many years to get some shape. There should be a pressure Group of all vicims to agitate the authorities to come up with some out of the box solution to make it attracive for people who have paid their life earned hard money just to see the good name of Army.

AK replied on Friday, July 15, 2011 07:34 PM PST 
True, a pressure group must be established for this fraud scheme victims. I see no hope for this project completion specially after SC directed Panjab Govt to retrieve land site planned for Dam construction. BT and DHA shifted the dam site to other remote area without consent of concerned authorities. Now the land which was proposed in DHA valley campaign is not available as it was previously planned.
So people please gather up and submit the letter in SC.

A Poor Victim replied on Friday, July 15, 2011 11:55 PM PST 
Will concerned Authorities in DHA explain the real story behind this ill-fated venture. Also tell the Public what they intend doing to retrieve the Scheme and their "good" name.

AK replied on Saturday, July 16, 2011 06:57 PM PST 
@A Poor Victim, DHA will never explain any reason because they have been hijacked by Malik Riaz.

Ramzan replied on Saturday, July 16, 2011 07:05 PM PST 
Welcome all guys, Dha valley 70% buyers are overseas pakistani and they cannot come and join any gathering in islamabad. Dha knows about this that why they playing delay technics. we have to take onboard first overseas pakistanis before going to court or Dha valley management.
Better first talk to Management what they are going to do.
Rgds

Saquib replied on Saturday, July 16, 2011 07:09 PM PST 
All Guys please apply for allotment letter for dha valley, some people already got letters because after paying 6 installment we are illigible for allotment letter. I think in this situation they will not issue letter.
I got last month.

Sulman replied on Monday, July 18, 2011 02:09 AM PST 
Yes it seems the only practical wayout to help boost the DHA Valley development, to establish a group of stake holders and seek justice from SC.
instead of approaching one person on his personal email ID, I'ld rather suggest to establish one group on yahoo for discussions/suggestions.
I think one such group is already available on facebook(search from name of DHA Valley)but it needs attention from all member to participate actively.

Ahmed Raza replied on Friday, January 6, 2012 07:42 AM PST 
People who have been affected by the fraudulent Dha Valley Scheme should form a pressure group.
(243)
Thursday, July 7, 2011 05:27 AM PST 
Comments closed

Investing in property with the intention of selling it in future is worse than getting interest from a bank in savings account.
Buy buying a piece of land and not doing anything after than and then hoping to sell it for a higher price is just another form of gambling...in fact its worse than gambling, because gambling in casino effects only the person and his family who gambles. But in real estate investment it effects the cost of living of entire community.
So when you buy a plot with the intention of selling it for more price, think again and ask yourself if you are doing the right thing.

JJ replied on Thursday, July 7, 2011 05:36 AM PST 
What's wrong in that. A money in bank went into circulation and one is selling a plot because he need the money.
Don't give your stupid FATWA'S here and don't visit this site as this is not for people like you. Why you visiting this site by the way?

asifm9 replied on Thursday, July 7, 2011 06:11 AM PST 
Buying a plot for resale is perfactly right if we pay zakat on it i.e 2.5%/annum of market value of plot. If we start payining the zakat religiously, there will be very less people to invest in property. Allah has imposed zakat at all assets which are not use. Property investment has really increased cost of living (food,accomodation). Look at lahore, there are thousands of developed plots which are nither used for agriculture nor for residence due to this sort of investment. This land was once the source of cheep vegetables, meet and milk for lahories. Now they have to pay more for food items and more for residence. If we want to increase our wealth we should invest in agriculture or any ther business which will create job opertunity for the people.

Azad K replied on Thursday, July 7, 2011 07:09 AM PST 
People should invest in companies or businesses as opposed to real estate. If they want for their own use then it is fine, but the hoarding of plots with a view to forcing their prices up, has a negative effect on the economy. First of all it ties up huge amounts of money, which is doing nothing but just waiting for prices to appreciate. Secondly that money could be better used elsewhere in trade and industry or infrastructure building.

AK replied on Thursday, July 7, 2011 09:39 AM PST 
Well said asifm9.

Ahmed replied on Thursday, July 7, 2011 01:33 PM PST 
Any investment which has a risk of loss is perfectly alright.

AG replied on Thursday, July 7, 2011 02:11 PM PST 
Gentlemen,
1. Islam does not forbid investment in property. We need to meet the requirements set by Islam i.e pay Zakat etc.
2. Property development helps the nation in a number of ways.
3. It, ultimately, provides much needed housing units which are required in millions for the rapidly increasing population of Pakistan.
3. It provides employment to the poorest of the country, the labourers, masons, electricians, plumbers etc.
4. It supports around sixty labour intensive industries in which again the poorest get jobs.
The best way of Triggering Ecnomic Recovery is to provide soft loans for housing units & trim the prices of construction materials.
Unfortunately our litteracy rate is very low which leaves a major part of our young population without jobs & idle brains which leads them to crimes & militancy because "An Idle Brain Is The DEVIL"s Workshop". Further Acute Poverty fuels the situation.
So my dear friends property development & investment in it Makes Sense.
Kind Regards.

LRE Hot Topics replied on Thursday, July 7, 2011 09:53 PM PST 
Post added to useful posts list. View MORE Useful Posts Click on >>> LRE Hot Topics
(242)
Tuesday, July 5, 2011 08:20 PM PST 
Comments closed
DHA Lahore Plots On Installments Application Form

Image attached to a Lahore Real Estate post about: https://www.lahorerealesate.com/dha_app_form_sale_of_plot.pdfDHA Lahore Plots On Installments Dear friends I am currently trying t…
https://www.lahorerealesate.com/dha_app_form_sale_of_plot.pdfDHA Lahore Plots On Installments Dear friends I am currently trying to understand this advertisement today in newspapers. So far I have understood. These plots are well under priced than current going market rates and on top they are on installments of 2 to 3 years. This is a great offer and every visitor of this website should try it best to participate in this super offer by DHA Lahore. DHA Lahore will collect lot of money that can be used to develop all phases much faster and same time people who get plots in ballot will benefit by getting a lot of profit on booking or can buy a plot in proper DHA Lahore on easy installments. DHA have offered plots in DHA Lahore phase 1 to 9 so lets get ready for ballot and development of all current phases of DHA Lahore. In case DHALahore.Org goes down due to heavy traffic there you can download forms from LahoreRealEstate.Com too. https://www.lahorerealesate.com/dha_app_form_sale_of_plot.pdf

http://dhalahore.org/images/forms_download/flash_news/dha_app_form_sale_of_plot.pdf If you need further help please call on phone. Please note any recommendation is based only my personal feeling. I get nothing from you or DHA Lahore to recommend you or book any plot in this new installments plots booking. I am just trying to help and guide you based on my market knowledge. Its your money do more research before you apply. You will be responsible for your decisions to book or not to book. I will not share your profit or loss so I dont want to get accused of any thing in future. Ch Mujahid Yasin ( CMY ) 03224009967


Muhammad replied on Tuesday, July 5, 2011 08:35 PM PST 
Any News relavant to DHA5 EXT balloting

Arshad Majeed Khokher replied on Tuesday, July 5, 2011 08:43 PM PST 
Dear CMY,
Kindly advise about the best commercial plot option from all the commercial plots being offered in today's advertisement.
Jazakumallah Khair.

R Investor replied on Tuesday, July 5, 2011 09:09 PM PST 
Dear CMY sahib
i have two queries
1-I want to apply for phase 9 (5 Marla) plot kindly plz guide me whether it will be good investment or its better to purchase a file after ballot becoz supply of more files will put a downward pressure on the prices of these files.
2-DHA Town Vs Phase 9 (5 Marla plot/File) becoz prices are almost same
where to invest and y to invest

Ahmed replied on Tuesday, July 5, 2011 09:15 PM PST 
Are development charges included in these prices?
Thanks

Friend replied on Tuesday, July 5, 2011 09:43 PM PST 
Dear CMY,
I have a question, are these plots which DHA is offering in phase 9, developed or yet to be developed?
secondly, in all other phases like from 1-6 , Is DHA offering plots on ready to make home basis or possession will be handed over after 3 years time.
Like if i buy in phase 5, will i be able to make home ?

CMY replied on Tuesday, July 5, 2011 09:46 PM PST 
Possession is available for all plots in phase 1 to phase 6. All other plots will take 3 to 5 years to get ready for houses.

Friend replied on Tuesday, July 5, 2011 09:51 PM PST 
Thank you for the prompt reply.I have one more query...
i talked with LIVE operator and that what he said ...
Live Operator: they r on installments . possession is open in some sectors
[0:47] Farhan Butt: in phase 5 and phase 6 is it open?
[0:49] Live Operator: yes after payment of isntallments
Does it mean we can only make home after 3 years ?

CMY replied on Tuesday, July 5, 2011 09:56 PM PST 
Does it mean we can only make home after 3 years ?
You will have option to pay plot price in installments if you plan to hold plot for long term or if you want to build a house right away you can pay full amount now and get possession right away and start your house construction.
Ch Mujahid Yasin ( CMY )
03224009967

Friend replied on Tuesday, July 5, 2011 10:01 PM PST 
That just cleared everything :)
Thank you.

Kamran replied on Tuesday, July 5, 2011 10:20 PM PST 
As my part, DHA Town is far better option for 5M than DHA-9, as location of DHA Town is mentioned but not for DHA-9. DHA-9 is v huge area and definitely due to small size the 5M plots will locate at trivial area.

PROGRESS replied on Tuesday, July 5, 2011 10:33 PM PST 
Dear Bro CMY,
What is the best option in DHA 9 5M or 10M.
Secondly, is stil there picture is remaining like some more plots to come in market on installment like in DHa 5 ext and DHA 9 one Kanal.

I hate transparency replied on Tuesday, July 5, 2011 10:39 PM PST 
From the ad, it would seem that this is yet another smart initiative by DHA to collect huge amounts of interest free funds to utilize for either some investment or fixed term deposit. Smart because they know that the greedy public can't resist games of chance/luck.
1. No quantity given for the plots on offer, and how many in each phase/category (tens, hundreds, thousands?). So no one can make an informed decision of the probability of getting a plot, instead of their money back in a few months. But hey, if you're a believer in prize bonds, then this is just the thing for you!
2. No information of the plot location. This is very odd. Do CDA/LDA do this kind of selling of plots? No, if you have an exisiting location on the ground and you want to maximize return, you AUCTION it. Market forces come in to play and everything is transparent. So why is DHA so benevolent? (It would be nice if they could show some benevolence in their existing commitments and deliver the already sold phases on time or within the same decade as initially indicated).
3. By pricing it just a little bit below average market price, they ensure tens of thousands of applications. DHA makes up far more money by the potential interest on deposits, and also many of the plots will be below average and some above average. For example, if they get 50,000 applications, avg Rs 1 million down payment, earn 10% on a fixed term deposit for 3 months, they earned Rs 1.25 BILLION in interest income. That is the sale value of 250 ten-marla plots!
Some relevant phrases that come to mind here:
A. THE HOUSE ALWAYS WINS
B. IF YOU LOOK AROUND THE TABLE AND CAN'T FIGURE OUT WHO THE SUCKER IS, IT'S YOU.
It is sad that even now, they are no (enforced) regulations that oblige an organization collecting public funds to disclose relevant information. People who don't learn from history are doomed to repeat it....

Mrlahori replied on Tuesday, July 5, 2011 10:48 PM PST 
Salam, I have a question as well. I am a bit confused. Is this form and RS. 5500 fees is for ballotting ? Like i mean They will take application form from thousands of people and will do KURRAA ANDAZI and the number of people will get plots who will get in the draw ?? or anyone who apply for a plot with this form will get a plot allotment if they want to go ahead ?
I am not sure if my question make sense or not. Basically i am asking if this is a draw kind of thing on which allotment of plots is based or everyone who will apply will get a plot ?
Looking forward to this answer. Thanks

Pardesi, Jeddah replied on Wednesday, July 6, 2011 12:04 AM PST 
From a gambler's point of view it is an option to get a plot on instalments with a chance of good location; otherwise losing Rs. 1 to 5 lacs & difficulty of getting rid of it in the market as we have already got a huge number of sellers in Ph 7 & 8. Phases 1-6 have already been balotted for the good locations & some forfieted plots may be left with DHA,7-9 posession date matters.
From an investors's point of view I suggest he should wait to opt for a good location plot & pay a little premium to get a plot on instalments after the ballot.

Javed replied on Wednesday, July 6, 2011 12:19 AM PST 
I agree with the analysis of I hate transparency. It is actually our greed that entangle us into a snare.Particularly when dha has not disclosed location of plots and its acstual numbers available. It will be drone like on five marla people, who are barely minimum able to gather resources to pay and waite for three years.(it is the fault of five marla people and not of dha) if the plots are ready for possession and constsruction how it come that dha will put these plots on instalment.

CMY replied on Wednesday, July 6, 2011 12:36 AM PST 
One of the most important thing in today's advertisement is DHA Lahore phase 5 extension location. Now its official that DHA phase 5 ext will be located next to Askari phase 11 and location map also indicate DHA Lahore have enough land for all DHA phase 5 ext files.
Ch Mujahid Yasin ( CMY )
03224009967

Azad K replied on Wednesday, July 6, 2011 02:49 AM PST 
I can understand why DHA is allowing people to purchase in installments where houses aren't built yet, however even this suggests that DHA is losing its edge and has to resort to these measures.
But in Phase 1-5 if they have any plots then they should be auctioned. I cannot think of the reason behind allowing people to pay in 3 year installment in the older phases unless DHA wants to accomodate some selected persons.

MAS replied on Wednesday, July 6, 2011 06:46 AM PST 
@ 'I hate transparency' Thank you for giving words to my thoughts. More than DHA, it goes to show the character and intellectual level of the people who would apply in the ballot in the face of such insult by the balloting company.

MAS replied on Wednesday, July 6, 2011 07:12 PM PST 
To make my above comment a little more balanced DHA does enjoy more trust of public as compared to other societies because it has delivered more than others in the past which is why many would apply. Each person has the right to choose whether to apply or not but we should all be aware of the lack of transparency and that the applicant's chance of getting a good plot may be less than expected.

AK replied on Thursday, July 7, 2011 09:42 AM PST 
DHA is loosing its reputation in Lahore and Islamabad.

LRE Hot Topics replied on Thursday, July 7, 2011 09:52 PM PST 
Post added to useful posts list. View MORE Useful Posts Click on >>> LRE Hot Topics
(241)
Sunday, July 3, 2011 10:03 PM PST 
Comments closed
Guidance Needed for House Building Finishing Material

Friends
Can anyone guide me the rates of good quality following finishing material, which is better? where to buy from? & their tentative prices?
. Which is a better option tile or marble?
. Bathroom tiles & accessories?
. Steel or Wooden Door-Frames (Chokaht)?
. Doors - ready-made or carved
. Aluminium for Windows & Glass
. Kitchen cabinets
. Electric Wires
I 'll be grateful if some experienced friend can guide me.

AK replied on Monday, July 4, 2011 12:52 AM PST 
I am not sure about rates but I can suggest you about different available brands and options.
1. Good quality marble on floor will cost you more than Chinese tiles and other alternative tiles. Granite is even more expensive but quality and finish is awesome.
2. For Washroom tiles, there are many brands to choose from like Masters, Stile, Karam Ceramics etc. For sanitary fittings, Master is considered best in local brands. Also Sonex is good.
3. Wooden frames of high quality are very expensive. You can check interwood which makes very high quality doors and frames but that will cost you around 15-20,000 for each door approximately. For lesser price, you can check Dayar wood option which is also a good option.
4. For high quality door, Interwood is awesome but their price is even more awesome. There are many wood workshops which make good quality wooden doors at reasonable price. It all depends how much you can spend.
5. Aluminium depends on house look and exterior paint. usually people opt for dark brown, dark golden aluminium frames. Same goes for glasses and there are different grades available for glasses. More you spend better you have options.
6. Kitchen cabinets... Again if you are filthy rich, I would suggest interwood else any good carpenter can do a fine job with good quality wood.
7. Pakistan cables and English cables are best available local brands but prices have gone sky high and copper wires rolls are damn expensive now.

Kashif Riaz replied on Monday, July 4, 2011 08:12 PM PST 
Dear AK,
Only Filthy Rich can have good cabinet but about a other riches????????????
:)
Regards
(240)
Thursday, June 30, 2011 04:21 AM PST 
Comments closed

dear brothers i want to built a house in bahria.i neaed some information speasily main nadeem bahi .about contacter and how much money i need to build a sweet house.

Majeed Malik replied on Thursday, June 30, 2011 04:39 AM PST 
Ahmed bhai
Call Younas Bhai in Islamabad, . He recently built my house in G-13 and I have very good experience. Very honest, expert in his field, flexible. If you like, you can come to see my house.

AK replied on Thursday, June 30, 2011 06:11 AM PST 
@Majeed.
Can you please share detail of your agreement with Younas Bhai. Did you opt for turn key solution or labour only? What rate did you pay per sqft? How much it costed you in total?

aj-Pak replied on Thursday, June 30, 2011 06:38 AM PST 
Majeed bhai thank you for introducing an honest man, I am in touch with him for a project of my own.

Arshad replied on Thursday, June 30, 2011 11:05 AM PST 
Can you publish rates and other arrangements so that reader get benefit. I am also considering build a house in Bahria Town and looking for some references

Ahmed replied on Thursday, June 30, 2011 10:28 PM PST 
Plse share info at forum.

Majeed Malik replied on Friday, July 1, 2011 01:51 AM PST 
My house was built by Younas Bhai in G-13 on 35x70 plot. It includes basement, gound, 1st floor and one 'mumty' room. Top class consutction, completed within around one year. Rate was around Rs 1600 (plu/minus). I paid him one million in advance and then kept paying during the course of construcion. He arranged everything for me e.g. map, approvals, connections etc etc. House was rented out after completion to two tenants. Younas Bhai is also acting on my behalf in collection of rent and other matters etc as I am living abroad. For more details, please feel free to write on

tzk replied on Friday, July 1, 2011 03:48 AM PST 
you can also contact Babar Munir Khan. He is an honest and quality contractor
his cell # is

AK replied on Friday, July 1, 2011 06:58 AM PST 
Thanks you guys for sharing contractors info. I would appreciate if there is some website or forum thread where people can share construction material price on daily or weekly basis.

tzk replied on Friday, July 1, 2011 11:16 AM PST 
this website has more information than you can find elsewhere. For example, for any society such as DHA or Bahria, u can find more info and pictures on this site than all other sites combined including their official websites.
Here they have some construction and building material info but not as much as you demand but still more than other sites

Ovesease Help line replied on Friday, July 1, 2011 11:03 PM PST 
Please donot look honest or not honest Do proper contract with all and clear detal and quility of metarial as per the rate. keep som one from your family to keep checking the metarial and quility during construction. I am in favour to give contract with metarial because un experiance people purchasing metarial 50% more than actual price.Good construction could be done Rs1400 to 1600 per sq/foot.
It is not easy to say who is honest or not honest both parties should go according to deal and contract.

tzk replied on Saturday, July 2, 2011 05:37 AM PST 
i agree 110% with overseas help line. you have to evaluate, suspect all contractors unless they are proven innocent and even after u make decision you have to keep checking. You can even install a mixture of real and fake web cameras on site to view and give impression that they are being watched

Mian Nadeem Islamabad replied on Monday, July 4, 2011 08:39 AM PST 
> For 500 yards 2 story luxury house with 5500 sq feet covered area with imported fittings & fixtures fine quality branded wood work 10 Millions required.
> Construction cost in Bahria is comparatively high due to filling area.
> For 500 yards single story house with A class local fittings 4.5 million is sufficient.
> Avoid with material contract because majority of contractors are dishonest.
> If u decide with material contract then decide in written every minor thing and mode of payment.
> Prefer contractor already working in Bahria and can provide u list of his clients for reference.

LRE Hot Topics replied on Thursday, July 7, 2011 10:21 PM PST 
Post added to useful posts list. View MORE Useful Posts Click on >>> LRE Hot Topics
(239)
Wednesday, June 29, 2011 11:08 PM PST 
Comments closed
(238)
Wednesday, June 29, 2011 04:59 AM PST 
Comments closed
(237)
Wednesday, June 29, 2011 02:06 AM PST 
Comments closed
... back to Pardes

Salaam friends,
I had a long tiring business tour of the UK and a short & hectic personal stay in Lahore to see my dream home, the grey-structure of which is almost 90% completed (Alhamdulillah) and finally, I am back home here in Jeddah. Sorry for not contacting all the friends there because of the shortage of time.
...m ready to share the details of the house construction & the overall property market with interested friends of this forum.

AK replied on Wednesday, June 29, 2011 02:17 AM PST 
Congrats Pardesi,
Would appreciate if you share the details of your dream house and pictures as well.

CDW replied on Wednesday, June 29, 2011 05:06 AM PST 
Mubrook, and I wish you success and peace till end. I'm also going to start construction of the dream home in Phase-6 G Block, and would like to hear from you on the following:
1. Which contractor did you choose? and why? Who was doing the day-to-day supervision of your grey structure till date?
2. From where did you buy the basic material?
3. Any other advise from your experience will be appreciated.
Once again I wish you a happy living in this house once completed. Ameen.

Pardesi, Jeddah replied on Thursday, June 30, 2011 12:36 AM PST 
.Living Abroad?
.Odd-sized plot?
.Ever increasing prices?
These were the questions I was facing at the beginning. I initiated the project on paper way back, before the actual on-the-ground spade-work started, by taking the actual dimensions within the society's regulations. I plotted inch by inch over MSVisio to my satisfaction & also on the SweetHome3d as a rough sketch for a 3D walk -through. All in all I designed 33 versions, floor-by-floor comparing & matching to my requirements & pocket. Fine tuning did by the architect.
Then I searched for the contractor; interestingly, I met some good people in the business when I went to Lahore last year. I found that taking pains of procuring material, its security & managing labour is a full time specialized job. I shared the construction estimates on this forum 2/3 months back which proved that technical problems in building a basement, its insulation & drainage and fine tuning of the design needs specialized capabilities; plus, for a project involving millions of rupees you MAY save 2/3 lacs if you have time & expertise but I did the other way & contracted for the grey-structure, architectural elevation, designing with material & supervision. I have found the person honest & co-operative; although satisfaction is a relative term but I think I could not do better than what I have achived Be-Hamdillah. I have sent you the details of the contractor via email.
Masha-Allah, it is at 14marla, around 5,000 sq. ft. covered area in the Suigas Society Ph1 and has:
. 3 Beds attached dressing/bath, lounge, & a store in the basement with 2 patios open to sky;
. 2 beds attached dressing/bath, lounge, drawing, kitchen with serving kitchen & a car porch at the ground floor;
. 2 beds attached dressing/bath, lounge, drawing, kitchen, laundry, balcony & 2 terraces at the independently separable first floor.
I am now planning for the finishing phase let this monsoon be over Insha-Allah.
A Request: Friends with experience of finishing to share their experiences.

AK replied on Thursday, June 30, 2011 12:55 AM PST 
@Pardesi...
Can you please share the rate for grey structure contract with material?
Did you decide brand of things like Cement, Iron bars etc.?
How much time it took? Did you go for RCC column beam structure? How much steel bar is used?

Pardesi, Jeddah replied on Thursday, June 30, 2011 01:30 AM PST 
Replies @AK
Can you please share the rate for grey structure contract with material? Rs. 1,000+
Did you decide brand of things like Cement, Iron bars etc.? YES
How much time it took? 6 MONTHS
Did you go for RCC column beam structure? NO
How much steel bar is used? 15+tons but not sure, need to ask my contractor.

AK replied on Thursday, June 30, 2011 06:15 AM PST 
Thanks Pardesi for prompt reply...

Overseas Pakistani replied on Thursday, June 30, 2011 09:21 PM PST 
Padresi ji,
Would be grateful if you could please share the details of contractor / Architec / Supervising Agents followed by the rates and contact numbers on this e-mail ID .
Appreciate your assistance.

Overseas Pakistani replied on Thursday, June 30, 2011 09:26 PM PST 
(236)
Wednesday, June 29, 2011 02:00 AM PST 
Comments closed
DHA Valley

I have seen several people asking status update of DHA Valley. I have replied to several queries but few people insist that DHA valley project is going on without any problem. So for all my brothers who have invested and are planning to invest in DHA Valley, please read below excerpts from different sources.
The Element of Fraud from DHA Authorities
Many people believe that the whole project is a fraud. It is known that DHA has only purchased 10% of the land required to complete the project. Whereas, according to the land laws of Pakistan government, they need to buy at least 85% of the land beforehand starting the project and taking money from them. The local land-owners of the area, after knowing that their land is worthy, rejected the offers from DHA to sell their land. It means that the project will never be completed and the town planning shown to the people will never happen. There is another serious problem to the execution of the project. DHA needs to surrender around 2,300 acres of land to local government authorities because this was the land previously decided to build a dam upon it.[6]Punjab government has decided to recover this land from the three big organizations i.e., Defence Housing Authority, Bahria Town and Habib Rafiq Ltd in Kahuta and Kallar Syedaan tehsils for the construction of Dhadhocha Dam to meet the water needs mainly of Rawalpindi and to some extent of Islamabad. This will severely affect the town planning and in-fact the whole project.
Concerns about DHA Homes
There are several concerns about DHA Homes. First, the whole construction is relocated to the edge of DHA valley, while in the initial maps, was shown right in the center of DHA valley. This shows that DHA authorities are facing difficulties in getting the land from local residents. Also it flashes the concern that the whole valley will be relocated, further far away from Rawalpindi/Islamabad. Second, the company which was constructing the homes, AREAA, has dropped the project from the list of their ongoing projects, which shows the lack of interest, or possibly, drop of the whole DHA Homes agreement. Till now DHA authorities are unable to clarify any concern communicated by the members of this community.
Source: http://en.wikipedia.org/wiki/DHA_Valley_Islamabad
Check out below URL of AREAA Construction company which was awarded contract for building DHA homes. Their site does not show DHA Homes in their ongoing project list which is of serious concern for all allottess who have paid millions of rupees to DHA.
Source: http://www.areaa.com.tr/main.php?lang=EN

Kalma replied on Wednesday, June 29, 2011 02:21 AM PST 
We are Manaafqeen instead of KAFIR or Mulsim. We deserve this.
Our religious scholar always talk KAFIR , KAFIR. but when some on asked them about the KAFIR that why your against KAFIR they said KAFIR drinking alcohol and Zinah.
What we Majaafqeen are doing:
Every bad habit on earth + Alcohol + Zinah, where we stand?
When some ask from religious scholar i am going to west, they said do not go their (JAZAZA NASEEB NAI HO GAA) Who will pray your janaza after deth.
But in Muslim countries they are eating the live Muslim brothers.
I do not know where we are going.
Aik Kalma hee acha a Muslims kay pass

Sleepless replied on Wednesday, June 29, 2011 02:23 AM PST 
If it truly is a fraud, again, the victims will be people from the lower middle class who opted to buy in DHA Valley due to the easy installment plan. Again, it will be the downtrodden and the voiceless who will suffer, and I guess the image of DHA and especially our military establishment will be tarnished. This goes to reflect the sad state of affairs in Pakistan where there is no justice for the poor.
May ALLAH ALMIGHTY help us to improve upon ourselves so that we can become rolemodels for the rest of the world.

MALIK SAQI replied on Wednesday, June 29, 2011 09:38 AM PST 
I have planed to buy a 8 marla plot in dha valley in july 2011 but after reading this fraud of dha, i pospond this purchase. please any body can give me the reply of these fraud , either these are true or not.I am waiting for sincer reply and guidline. i am living abroad and comming in july 2011.

AK replied on Wednesday, June 29, 2011 06:38 PM PST 
@Malik
I would suggest not to even think of DHA Valley. Dont waste your hard earned money in this fraud scheme. Two of my friends had 8 marla plot in valley and they sold those plots for -180,000 to -200,000. Rather invest your money in some other project like Bahria Town Safari Valley or Gulberg Islamabad.

trust dhai replied on Thursday, June 30, 2011 12:34 AM PST 
We should trust on DHAI, if there is any scam in land acquisition, i am sure DHAI will accommodate their paid client in others phases-2 or extensions or new location.

AK replied on Thursday, June 30, 2011 01:32 AM PST 
@Trust dhai...
People invest their hard earned money in such projects. Please meet and ask DHA valley allottees about their feelings of loosing their money. Having trust since 2008 launch of DHA Valley till now is good enough to realize that further investment in DHA+BT collaboration projects is risky.

BALLOT DHC replied on Thursday, June 30, 2011 01:39 AM PST 
TODAY AT 4:00 PM jUNE 29, 2011
Ballot of DHA Commercial avenue
Is this a new TRAP
for grabbing the remaining money

AK replied on Thursday, June 30, 2011 06:10 AM PST 
@Ballot DHC.... I am not sure about DHA Commercial avenue but I will share any finding I would come across to let people know of any possible problem.

Ali Bhai replied on Thursday, June 30, 2011 06:10 AM PST 
You guys are going to give a heart attack to those who invested in DHA Valley, DHA has a good reputation all around Pakistan, they will Insha-Allah provide a better alternative, so relax please.

Do not tell lies replied on Thursday, June 30, 2011 11:04 AM PST 
DHA Home is still there on the builder's website. Lies are being told here to stop people to invest in valley!

AK replied on Thursday, June 30, 2011 06:53 PM PST 
Repeat for Mr. Broker who is posting with different names here.
Its funny to see that you didn't read the website carefully and jumped down to conclusion calling people liar... Please check the website again. It shows only BAHRIA HOMES not DHA HOMES. If you can please paste screen shot here with DHA HOMES in their project list, I will take back my words. Otherwise calling people liar without reading carefully is pretty lame.
I can not understand why people are so emotional that they dont even read the stuff carefully.
(235)
Monday, June 27, 2011 09:02 PM PST 
Comments closed
DHA Valley 5 Marla plot Query

Asalam-o-Alaikum Everyone,
I have a 5 marla plot in DHA Valley Islamabad and I had paid 3 installments and currently they are charging me surcharge on daily basis. The amount of surcharge is currently around Rs-85,000.
I need suggestions and advise from you people that what should I do with this plot? Either should I sale it out (is it possible)?
Or is it possible that after paying out all the installments, I can request for waive off of my surcharge?
Secondly, need information about JINNAH TOWN ADIALA ROAD RAWALPINDI, either Jinnah town is a properly registered town or is it a non-registered one without any noc?
Thank you and I look forward for your replies.
:h

AK replied on Monday, June 27, 2011 09:34 PM PST 
My sincere suggestion. Get rid of any DHA Valley plot. This scheme was planned with dishonest approach. They are charging you surcharge while DHA is not developing any thing of DHA valley. Stay away from any new DHA venture in ISB/Pindi area.

Sleepless replied on Tuesday, June 28, 2011 01:12 AM PST 
Dear Zain,
As per current market price, the plots are going in negative to the paid amount. My advice would be to get sell it as soon as possible and recover as much from it as you can.

aj-Pakitsani replied on Tuesday, June 28, 2011 02:51 AM PST 
So janab, Zain sahib what is your demand now with all factors in mind. Feel free to contact me on the given email.

Zain replied on Tuesday, June 28, 2011 09:48 AM PST 
Thanks.
What about Jinnah Town rawalpindi?

SH replied on Tuesday, June 28, 2011 08:05 PM PST 
DHA valley is a long term investment. when i bought a file in bahria phase 8. everybody was saying the same thing about bahria phase 8, that it will never develop. It is developed now and possession is given. if you can hold for next 6 years then dha valley is good otherwise not.

AK replied on Tuesday, June 28, 2011 11:36 PM PST 
@SH.
DHA valley was a huge project and people invested their hard earned money on this project only because of DHA name tag. DHA Valley project got all messed up after the involvement of Bahria Town. Please watch Dawn TV program Reporter regarding DHA Valley issue. Malik Riaz made a deal with DHA and according to that deal all the payments in DHA valley account is transferred to Bahria Town account in three working days.
http://www.youtube.com/watch?v=VuYgEudduio&NR=1

SH replied on Wednesday, June 29, 2011 12:11 AM PST 
@AK
can you explain what DHA is getting from malik riaz against that deal.

AK replied on Wednesday, June 29, 2011 12:22 AM PST 
@Zain.
Jinnah Town is too far if you have to travel to Islamabad frequently. No information is available on RDA website.
Have a look at Gulberg Islamabad housing project.
http://www.gulbergislamabad.com

AK replied on Wednesday, June 29, 2011 01:33 AM PST 
@SH,
As per investigation reports which was broadcasted on Dawn news, DHA signed contract with Malik Riaz for land acquisition for DHA Valley projects. As per the contract, BT and HRL has to develop the Valley project and acquire land from local villages.
Check out below URL for further details and you may search on Google for tons of references.
http://www.dawn.com/2011/05/04/big-to-pay-for-their-small-minds.html

AK replied on Wednesday, June 29, 2011 01:45 AM PST 
@SH and all others... Please do check out this as well.
The Element of Fraud from DHA Authorities
Many people believe that the whole project is a fraud. It is known that DHA has only purchased 10% of the land required to complete the project. Whereas, according to the land laws of Pakistan government, they need to buy at least 85% of the land beforehand starting the project and taking money from them. The local land-owners of the area, after knowing that their land is worthy, rejected the offers from DHA to sell their land. It means that the project will never be completed and the town planning shown to the people will never happen. There is another serious problem to the execution of the project. DHA needs to surrender around 2,300 acres of land to local government authorities because this was the land previously decided to build a dam upon it.[6]Punjab government has decided to recover this land from the three big organizations i.e., Defence Housing Authority, Bahria Town and Habib Rafiq Ltd in Kahuta and Kallar Syedaan tehsils for the construction of Dhadhocha Dam to meet the water needs mainly of Rawalpindi and to some extent of Islamabad. This will severely affect the town planning and in-fact the whole project.
[edit]Concerns about DHA Homes
There are several concerns about DHA Homes. First, the whole construction is relocated to the edge of DHA valley, while in the initial maps, was shown right in the center of DHA valley. This shows that DHA authorities are facing difficulties in getting the land from local residents. Also it flashes the concern that the whole valley will be relocated, further far away from Rawalpindi/Islamabad. Second, the company which was constructing the homes, AREAA, has dropped the project from the list of their ongoing projects, which shows the lack of interest, or possibly, drop of the whole DHA Homes agreement. Till now DHA authorities are unable to clarify any concern communicated by the members of this community.
Source:
http://en.wikipedia.org/wiki/DHA_Valley_Islamabad

AK replied on Wednesday, June 29, 2011 01:50 AM PST 
Check out below URL of AREAA Construction company which was awarded contract for building DHA homes. Their site does not show DHA Homes in their ongoing project list which is of serious concern for all allottess who have paid millions of rupees to DHA.
http://www.areaa.com.tr/main.php?lang=EN