Ring Road Lahore Southern Loop - Suigas Society to Ferozpur Road

AOA
Can any one have the idea that when the Ring Road Southern Loop (Suigas Society to Ferozpur Road)is going to start, and when the remaining southern ring road will complete.

JUJ replied on Wednesday, August 8, 2012 05:14 AM PST 
Did not see any start of work a few dys ago. Locals told me the small canal is being constructed in concrete, i saw machinery, and the work will start after that. Official status, I do not know.

Aslam replied on Wednesday, August 8, 2012 05:26 AM PST 
Punjab Govt. Probably dont have funds for this project.
(642)
Thursday, July 12, 2012 03:07 AM PST 
Comments closed

Hello
Dear Mohammad Azeem LRE
Please tell me the worth of DHA Phase 1 Near k310 1 kanal plot and L26 2 kanal plot
Regards
(638)
Monday, June 25, 2012 06:46 AM PST 
Comments closed
Grey Structure contract

I am planning to sign a contract for grey structure for my 1 kanal house in Phase 6 DHA Lahore with a contractor. I am based outside Pakistan so I am planning for a lumpsum contract.
Can some experts and other friends who have recently gone through this experience kindly guide me on the issues which I should take care of while making this contract. What is generally included in grey structure and what is not. Should material make be mentioend in contract like cement etc. If so, then which makes are better.
A detailed guidance shall be highly appreciated.
Regards,
Asif

OVERSEAS PAKISTANI replied on Monday, June 25, 2012 08:30 AM PST 
I will suggest contract without material(labor only ) and someone should be there to check quality of work and to provide material ------ because lot of things needs to be observed during foundation/construction ----- and some time contractor try to save just one thousand even if it cost hundreds thousands loss to the owner--------- just imagine if mason person is not good or experienced ---- and what he can do with structure ????---- and some contractor try to find cheaper mason/labour to save money------------
Thanks

Maqsood replied on Monday, June 25, 2012 08:10 PM PST 
AOA
Asif Sb
I am also going through the same process but it took me quite long to decide a contractor. The person who is making my house in phase 5 is a very well educated honest and belong to very respectable family. If you would be interested I could give you the contact. Trust it is only for Allah's sake I do not have any interest in this. My email is .
Maqsood

JUJ replied on Tuesday, June 26, 2012 12:32 AM PST 
Depends from Contrator to Contrator.
I have seen gray structure contractor with the follow:

JUJ replied on Tuesday, June 26, 2012 12:39 AM PST 
Sorry, Sometimes you type a long mail and it is rejected by the server for some reason.
Anyways:
1. 4 tanks (2 Dirty, two fresh water)
2. Grills in windows,
3. Boundry wall and gate
4. Parapit wall at roof and mumty
5. Electric conduits
6. Water and Severage Conduits
7. Heat Insulation for roof
Material:
1. Model steel
2. DG or Mapple Leaf sement
3. Good Quality Bricks
Mixes
1. Roof plaster: 1:3
2. Walls 1:4
3. Chunai 1:5
Rate: 1200/sq ft. with basement (10 marla)
regards
Let us hope this email is not rejected.