Lahore Real Estate Forum

Thursday, November 26, 2026 01:08 AM
Total records39
Records per page10
Page views today49,003
Page views last hour2,283
(19)
Tuesday, February 5, 2008 07:32 AM PST 
Comments closed
new Islamabad airport

Downer EDI subsidiary, CPG Corporation, to provide full design consultancy for the new Islamabad International Airport's Terminal Building, Pakistan
Downer EDI Limited (Downer EDI) announced today that its Singapore-based business, CPG Corporation (CPG), has been appointed by Pakistan's Civil Aviation Authority to provide full design consultancy services for the new Islamabad International Airport's Passenger Terminal Building.
CPG's concept design for the Passenger Terminal has lead to a full design consultancy, including planning, architectural design and engineering consultancy for the terminal, and is the latest addition to CPG's growing portfolio of prestigious airport developments worldwide. The new airport will be Pakistan's first green field civil aerodrome of world-class standard to be built at an estimated cost of US$400 million. The airport will commence construction in 2008 and is expected to be operational by 2010.
The ground breaking ceremony held on 7 April 2007 was attended by Pakistan's President Pervez Musharraf, Prime Minister Shaukat Aziz, and several other senior ministers. This ceremony marked the commencement of ground levelling work which is the first phase of the development. The second phase includes the construction of the Passenger Terminal Building.
The new airport will be fully equipped with state-of-the-art facilities for maximum passenger comfort and convenience. In addition to the Passenger Terminal Building, an airport village is envisaged, comprising commercial facilities and sufficient space to cater to the high ratio of visitors that accompany passengers, as well as possibly a monorail.
The Terminal Building will have a modular design to handle an annual traffic of 6.5 million passengers, keeping in mind the need for extensions to be built in the longer term to accommodate future passenger traffic.
CPG will employ environmentally sustainable strategies such as day lighting and sun shading to reduce the energy usage of the building, as part of a design approach that will ensure a technologically advanced interpretation of this rich cultural heritage including the cradle of the Ghandhara civilisation as well as their long Islamic history.
CPG Consultants' specialised division, CPG Airports, the same team behind the master planning and design of Singapore Changi Airport Terminals One, Two and Three, will undertake this project. Some of their more notable airport projects include Wuhan Tianhe Airport's second terminal building in Central China, Ahmedabad's new International Terminal Building in India, Guangzhou Baiyun Control Tower in China and Can Tho International Airport in Vietnam
Emoticon :G: :flg
http://www.downeredi.com/Default.aspx?aCateId=1343
(18)
Tuesday, February 5, 2008 07:08 AM PST 
Comments closed
new Islamabad airport

This website is being developed to disseminating project-related public information on:
Executing Agency: Civil Aviation Authority (www.caapakistan.com.pk)
Project Management Consultant:
Louis Berger Group, USA (www.louisberger.com) in association with Engineering Consultants International (Pvt) Limited, Pakistan (www.ecil.com).The Scope of work includes preparation of Feasibility Study, Master Plan, Environmental Study, Pre-Construction Services (Prequalification,Tendering,Evaluation and Asistance to CAA in including QA/QC and Contract Management and Administration, Testig & Commissioning of the facility and Post Construction Services.
Design Consultant
1) Passenger Terminal Building
CPG Corporation, Singapore (www.cpgcorp.com) in associationwith Acorp, Mushtaq & Bilal, Mahboob Associates.
2) Airport Infrastructure
Airport de Paris International, France (www.adp-i.com) in joint venture with National Engineering Services Pakistan (pvt) Limited (www.nespak.com.pk)
Construction Contractor(s)
1)Preliminary Site Preparatory Works (Phase 1)
Husnain Cotex (www.husnain.com.pk) – IKAN (www.ikan.com.pk) Joint Venture has been awarded the work valued at over Rs. 1.0 Billion. The Scope of Work includes earthworks and construction of embankment for runway and main access road to the Project Site. The expected date of completion is December 2007.
2)Preliminary Site Preparatory Works (Phase 2)
Coming Up Soon!
Other Packages – To be decided

Jasim replied on Tuesday, February 5, 2008 07:38 AM PST 
sorry for not adding the website
here it is http://www.niia.com.pk/

Ali replied on Tuesday, February 5, 2008 10:05 PM PST 
It is good that our country is developing
(17)
Wednesday, April 25, 2007 09:31 AM PST 
Comments closed
oil

Pakistan shelves $3.5b plan to import natural gas from Qatar
24 April 2007
ISLAMABAD -- Pakistan government has shelved, at least for the time being, $3.5 billion plan that envisages import of natural gas from Qatar through 1830-km pipeline due to "non-availability of required gas quantities".
"It is not on the forefront", said secretary petroleum Ahmed Waqar adding "we are concentrating on IPI (Iran-Pakistan-India pipeline project) at the moment", he told this correspondent.
Sources in the petroleum ministry, however, said that the project sponsors Crescent PetroleumCrescent Petroleum of Sharjah had informed the government of Pakistan that gas quantities required for the project were not available in Qatar in the next 8-10 years. They said Qatar had long term commitments for Liquefied Natural Gas (LNG) exports and could not spare enough volumes for a pipeline project.
Pakistan, these sources said, had asked Qatar to enhance gas availability for the project up to 2.6 billion cubic feet of gas per day (BCFD) but it was not ready to go beyond 1.6 BCFD. A gas sales and purchase agreement (GSPA) has been under consideration of Pakistan government for the last few years but it could not be signed for some reasons.
The gas import plan from Qatar to Pakistan through an offshore pipeline was originally floated by Sharjah based-CrescentCrescent in 1999 but talks failed in 1995 over gas tariff between the two nations and the project could not take off. The project re-emerged and in 2000 Crescent PetroleumCrescent Petroleum signed a fresh heads of agreement for exclusive rights with Qatar government to export of gas to Pakistan.
It did not get top priority in Pakistan because of its relatively higher cost and technical complexities because of its deep sea route when compared with its competing import pipeline options from Iran and Turkmenistan.
Waqar said that Pakistan was still in the process of in-house consultations on the question of transit fee to be charged from India to let the gas pipeline pass through over 650-km territory in Pakistan.
Another official said a separate idea floated by Iran a few years ago of common user gas highway to dovetail Qatar's gas with Iranian for transportation to Pakistan and India had also been shelved even before serious discussions on the subject.
Pakistan's current gas shortfalls that hover around 300-350 mmcfd (million cubic feet of gas per day) are likely go up to 778 MMCFD by 2009-10 and rising to more than 11,000 MMCFD by 2025 because of rising needs and slowing down supplies at home coupled with no discoveries expected to be on line in the short-run.
Even with two gas pipeline projects and liquefied imports projected to materialise in the second half of the next decade, the country would still suffer more than 4,000 MMCFD of gas shortage between 2018 and 2025. New gas finds are not likely to be commercially productive before 2010-11.
The country's gas demand this year stands at about 4,000 MMCFD and will increase to 4,492 MMCFD in 2008 and further to 5,086 MMCFD in 2010. Compared with this, total supplies at 3,666 MMCFD this year would rise to 4,184 MMCFD next year and 4,308 in 2010. This means that the shortfall would range between 300 and 350 MMCFD in the next two years and increase to 778 MMCFD in 2010.
BY A CORRESPONDENT
© Khaleej Times 2007
Emoticon :t: Emoticon :t:
(16)
Monday, April 23, 2007 01:53 PM PST 
Comments closed

Emoticon :G:
The biggest private developer in uae Damac in pakistan.residential project in Islamabad, lahore and Karachi.
http://www.gulfnews.com/business/Real_Estate_Property/10120146.html
HTML code is disabled   Previous Page   Next Page