DHA ISLAMABAD LATEST SATUATION

Reference to property discussion no’s 45888 AT 5 JAN-2010.
Here I will give you latest information and new progress about DHA Islamabad projects and give the reply of Mr. imran comments about those project.
Actualy Mr imran did not proof me wrong but he accepted the fact i already told about all DHA projects in my post no. 45832.
But first of all, i will explain abot Mr. Imran Claim.
MR. IMRAN claim himself "The PROJECT MANAGER of DHA Valley". While project manager of DHA VALLEY is "Mr. Shahzad Iqbal". and Deputy Project Manager name is "Muhammad Usman". Both are from Habib Raifiq Private Limittid. This project is joint Venture of DHA, Bahria Town and Habib Rafiq. Habib Rafiq is developer, Bahira town is financer and DHA is Supervising as Client. If any body confused with Mr. imran claims and want to know about the Real Project manager then go to Rawat instrial State through Industrial road and stop at Sui Gas Station. Here is the Site office of DHA Valley. anybody can meet with the Project Manager and can certify my words. Mr. Imran can be employee of DHA Islamabad who is directed to reply my post and to satisfy the investers and members of DHA by giving false hopes and to keep people silent because they can create problems for DHA by Supreme Court and High court.

Visitor replied on Saturday, January 9, 2010 10:03 PM PST 
Saleem Awan Sahib, please throw some light on Phase I Ext. Understand that nothing (except interchange) has done so far but please do share what the management has planned or planning for the development of Phase I Ext. Regards

MFB replied on Saturday, January 9, 2010 11:17 PM PST 
AOA Saleem
I already have a plot in Sector E, DHAI Phase II(Ex Commoners Town). Do you think this is a good investment if I purchase another plot? if so which Sector(BC,CC, DC, EC) do you suggest?
Thank you for all your efforts in answering the questions.
Regards

SALEEM AWAN replied on Sunday, January 10, 2010 01:15 AM PST 
Mr. MFB
you should purchase plot in Sector-B which is almost developed.

MFB replied on Sunday, January 10, 2010 06:02 PM PST 
AOA Saleem
Are there any 4 marla commercial plots for sale in DHAI Ph II-Sector BC,CC, DC & EC(Ex-Commoners Town)? Do you know the price?
Secondly, I am based in Canada & am not aware of the actual ground situation, can we start construction hopefully within this yr in Sector EC.
Thanks again for all your efforts in answering my questions.
Regards

Rizwan replied on Friday, February 19, 2010 05:17 AM PST 
Saleem Sahib!
i have a shop at undergroung level in sec 2 at in Islamabad DHA "shop a shop" plaza .I have paid 20,00000.I am in toronto and want to sell it. Do you have any rough idea of sale price there.We will be geting pocession around mid of 2010.I will appreciate your responce. Thanks

ashiq hussain replied on Sunday, June 13, 2010 06:17 AM PST 
reg no:dyi-039155
plot no:107
want to know my status
(392)
Friday, January 8, 2010 12:50 AM PST 
Comments closed
plots price

I would like to get some information on pak Arab Housing scheme lahore.What is the current rate there in blocks A b and c and also can someone tell me about the current position of ferozepur road there.Is it a good option for middle class people for making house there? Please do reply. :pkf

Visitor replied on Saturday, January 9, 2010 12:24 AM PST 
Ishfaq Sahib where is exact location of Arab Housing Scheme and what is its development present status if known to you. Thanks
(391)
Thursday, January 7, 2010 08:06 PM PST 
Comments closed
Suggestion needed

Dear All;
I need the views/suggestions of all respectable readers of this forum.
I have a 10M plot in Sector B, Bahria town. I am planning to start construction of my house in 2-3 months time. Before doing that,i want to find out if there are any risks/hurdles/surprises involved in constructing the house. For example, the biggest concern i have come to know is that Bahria town is owned by a single owner/family and if something goes wrong against him by any coming government, what would be the future???. If Bahria/Malik Riaz goes down bcoz of his problems with any government and government takes over Bahria,then
1. what would happen to the people living in BT (quality of services)
2. How would the sale/purchase of properties go in the area.
I am just sharing the worst case scenario keeping in view the single man ownership and .
I personally have nothing against Bahria or Malik Riaz but i have to calculate the risk on my hard earned investment.
Best regards to all....Ahmad Raza

Azad K replied on Friday, January 8, 2010 10:45 AM PST 
I remember someone saying the same thing to me that it is a one man band a few years ago, and my reaction was that great works are not created by committees but by strong individuals. I would rather have a good product controlled by one person than a mediocre product controlled by a committee. Having said that the courts in Pakistan should act as a check and balance against strong individuals and safeguard the public interest.

Azad K replied on Saturday, January 9, 2010 12:41 AM PST 
If you have a plot on the ground then it does not matter what happens to Riaz Malik as nobody can take the plot away from you. If you don't have a plot on the ground then they can say that they don't have enough land or that there is no money to complete development. However people like Mr Malik rise to the top with the support of all political forces and will remain in everyones good books, whoever comes to power that is my personal view. The bigger Bahria Town becomes and the more people that work for it and the more the people live there the difficult it becomes for anyone to harm Bahria.

Hussain Kaisrani replied on Saturday, January 9, 2010 03:17 AM PST 
Ahmad Raza Sahib,
Thanks for your remarks about me. I am only a student of property related matters and learnt every thing from this site, its members and its organizers.
Your questions are very much related to future and my knowledge about future is very limited so I avoid commenting about these matters.
For being on safe side one can adopt registry process. I personally do not think that any serious problem may occur to Bahria Town existing plots and houses as every houses is approved from Govt. authorities like TMA etc. Besides this Bahria Town has its members in all sphere of life. Thousands of resident will be able to manage the society if Malik Riaz Sahib has not yet made any system for running it properly after his death.

Hussain Kaisrani replied on Saturday, January 9, 2010 03:19 AM PST 
I missed to read Azad K Sahib's views before posting my comments. He has written more nicely what I wanted to say. Thanks Sir. People like him may be called GURU's of property.

abce replied on Saturday, January 9, 2010 05:01 AM PST 
Property dealers are like Animals, they are the gandi nali kut-as. Ashraf sahib please don't base where to invest your hard earned life savings on the views on these kut-as.

Saqib replied on Saturday, January 9, 2010 07:57 AM PST 
Mr. Raza,
I like your commitment and attitude for research. You have to weigh the alternate options. Assume the answer to all of your questions is not positive. Pick up the option which you feel is better than Bahria or satisfies your question. I do not know which country you are in but if USA's economy can go into doldrums despite the best intellectual capital available with them and Dubai real estate can have all the problems, Largest banks in USA can get bankrupt, I do not really know what kind of guarantees you are looking for. Evaluate what you know and what you can reasonably foresee and put the trust in Allah.
you can foresee. And trust in Allah.

Ahmad Raza replied on Saturday, January 9, 2010 10:14 AM PST 
Dear all,
At first, i would like to thank Mr. Hussain kaisrani for writing a response and Mr. Azad for his valuable comments.
I know a lot of qualities in BT, thats why i bought a plot there and am planning to build my house. Saqib Sb, I am not looking for any guarantees. What i am trying to do is to evaluate the worst case scenarios, which may be created after Malik Riaz (i.e. his death, going to jail, fighting between his daughters and son for the ownership of property). I really wish and pray that nothing like this ever happen to BT, Malik Riaz or his family. I know they have done a lot of hardwork and efforts to reach where they are today.
I am concluding on following points here.
1. Mr. Kaisrani said that the houses are being built after approval from TMA which means you have records at BT office and TMA office for houses only and not the plots. Third place can be the bank if you want to get some bank loan.
2. Mr. Azad had a point that if you have possession of ur plot, have built a house on it and living there then no one can take this property from you.
3. In the end i think, if something goes wrong, then sale/purchase of property will slow down for a while until things get clear in public opinion.
4. Quality of services might also be affected until BT management again gain strength or people in BT will make some organisation and run it by themselves. I know that there is already one small group of people in BT who elect their general secretary and other positions in the group.
5. I really dont know if Mr. Zardari or any other political force in government takes over the BT office and records then what will they do with it. How the transfers will be done, by patwari or who??? Just look what happened to Khanani and Kalia and where all this money is gone??
Well readers, I am not preaching here but i am discussing/addressing the negative points of BT which were told to me by various property dealers and some of those were true by the way...but not all.
Ashraf Sb, Before buying my plot, i found out that Bahria town is approved by TMA not LDA. NFCII behind BT is now approved by LDA so technically speaking BT should be approved by LDA as well. It would be a positve step and will improve the credibility of BT.
This is all what i think...if someone has better information, he is welcome to share. Too much discssion on this topic might give impression that we are lobbying against BT soI dont want to write a lot on this bcoz i dont want to create problems for the management of this forum.
Thank you very much to all...Ahmad Raza

Azad K replied on Saturday, January 9, 2010 10:20 AM PST 
Mr Kaisrani thank you for your comments although I am not an expert.
Mr Raza nobody has a crystal ball and as Saqib has rightly stated that there is always a risk in business and investment. I cannot make your decision for you, I cannot give you all the information that you need. The world is imperfect and we must do the best that we can. I can say that the standards of schemes are generally increasing as people have or will become acustomed to the best services so I don't think that things will generally get worse but I think schemes will generally improve in the future.
You need to decide a) what is your goal or objective b) what options do you have c) which is the best option keeping in mind your goals.
Nobody needs to tell you what grounds to invest in. The ground for investment should always be the return on capital in a given timeframe.If everybody knew where they can get the best return on their money and without taking any risk then we would all be very rich. If you don't know where to get the best returns then you have to go for the option that you would feel comfortable with, assuming that your investment does badly.

Azad K replied on Saturday, January 9, 2010 12:23 PM PST 
Regarding your last post Mr Raza, in my mind the following things would happen in your given scenarios.
a) Riaz Malik dies. His son is taking an active role in the management of the company and it has a strong top management that will still be in place and remain.
b) Riaz Malik goes to jail. His son is taking an active role in the management of the company and it has a strong top management that will still be in place and remain.
c) Inheritance of Bahria following the demise of Riaz Malik. A person like Riaz Malik should be smart enough to leave behind a will and to groom the future leadership of the company. Bahria will still remain and so will the management, who has what shareholding in the company after Riaz Malik's death is irelevant to us.
Another scenario that you did not mention is what would happen if Bahria Town becomes bankrupt or ceases to trade. The plot and houses on the ground will still remain, the infrastructure will still remain. Somebody else may come in and acquire Bahria or administer it or its assets or the housing schemes. The only people to suffer may be owners of files where development hasn't taken place, but hopefully they should still own the land in question as Bahria cannot run away with the land unless Bahria has sold more files than it has land.
Sometimes there is no right or wrong investment decision but just what you feel comfortable in investing in, or if not a investment then where you feel comfortable living and what best matches your criteria.

Visitor replied on Saturday, January 9, 2010 09:50 PM PST 
Mr Azad K. Thanks for sharing your knowledge of analyzing the situation on the basis of available information while keeping in view the objectives/goals. I do agree that in each case you can't totally eliminate the risk but one may choose the way with minimum risk. Wishing you more wisdom, happiness and sucessess.
Mr Ahmad Raza. Definitely your post on the issue has generated many valuable information for the visitors of this site including me. Hope all of your presumptions are answered by the learned friends including Mr Azad K. Wish you best of luck

Ahmad Raza replied on Sunday, January 10, 2010 05:12 AM PST 
Dear Visitor,
I have tried to summarize the major concerns/issues regarding BT, which i have been hearing from many property dealers and basic objective was to know what others think about these questions. Other people like me might have these questions in mind so i think this is a healthy discussion.
Mr. Azad:
Thanks for your observations/comments.
In one of your posts you said that ""Mr Raza nobody has a crystal ball and as Saqib has rightly stated that there is always a risk in business and investment. I cannot make your decision for you, I cannot give you all the information that you need""AND ""Nobody needs to tell you what grounds to invest in""
My response is that i had already made my decision and bought a plot in BT few months ago. I am not looking towards someone else to make decisions for me. I am also not looking for a crystal ball.
I just floated the questions which were in my mind. Objective was to analyse some worst case scearios, bring these views in public and ask the pinion of all respected readers of this forum. You seem to understand my questions in your third reply of this post but its ok.
But i appreciate your response. You seem to know too much about Malik Riaz Son. Do you really think h is capable of handling the company. I wish and pray that God give a long life to Malik Riaz and we dont see any of the scenarios. I dont think something bad will happen when he is in office as he understand the pakistani style of doing buisness.
Best regards to all....
(390)
Wednesday, January 6, 2010 02:49 AM PST 
Comments closed
DHA Islamabad

Reference to property discussion no’s 45823, 45824, 45832, 45837 & 45845 posted by Mr. Saleem Awan and no. 45778 posted by DHA Ordinance
A very happy new year to all the readers. May God bring peace and bless his bounty worldwide in this and coming years.
I am Project Manager of DHA Valley but I am writing as a visitor to this website and as someone who has an interest in real estate development and future projects. My observations are based purely on available statistical data and existing facts.
As for as my information no one name Mr. Saleem Awan is working in DHA Islamabad. If he is an employee, he should come often with more info about himself.
I would like to highlight some project-wise facts about DHAI projects in succeeding lines.
DHA Phase-II
Fully develop phase. Sectors comprising from A to J. Situated on main GT Road and Islamabad Highway. Ready for possession.
DHA Phase-II (Extn)
Initially sectors were comprised from A to Q but replanning of phase segregate it into 4 main sectors (from A to D). Situated on Islamabad Highway and in-front of DHA Valley made the location really prominent. Development work is under process. The earlier the sector (out of 4) the sooner the possession is expected. Conversion of files to allotment letters are also in process. DHA Expressway (8.2 km, 6 lanes) are near to completion, with some work remaining on bridges/crossways. It will connect Islamabad Highway to DHA Valley through Phase-II (Extn).
DHA Phase-I (Extn)
Interchange is under constructed and construction work is in progress. DHA is planning the remapping of sectors to pace-up the work. Due to current market crunch exact date of possession cannot given but it is under high priority of DHA.
DHA Valley:
Comprising into 20 sectors, DHA Valley is a bunch of quiet a few projects. Master plan is designed by M/S OJMR Architect, while Habib Rafique and Bahria Town are partners is development. Other renowned companies like EMAAR, AREAA, MIDJAC & HARO are also associating DHA in its’ projects. Development work is in progress and possession is expected to given from 2012 starting from 5 & 8 marla DHA Homes. Its’ an environment friendly place and will be pioneer in community development in terms of size and facilities when completed.
Country’s current real estate situation, economic recession and law and order condition is well known to everyone. Real Estate prices are adjusted nationwide. In recent times, there’s a requirement of sound management team to meet current challenges. DHA has this credibility to deliver. William Channing once said, “Difficulties are meant to rouse, not discourage. The human spirit is to grow strong by conflict”.
I recommend members/visitors to use this site only to facilitate others. I do hope the administration of web site/CMY will look after the above referred mails like property discussion no’s 45823, 45824, 45832, 45837 & 45845. Attitudes are more important than facts.
Suggestions/comments are welcome. Thanks and Best Regards
Imran

:1)

Ch Khalid replied on Wednesday, January 6, 2010 05:35 AM PST 
Dear Imran
Which are the best sectors in pri as per your opinion in DHA Phase-II.

Visitor replied on Wednesday, January 6, 2010 05:47 AM PST 
Imran Sahib thanks for your detailed information for the benefits of all visitors. Please clarify with reference to DHAI Phase I Ext:-
(1) Is the contract for development is awarded? If yes then who are the contractor(s)
(2) Is the development work is in progress other than interchange
(3) When the development is to complete as per operative contract agreement ?
Thanks in advance

Azad K replied on Wednesday, January 6, 2010 08:26 AM PST 
I think DHA needs to innovate and creditability is very important for DHA, as when it is lost it will be difficult to regain. Before the projects are launched DHA should clearly state when everything will be completed and when possession will be offered, and it should strictly stick with that timeframe otherwise it should compensate the plot owners who have kept their end of the bargain. As time progresses the public should be informed about updates regularly as this will stop people creating rumours, and increase the credibility of DHA. DHA website should be regularly updated with news and progress. DHA should stop taking its customers for granted and aim to deliver good customer service, and deliver upon its promises. If you have the land and have the money then nothing should stop the development of schemes, and it is wrong to make excuses to justify incompetence. Somebody needs to take responsibility.

Azad K replied on Wednesday, January 6, 2010 09:56 AM PST 
P.s OMJR Architects from the U.S is mentioned in the details in order to suggest that the planning is done by a large reputable firm with expertise in this field yet OMJR does not even have a website. BTW would it not have been better to award the contract to a firm of Town Planners as opposed to Architects. Architects design buildings they don't design neighbourhoods.

MFB replied on Wednesday, January 6, 2010 02:46 PM PST 
AOA Imran
I have a 1 canal plot in Sector E(Ex-Commoners Town)-DHAI Phase II Ext.
In view of the above, can you please let me know has the sector E(Ex-Commoners)name been changed & secondly is this area under DHAI Ph II OR DHAI PHASE II Ext.
Thanks

A Response............... replied on Wednesday, January 6, 2010 06:33 PM PST 
It is a good effort to clarify many doubts but there are many more. I suggest Editor of DHAI newsletter must come up to satisfy the members of DHAI so that we are not dragged by the negative propaganda by few. Nice to see someone has taken the initiative to address through this very important forum which is read by concerned people world wide. DHAI have huge staff and officers who are paid out of the funds collected from the members. Administrative DHAI must take a note to put in best efforts to imrove communication betwen the members of DHAI and the administration. Some of the members have invested all of their savings and under debts after investing in the DHAI projects advertised beautifully. I have seen very poor lot of Pakistan praying( BADUAIN ) against the planners of DHAI who have made them more poor. One can visit the DHAI offices and can see all the staff enjoying in their luxurious offices with AC on and having very good time at the cost of thousands of poor investors. WHO IS GOING TO WAKE THEM UP! For GOD sake read these lines and work hard to regain the hard earned money of your brothers Pakistani. Spending time to enjoy all types of perks will not solve the problems.....

MFB replied on Wednesday, January 6, 2010 10:31 PM PST 
AOA Imran
I have a 1 canal plot in Sector E(Ex-Commoners Town)-DHAI Phase II Ext.
In view of the above, can you please let me know has the sector E(Ex-Commoners)name been changed & secondly is this area under DHAI Ph II OR DHAI PHASE II Ext.
Thanks

MFB replied on Wednesday, January 6, 2010 10:33 PM PST 
AOA Imran
I have a 1 canal plot in Sector E(Ex-Commoners Town)-DHAI Phase II Ext.
In view of the above, can you please let me know has the sector E(Ex-Commoners)name been changed & secondly is this area under DHAI Ph II OR DHAI PHASE II Ext.
Thanks

Imran replied on Thursday, January 7, 2010 01:43 AM PST 
Reply to Ch Khalid:
Dear Khalid, Sectors nearer to Main GT Road or Islamabad Highway will be on preference in coming times in Ph II. For availability of plots, DHA Property Exchange can help you out (/244). It is your own decision in the end but do inquire to the neighborhoods where you want to purchase.
Reply to Visitor:
Dear Visitor, I dont' mentioned much regarding Ph.I (Extn). The project is under high priority of DHA, as I said the remapping and other development process are under way. I do hope that soon DHA will come with a concrete plan regarding this particular project.
Reply to Azad K & A Response:
Dear Azad & Mr. Responcse, I invite you both of you to visit DHA once and see how things work here. One reason I You will find the answers of your

Asad replied on Thursday, January 7, 2010 02:06 AM PST 
dear brothers i ,am ashamed to read the comments of the so called Project manager.Please tell me where on earth is the new map? as of todat a bundle of lies.4/5 months a go DHAI advertised in news poapers that the map along with the new ballot would take place by December 2009, nothing happened.then what is going on ( i am talking about Phase 2 extension ) & now the so called project manager gives a statement shame on him.mR Azad K is correct the so called developer has no site on the web

Imran replied on Thursday, January 7, 2010 03:09 AM PST 
(Please ignore the one reply before)
Reply to Ch Khalid:
Dear Khalid, Sectors nearer to Main GT Road or Islamabad Highway will be on preference in coming times. For availability of plots, DHA Property Exchange can help you out (/244). It is your own decision in the end but do inquire to the neighborhoods where you want to purchase.
Reply to Visitor:
Dear Visitor, I dont' mentioned much regarding Ph.I (Extn) before. The project is under high priority of DHA, as I said the remapping and other development process are under way. I do hope that soon DHA will come with a concrete plan regarding this particular project.
Reply to Mr. Azad K:
Thanks for imposing your confident. OJMR is the Master Planner of DHA Valley. DHA has its own Town Planning Directorate to design neighborhood and other details.
Reply to Mr. Azad, A Response... & Mr. Hussain:
My dear friends, I invite all of you to visit DHA once and see how things work here. You will get your answers. One reason I find, no official reply was given by the DHA to the questions arises on different private discussions but neither DHA is bond to do so. It has to be answer by someone, as it is hurting the members. Delivery/Possession has been delayed in various projects nationwide. I am not covering DHA for anything delayed but if comparison with other projects of similar dimensions, DHA is very much comparable. In times of recent recession and market situation 3-4 years are nothing in real estate projects. Neither the boom five years before was precise nor the current time. It has to be adjusted with its real pace in near future or future. Sometimes, things are not as good or as bad as we explain them.
Reply to MFB:
Commoners Town was merged in DHA as Ph.II (Extn). To precise, if you travel from Rawat Chowk (Rawalpindi) to Faizabad (Islamabad), on your left side it is Ph.II (Proper) and on your right side it is Ph.II (Extn). Your plot is in Ph.II (Extn). I mentioned the replanning of sectors are on cards. You can ask from concerned staff for telling your plot no.
Reply to A Pakistani:
You can contact our Town Planners. They will be in better position to answer your specific inquiry.
Reply to Asad:
Probably you havent' check the reply on ojmrarchitects.net. Even if they dont' have any, its' not my responsibility. Please be update. I just want to facilitate the members here.
Take Care

A Pakistani replied on Thursday, January 7, 2010 03:46 AM PST 
Dear Imran,
Thanks once again for your quick response. You advised me to contact your Town Planners. Then why on 1st place you have claimed that "Phase II fully developed and ready for possession".
2ndly who is your Town Planner to contact with? With Regards!

saad mir replied on Thursday, January 7, 2010 03:49 AM PST 
dear mr. imran. i would be greatful if you give me some information about agosh 2 merger with dha. i bought a file some 5 years ago .there were always rumours it will merge soon but no confirmation as i live outside pakistan.best regards

MFB replied on Thursday, January 7, 2010 11:38 PM PST 
AOA Imran
I am having a difficult time to understand. Please no offence to both of you Gentlemen yourself & Saleem Awan are working for the same organization but have 02 different views i.e., you have stated Ex-Commoners Town(Sector A to E) is part of DHAI Ph II Ext where as Saleem has mentioned these sectors are now part of DHAI Ph II.
In view of the above, please clarify what is the current & correct stand on Ex-Commoners Town(Sector A to E.
Thanks

Ali from Jeddah replied on Friday, January 8, 2010 02:09 AM PST 
As more we pay installments of DHA Valley, loss is getting higher, question is where we will end-up? Possiblly total amount paid until last installment, loss will be half amount paid, is it so? What an investment it is, your comments please Mr. Imran..................

OverseasFurious Pakistani replied on Friday, January 8, 2010 02:22 AM PST 
Dear Imran,
What a bundle of lies, i have a plot in Ex commeners town earlier Block B, which is near to GT road, who has given the right to replan the plots on good location we bought years before DHA and Commeners town merger. Besides plots in old sectors as B and E blocks of ex-commers town were priced higher as compared to C and D blocks.
I have put all my savings in the B block plots.
DHAI islamabad is loosing its credibility very fast. Too me you guys are bundle of cheats just like the rest of the lot.
May god destroy your families, your children, your livelyhood the same way you destroy and rob common people of Pakistan.

Visitor replied on Friday, January 8, 2010 02:23 AM PST 
Imran Sahib you may please get some updated information from the concerned one of DHAI about Phase I Ext and throw some light on it for the benefits of all visitors. Regards

OverseasFurious Pakistani replied on Friday, January 8, 2010 02:34 AM PST 
Too furtheradd, i think the effectees of DHAI excommerns town should group toghther and take DHAI to supreme court atleast it will give a good kick at your backs to stop wasting our time and hard earned money like this.

Rashid replied on Friday, January 8, 2010 03:03 AM PST 
Mr. Imran You said EMAAR, AREAA, MIDJAC & HARO Companies are working for DHA, while Only EMMAR has worked for maddows near Ex-commoners town. While AREAA and MIDJAC in working only in Bahria New phases like Phase-7 & 8. AREAA is turkish company developing the houses in bahria town. Your information is not correct.

overseas replied on Friday, January 8, 2010 11:22 AM PST 
Does any one has any news/status about DHAI OverSeas Sector. We paid much higher price(40,000 UK pounds for 1 kanal) 4 years back for the plots and were promised to get development done by 2009. No news so far....

ZAIN replied on Friday, January 8, 2010 09:22 PM PST 
I MET MR SALEEM AWAN YESTERDAY. HE IS A ABNORMAL. I THINK HE SHOULD CONTACT WITH SOCIOLOGIST.

ZAIN replied on Friday, January 8, 2010 09:24 PM PST 
SALEEM AWAN IS NOT EMPLOY OF DHAI.

SALEEM AWAN replied on Friday, January 8, 2010 09:29 PM PST 
HAPPY NEW YEAR TO ALL PAKISTAN PEOPLES.
Here i will reply for Mr. Imran post. in which he wrote the most fuuny jokes of the New Year.
MR. IMRAN! You claim yourself The PROJECT MANAGER of DHA Valley. While project manager of DHA VALLEY is "Mr. Shahzad Iqbal". and Deputy Project Manager name is "Muhammad Usman". Both are from Habib Raifiq Private Limittid. This project is joint Venture of DHA, Bahria Town and Habib Rafiq. Habib Rafiq is developer, Bahira town is financer and DHA is Supervising as Client. If any body confused with Mr. imran claims and want to know about the Real Project manager then go to Rawat instrial State through Industrial road and stop at Sui Gas Station. Here is the Site office of DHA Valley. anybody can meet with the Project Manager and can certify my words. I am not working in DHA Valley but i am working in DHA Office.

MFB replied on Friday, January 8, 2010 11:16 PM PST 
AOA Saleem,
With reference to Imran's statement,"Commoners Town was merged in DHA as Ph.II (Extn). To precise, if you travel from Rawat Chowk (Rawalpindi) to Faizabad (Islamabad), on your left side it is Ph.II (Proper) and on your right side it is Ph.II (Extn). Your plot is in Ph.II (Extn). I mentioned the replanning of sectors are on cards. You can ask from concerned staff for telling your plot no"
In view of the above, I already know know my plot # & its a corner plot in Sector E(Ex-Commoners Town) does this mean, the plots are going to be reshuffled or replaned with new plots nos. Please confirm.
Thanks
Is it correct as Imran has mentioned that plots

AnotherOverseasPakistani. replied on Friday, January 8, 2010 11:55 PM PST 
I have some investments in DHA and other projects in Pakistan. The main problem of overseas people are lack of communication. In my humble suggestion if communication be made strong, we will not only be satisfied but can also produce significant role in the development of our beloved country. As a Pakistani if you do not get the feedback on time than it is natural to be worry.
I have mix experience in this regard. Recently I am in Pakistan for a leave. Ihave also visited in DHA Islamabad office for updation of my record. I have found the staff properly working and dealing. Atleast, I am satisfied the i have been treated. I think Imran has took an initiative to give answers arising in this forum. We must value his effort. All of us known that important decisions are not taken on Project Manager level. Although my investments in other projects are also come into half from level, but the overseas Pakistani are satistied that atleast they have invested in DHA and DHA has some credibility. May I pray Almightly Allah that what happened in Peshawar and Karachi and other places reently, we will come out of it and will be again on the road of development INSHALLAH.
In last. I have work in a multinational pharmaceutical company, although i am a foreigner but i have to obey the rules of my company and cannot and will not say anything against it. The site is one of the main source world wide so kindly do not spread the wrong messages world wide.
Allah Pakistan ki Hifazat Karey. Ameen
Muhammad Saeed
An Overseas Pakistani...

Adeel replied on Saturday, January 9, 2010 01:05 AM PST 
PH I Ext balloting 2005 and not a single street made in 05 years. No signs of Ph II Ext and oversees block on ground till date. I think that DHAI affectees should write about their genuine grievances to Army Chief. May be then DHAI is forced do something to take people out of this messy situation.

SALEEM AWAN replied on Saturday, January 9, 2010 02:05 AM PST 
Mr. OverseasFurious Pakistani! Dont' disheart and Don't be emotional due to poor knowledge and disinformation of Mr. imran.
I will brief you, Mr. MFB and all other Ex-commoners town plot memebers
about Ex- Commoners town.
Ex-Commoners town was a private housing scheme launched in 2004. It has four sectors (B,C,D,E). It was merged in DHA in 2005. Then it name was changed from Commoners Town extension to DHA Phase-2 extension and it was a small part of DHA phase-2 extension. at the scheme gate they wrote also DHA Phase-2 Extension. In 2008 It was renamed to DHA phase-2 Ex-commoners town and become a part of DHA phase-2. Board at Gate was also replaced and they wrote it "DHA PHASE-2 SECTOR BC, CC, DC & EC"
sector BC means "sector-B of Commoners town".
While DHA PHASE-2 EXTENSION become a separate project which is 6 KM far from this ex-commoners town. This extension has sector-A to T. in market the files of extension are available. files of sector A~K has higher price while sector L~R has lower price. To finish this disadvantage of lower prices, DHA has distributed the scheme in four major sector i.e A,B,C & D. But new map is not yet issued because it will be designed by OJMR archetects (USA). So, the work at site is pending due to design and Drawings.
I think you understand the differnce between DHA phase-2 Ex-Commoners town and DHA phase-2 extensino. Your plot in sector-B should be at same location where it was satuated. only some plots are replaced due to Ling river. If you tell me your plot no. i can tell you the location.
Dont' worry and don't listen to Mr. Imran who is misguiding the people. DHA is also responsible for this confusion because they change the name of Ex-commoners town many times. also, they are confusing the members of DHA Phase-2 Extension and sector planning.
DHA should first decide that what they want to do and then annouce something. otherwise there will be no difference between politicion and DHA.

Visitor replied on Saturday, January 9, 2010 02:56 AM PST 
Saleem Awan Sahib please also throw some light on Phase I Ext like contract of development (other than interchange) is awarded to someone by DHAI or yet to be awarded OR what the management is planning about it? Thanks an advance

AnotherOverseasPakistani. replied on Saturday, January 9, 2010 02:58 AM PST 
Saleem Sb. every one has the right to have its say. I am telling you my experience regarding DHA. I have investments in DHA Phase II Extn and Valley projs so i am very keenly see the developments in the site and looking for possession to build house. yes i am satisfied with the development of DHA Valley and Overseas but work should be expedite in Ph.II extn.
But I again doubt you work in DHA, the way you speak against DHA (even they are wrong)...

saad mir replied on Saturday, January 9, 2010 08:29 AM PST 
thankyou mr imran for your reply. i will look forward if you can get some information about agosh. wslam

SALEEM AWAN replied on Saturday, January 9, 2010 06:55 PM PST 
reply to mr. Another overseas pakistani
DHA OVERSEAS block is started 3 years ago. but only gate, marketing office and approach road 500 meter is constructed only. nothing else.
If you are r satified with this progress then no problem.
I Don't speak against DHA, I just inform the invertors about the facts on ground.

Dr. Mudassar replied on Saturday, January 9, 2010 11:05 PM PST 
Imran I have a plot in Valley Overseas which I want to give it to my daughter. Kindly tell me the procedure.

Imran replied on Sunday, January 10, 2010 01:01 AM PST 
Reply to Rashid:
AREAA, MIDJAC and HARO are working on Defence Villa project Ph.1. 11 Marla Villas can be seen on the site. Yes they are also working in Bahria Ph.8.
Reply to Saad Mir:
Latest of AGOCHS II is this. Decision of Sale/Purchase of plot will be intimated soon. Please remain attach on official site.
Reply to Dr. Mudassar:
DHA Valley (Overseas) plot can be sale/gifted on this stage. You can open your file and Sale/Gift to someone. Almt Ltr can be received after half inst. File opening is available from Dubai office as well.
Take Care
Imran

Zulfiqar Ali _ U.A.E. replied on Friday, January 22, 2010 02:56 AM PST 
"TOP IMPORTANT"
Please spare few minutes to go through below mails regarding my concerns on OVERSEAS SECTOR in DHAI Phase-2 extn.
From: zulfiqar ali <>
Subject: Re: Shifting / Re-Location of Plots Overseas Sector - NO WAY
To: "Assistant Manager Finance" <>
Cc: "Finance Dte" <>
Date: Monday, January 18, 2010, 5:48 PM
Plot # 11 in village-1 Overseas sector DHAI ph-2 extension
Please expedite to fix this discrepancy, since i never asked for relocation of my above plot from Overseas sector to any other location. Therefore fix the record by retaining my plot in Overseas sector.
Thanks.
Sincerely,
CHAUDHRY ZULFIQAR ALI
UAE.


--- On Mon, 1/18/10, Assistant Manager Finance <> wrote:
From: Assistant Manager Finance <>
Subject: Re: Shifting / Re-Location of Plots Overseas Sector - NO WAY
To: "zulfiqar ali" <>
Cc: "Finance Dte" <>
Date: Monday, January 18, 2010, 8:58 AM
Dear Sir,
We have received your e-mail and your case is under process we will intimate you management decision in due course of time.
Raheel Yameen
AM Finance
-----Original Message-----
From: zulfiqar ali <>
To: Assistant Manager Finance <>
Cc: Finance Dte <>
Date: Sat, 16 Jan 2010 02:06:26 -0800 (PST)
Subject: Re: Shifting / Re-Location of Plots Overseas Sector - NO WAY
In reference to your attached mail, below please find my reply.
As confirmed to you physically during visit to your office on , i hereby reconfirm that i would like to retain my plot (# 11 in village-1) in overseas sector. Therefore kindly do not relocate my plot to DHAI ph-2, as proposed in your attached mail.
The remaining 2 installments will be paid when plot is developed, therefore waive the surcharges if any.
However i draw DHAI attention to the following solemn concerns and facts.
In May-2005 Overseas sector plots were sold at around 4.5 million PKRs.
Later insensitively Development charges of US$ 16,500 added, without any justification and information.
(Development charges increased from none to 600,000 PRs, then 16,500 US$)
Above paid amount of 4.5 million PRs in Y-2005 (five years before)
had a good value to buy more than one plot in any of DHAI sectors.
DHAI earnings not stopped here, as US$ 16,500 further earned by DHAI from its helpless customers.
Now after paying above huge sum of money and waiting of 5 years, DHAI is proposing relocation of plot to ph-2.
Well in order to settle on that I request DHAI to kindly arrange a super heart especially for a customer,
who was vowed development of overseas sector in around 3 years time,
who was dreamed highly standard, luxurious development by international firms,
who has paid above mammoth total of funds,
who waited for 5 years,
who kept and keeping on paying additional money,
who sees recently announced projects already started getting developed,
Finally i want DHAI fulfilling its commitments and obligation.
Looking forward for an appropriate compensation on above excessively paid Land and Development charges and suitable allocation of the plot (Ccorner plot on main Boulevard) within OVERSEAS SECTOR .
As confimed by you in attached mail letter development of Overseas sector by mid-2010 will be some relief for its customers.
Submitted for your kind consideration.
Sincerely,
CHAUDHRY ZULFIQAR ALI
U.A.E.
Dear DHAI Management,
Below herewith, please find my solemn concerns on Development and Land charges. Relevant mails sent previously by the undersigned on the subjected issue dated 11-Dec-2005 and later may kindly be referred as well.
I seek Fair dealing and kind support from DHAI on this issue please.
It may considrately be noted that I had purchased one kanal plot # 11 in village-1 of overseas sector - DHAI, after making a one shot payment of over 4 million pak rupees in MAY-2005.
We were informed that overseas sector will be developed in 2 - 1/2 to 3 years time. However as of today one could not find any significant development on the site.
With great concern it is pointed out that same plots were later offered in less than 2 million pak rupees and that too on installments. After well aware people got benifitted from this cheaply offered and gifted price, the charges were later enhanced to US$ 85,000.
Consequently what happens,
I was shocked when huge number of plots were put on resale in the overseas sector web site, reason is obvious.
Subsequently a schedule citing development charges of 600,000 PKRS. came into picture.
Development charges were scheduled to be paid in equally distributed quarterly installments of 50,000 PKRS each.
Therefore I started making payments for development installments and had paid 4 installments of 50,000 PKRs. each, making a total of 200,000 PRs, besides payment of US 500$ on top of installments.
More than 2 years later it was further communicated to me that development charges are enhanced from 600,000 PKRs to US$ 16,500 (making an increase of more than 100%) and that there is a new development charges schedule planned for the same.
Taking into account that I had already made above cited significant portion of development charges (200,000) in Pk.Rs. therefore such an overwhelming increase in development charges and also changing the currency to US$ in the middle stage and without proper justification appeared very disturbing and inadequate.
This painful life story does not finish here.
Besides above cited concerns and facts, following queries would always struck a person's mind who has experienced a real uncomfortable business partnership with DHAI.
1. 1 Kanal plot initially priced for around 4.4 million PKRS. in early Yr-2005.
2. Shortly afterward prices diminished to less than 2 million PKRS. (a reduction of
over 50% ).
3. Shows that well aware people got benifitted with this greatly reduced, gifted price.
4. Months later Development charges schedule of 600,000 PKRS. came into scene.
5. Soon after prices again enhanced to US$ 85,000 (an increment of over 150%)
6. Soon after Development schedule payments greatly enhanced to US$ 16,500 and
also currency changed from PKRS. to US$.
7. Shokingly web site became loaded with plots offered for resale.
8. Development was committed by DHAI management in 2-1/2 to 3 years time, However
as of today there is not a single road could be found.
This painful life story does not finish here.
These days one would be compelled to think,
* Amount of over 4 million PKRS. paid in May-2005 holds what value today
* 50% of the money were lost straight away when DHAI reduced the prices to
less than 2 million PKRS.
* Loss was further mounted when 600,000 PKRS. development schedule introduced.
* Loss was further mounted up when development charges enhanced to US$ 16,500
* Loss is keeping piled up since till date there is no significant development seen at site.
* Loss is further accumulating when recently announced projects were offered on much
cheaper rates and with no development charges scheduled for them.
* Loss is keeping accumulating, since DHAI already started developing projects
announced just recently.
Had this amount been invested in some other project or in overseas, it could have easily yielded good fruits, not only in terms of profit but also in fulfilling the commitment.
Let us accept that DHAI is in a professional business and its customers hold key importance in its current and future ventures. While across the globe organizations are equipped with highly skilled individuals when it comes to attracting customers for such kind of businesses or for that matter any kind of professional business.
Customers on the other hand also enjoy the partnership with such professional establishments as long as they hold customer care, quality and commitments on top priority. I am hopeful that DHAI is potentially such esteemed and professional entity.
Looking forward for an appropriate compensation on above excessively paid Land and Development charges and suitable allocation of the plot please.
Submitted for your kind consideration.
Sincerely,
CHAUDHRY ZULFIQAR ALI

Dr. Saleem replied on Thursday, March 11, 2010 09:59 PM PST 
Can any one from DHAI tell us about the status of Accounts Group Housing Scociety (AGOSH-II). Is it really merged with DHAI or any planning/ negotion is underway. Please tell me if you any information about it.
Dr. Saleem

SALMAN SAEED AWAN replied on Sunday, April 4, 2010 11:18 AM PST 
I have couple of plots that I have purchased in AGOSH 11 which has been merged into DHA ISLAMABAD but this has been almost 2years now and I am still on stand by to hear the latest update.
Can someone kindly give me an accurate information on the update regarding AGOSH 11 please
Best Regards

Farrukh replied on Thursday, May 13, 2010 12:11 AM PST 
Dear all,
I invested in DHA PH 2 Oversease sector with this trust that I am investing in project which is running by a professional organisation, my investment is secured & after 3 years as commetted I will be able to construct my dreamed home.
Unfortunatly after few months & personaly site visit I found that something is wrong . And same thing happened which I observed. I have no news about the development. I purchase 2 plot @ US$.85,000/-& already paid 76,000/- US$. With this amount I can purchase ready to transfer 2 plot in an other developed area.
DHA management as a good faith & considering their repute & name reduce the price according to the market situation , reschedule the instalment plan & give the actual completition time for handing over the plot. The policy only collecting of money from investor is not good .One day we all have to reply infront of Allah & we cannot save our skin with our claverness.
Other wise if this project is held for long time, should be refund the amount. Extra cost in shape of interest is already paid to the banks.
If there are any steps already taken by management pl. inform me.
Thanks

Shams replied on Wednesday, March 2, 2011 02:30 AM PST 
Dear All,
any news about Agosh II
Refards,

Muhammad Iqbal replied on Monday, March 14, 2011 05:12 PM PST 
I want to know the future prospects of DHA commercial avenue

Muhammad Iqbal replied on Monday, March 14, 2011 05:13 PM PST 
I want to know the future prospects of DHA Islamabad commercial avenue
(389)
Tuesday, January 5, 2010 09:19 PM PST 
Comments closed
(387)
Friday, January 1, 2010 07:13 PM PST 
Comments closed
DHA ISLAMABAD INVESTMENT

So far DHA ISLAMABAD has developed DHA PH-1, PH-2 AND EX- COMMONER'S TOWN area of 30 thousand kanal area from 1995 to 2010 in 15 years. which includes the boom period of property investment period also.
So you can imagine that DHA VALLEY, DHA PHASE-2 EXTENSION and DHA OVERSEAS BLOCK of 150 thosand kanal area will take how much time for development. while last two mentioned project are not started at all.
they are started only in ADDS given in newpapers and TV Channels only. and now people take less interest in property investment nowadays than 2005.

Zain replied on Sunday, January 3, 2010 03:09 AM PST 
Saleem Awan Pagal Hay

Visitor replied on Sunday, January 3, 2010 07:48 AM PST 
Saleem Awan Sahib thanks for your deep analysis and providing valueable information about DHAI. Please also share your knowledge about DHAI Phase I Ext ie its present status of developing and when it is going to be completed Thanks in advance

MM replied on Sunday, January 3, 2010 05:01 PM PST 
Mr. Saleem is right
Some month back I met a Dumper truck driver that belongs to Habib Rafiq Co. He told me that he is working in some DHA project and the work is just started and it will take 10 years (according to him) to complete the work due to slow pace of progress.

SALEEM AWAN replied on Tuesday, January 5, 2010 07:41 PM PST 
my reply to mr Visitor
Actualy ph-1 ext. Is satuated in rawalpindi not islamabad. Ph-1 ext. Is launched in 2005. It one kanal file starting price was 36 lak ruppes. Now it file price is 6 to 7 laks. So, you can imagine the property position. In 4 year the only interchange at entrance point of phase-1 main road is underconstruction. This interchange is not yet completed because dha has no more money to spend. The rest of project sectors are not started yet. It is far from completion. So, the plot rate is decreased from 36 laks to 6 laks.

Visitor replied on Tuesday, January 5, 2010 08:50 PM PST 
Saleem Awan Sahib thanks for the reply. May I ask what the DHAI management is planning for Ph-1 ext development contract. Is it awarded or planning to be awarded ? I am interested in it as I am one of the affectee of Ph-1 ext. I will be grateful if you put some more light on it. Thanks in advance

SALEEM AWAN replied on Monday, January 11, 2010 08:51 PM PST 
Mr Visitor!
check my post no. 45934 of 11 january about DHA Phase-1 extension.
I hope you will satisty.
(386)
Friday, January 1, 2010 12:11 AM PST 
Comments closed
DHA ISLAMABAD INVESTMENT

MY REPLY TO MM & AKHAR
DHA can collapse but not Bahria Town. Because Bahria town build smaller sector and portion and then launch it like abubakar block umar block and ali block in Saffari Valley phase-8. their prices are stable beacuase they have finished the work very rapidly. 60% of Bahria phase-8 (not saffary valley) is carpetted in 3 years. that area is about 25000 kanals. the remaining 15000 kanal in under development.
so their prices are stable.
now look at DHA. they anounced the DHA PH-2 EXT. DHA VALLEY AND DHA OVERSEAS, DHA PH-1 EXT. THIS AREA IS MORE THAN RAWALPINDI. AND THEY HAVE LESS MONEY TO BUILD IT. BECASUE PEOPLE DON'T BELEVIE THEN NOW.
MANY MEBMERS DON'T PAY THEM THE ADDITIONAL DEVEOPMENT CHARGES.
SO, THEY HAVE LAKE OF MONEY. OR THEY DON'T WANT TO START THE WORK. MAY BE TO GET INTEREST ON THEIR DEPOSITS.
ANY HOW AN AREA EQUAL TO RAWALPINDI AND MORE THAN 2 LAK PLOT ARE NOT EASY TO BUILT EVEN IF THEY USE THEIR WHOLE RESOURCES OF MONEY.
IT WILL TAKE MINIUM 10 YEARS FOR ONLY PHASE-2 EXT AND DHA-VALLY TO COMPLETE THE DEVELOPMENT.
NOW AS PER PROPERTY INVESTMENT POINT OF VIEW MORE THAN 2 LAK PLOT ARE AVAILABLE FOR SALE IN DHA ISLAMABAD DIFFENECE PHASES IN LOSS BUT THIER IS HARD TO FIND A BUYER FOR THESE PLOTS
REPLY FOR MR. GHULAM SARWAR
I AM SINCERE TO MY JOB AND MY WORK ASSIGNED TO ME.
BUT IT IT NOT IN MY JOB DESCRIPTION TO PROTECT THE DHA ISLAMABAD ILLIGLE WAY OF WORKING PROCEDURE OR THEIR POLICIES. BECAUSE THIS IS OPEN FORUM AND WE ARE FREE TO DISCUSS ANY PROPERTY SCHEME.
AND I AM A FREE PAKISTANI AND NOT AFRAID TO GIVE TRUE INFORMATION AND I WANT TO GIVE THE PEOPLE CORRECT INFORMATION SO THAT THEY CAN'T SUFFUR IN FINANCIAL LOSS.
HOW MANY PEOPLE GOT BENIFIT IN INVESTING THEIR MONEY IN DHA ISLAMABAD?
THE ANALYSIS I HAVE GIVEN IS A FACT LIKE SHINGING SUN IN THE DAY.
IF YOU PROVE ME WRONG THAN I WILL AGREE WITH YOU.
MY REPLY TO MR. ZAIN
I DID'T GET LOSS IN ANY DHA ISLAMABAD PROJECT. I HAVE NO PLOTS IN DHA ISLAMABAD PROJECT. BECAUSE I KNOW THE SATUATION. IF I WILL INVEST IN PROPERY I WILL PREFER CDA ISLAMABAD SECTORS D-12, G-15, E-16, E-17
WHICH IS NEAR TO COMPLETION.
NOW COME TO DHA ISLAMBAD ANALYISIS OF MR. ZAIN.
YOU SAID THAT FUTURE OF DHA ISLAMBABD PROJECT IS VERY BRIGHT.
FIRST LOOK AT THE TODAY PRICES OF THIS WEBSITE WHICH IS TRUE AND ACTUAL.
DHA Islamabad Phase 2 extension lowest price certificate file is available at 7.80 to 7.90 Lacs today while at start sector A~K file rate was 36 laks. sector L~R rate was 14 laks at start.
DHA Valley Islamabad open files 5 marla 5 paid sells at loss of = 61000 to 65000. open files 8 marla 5 paid sells at loss of = 84000 to 92000". DHA Valley file sale is also in loss. more you pay installment more loss will you get.
Now come to the progress of DHA Phase-2 ext. none of any Road of any sector is built after sale of their files in 2005. Now it is 2010 tomorow. only approach road that is EXPRESSWAY is in progress and it will take one and half month minimum because their are may bridges to be built. any other street of any sector is not built.
if you come to site of project and then show me any road which only earth work is started i will agree with you.
secondly now come to DHA Valley project.
One small pocket of land about 500 kanal area in progress from one year and still under development.
it does not means that they have started the work on whole area of valley which is more than 1 lak kanal.
So,you can imagine how much time it will take for completion. it will take minium 10 years. then DHA will say that pay for development charges due infulation.
AS PER MY INFORMATION ONLY DHA VALLEY MAP IS ISSUED TO MARKET. THE 50% OF LAND IS FULL OF PLOTS. WHILE LOOKING TO GROUND CONDITION ONLY 30% OF LAND IS ABLE TO DEVELOP THE PLOTS.
COMPLETION OF MAP DOES NOT MEAN THAT PROJECT IN COMPLETED. WHAT PEOPLE WILL DO WITH MAP IF THEIR PLOT IS NOT POSSESED OR HANDED OVER AT GROUND EVEN AFTER 10 YEARS.

Azad K replied on Friday, January 1, 2010 01:39 AM PST 
Hmmm Interesting. Aside from the investment potential of DHA or the lack of it, I guess if they are going to ending up building even 20% of the files within the next 10 years it will be good in addressing the housing shortage in the country, it will allow many people to own a property of their own, and it will keep prices in check over the next 10 years. Besides profit there is a social element to housing.

qasm replied on Friday, January 1, 2010 02:38 AM PST 
forger EVERYTHING and invest in G-15, E-16/17 - Fully developed and handed over to alloties. 100% profit even in war

Safwan Khan. replied on Friday, January 1, 2010 04:03 AM PST 
Interesting, you keep posting this (please limit your thoughts to one post only). May be you are a disgruntled employee who did get the piece of pie or may be you are sincere to all of us and breaking this news NOW.
We overseas need someone on ground or someone competent like CMY to provide thoughts/analysis on DHA Islamabad.
I personally own a plot in Commoners block (DHA II Ext), bought in 2006 and just paid another round of so called "development charges", although it was all paid off plot :)

akhtar replied on Friday, January 1, 2010 07:18 AM PST 
Brother Saleem,
Can you please sugest us how we (DHA Valley all members) can take safe exit from DHA islamabad?
If you do not have solution please do not disheart the our patriat nationals living abroad.

A.M.BUTT (Doha Qatar) replied on Friday, January 1, 2010 02:46 PM PST 
Mr saleem Awan,
Thank you for the information and analysig but my question is why people are not consedring my seggustion to joind hand and form a "Forum" ( Members DHAI Valley oveseas block) then jointly we can start a struggle in court and parliament commetee, because Dhai is bound to develop the valley in three years .let wait for three years and after that we can fight case in defferant forum. I hope and ready a to do this job but i need contact numbers and seggustion from the overseas friends. I am again inviting overseas friends to join the forum.I will appriciate if any one of you is willing to orginise the forum we all feiends here in Qatar will give full assistance and suport other wise i am ready to do any service regarding this.
Please contact me on ().

SALEEM AWAN replied on Friday, January 1, 2010 08:16 PM PST 
MY REPLY TO MR Safwan khan
I am not a disgruntled employee. i have a good position in DHA ISLAMABAD and i also got one plot in and sold it in 2 months and i invested in other place not in DHA islamabad. i did not got loss. but now same scheme plot holders are in loss now.
you have also plot in Ex-Commoners town. is is started in 2005 and still no possession uptill now. then why are you blamming me now.
Qasim is 100% right. one should invest in Islamabad new sectors for investment. CMY will also agree with me. You can check daily price update from CMY and read my analysis on rates of DHA Islamabad then u will understand.

SALEEM AWAN replied on Friday, January 1, 2010 08:20 PM PST 
MY REPLY TO MR. AKHTAR
if you want safe exit from dha valley or ph-2 ext. then sell your plot or file as soon as possible because in next 3 years there is no chance of increase in prices.
or if you want to hold your file or plot and want to build house then wait for 10 years atleast.

Visitor replied on Sunday, January 3, 2010 07:18 AM PST 
Saleem Awan Sahib thanks for your deep analysis and providing valuable information about DHAI. Please also comment on DHAI Phase I Ext, its present status and when it is scheduled to be completed etc. Thanks in advance

Safwan Khan. replied on Monday, January 4, 2010 04:52 PM PST 
Thanks Saleem Awan. I am not in Pakistan so can't provide on ground reality. You may be right or wrong, only time could tell. Alot of ppl have invested in DHA because of repo they built from projects in Lahore and Karachi and ppl hope that DHA Islamabad/Rawalpindi delivers on promises they made to common man.

SALEEM AWAN replied on Monday, January 11, 2010 08:54 PM PST 
Mr Visitor!
check my post no. 45934 of 11 january about DHA Phase-1 extension.
I hope you will satisty.
(385)
Wednesday, December 30, 2009 08:22 PM PST 
Comments closed
INVESTMENT IN DHA PHASE-1 ISLAMABAD

SOME DETAIL ABOUT INVESTMENT IN DHA PHASE-1 EXT. ISLAMABAD
ACTUALY PH-1 EXT. IS SATUATED IN RAWALPINDI NOT ISLAMABAD. PH-1 EXT. IS LAUNCHED IN 2005. IT ONE KANAL FILE STARTING PRICE WAS 36 LAK RUPPES. NOW IT FILE PRICE IS 6 TO 7 LAKS. SO, YOU CAN IMAGINE THE PROPERTY POSITION. IN 4 YEAR THE ONLY INTERCHANGE AT ENTRANCE POINT OF PHASE-1 MAIN ROAD. THIS INTERCHANGE IS NOT YET COMPLETED BECAUSE DHA HAS NO MORE MONEY TO SPEND. THE REST OF PROJECT SECTORS ARE NOT STARTED YET. SO, THE PLOT RATE IS DECREASED FROM 36 LAKS TO 6 LAKS. I WILL GIVE YOU THE SUGGESION THAT DON'T BUY ANY PLOT IN DHA ISLAMABAD EXCEPT DHA PHASE-2, DHA COMMONERS TOWN. THE DHA PHASE-1 EXT., PHASE-2 EXT. OVERSEAS BLOCK, DHA VALLEY ARE IN THE AIR. DHA COMMONER'S TOWN IS IN DEVELOPMENT AND WILL COMPLETED IN 18 MONTHS. DHA HOMES IN UNDER DEVELOPMENT AND WILL TAKE 3 YEARS.

Visitor replied on Thursday, December 31, 2009 05:27 AM PST 
Saleen Sahib, please through some light on development of DHA Phase I Ext. Is it started, if yes till when it will complete ? Thanks
(384)
Sunday, December 27, 2009 09:30 AM PST 
Comments closed
plot interest

Hi !!
I need urgent help.
I am planning to visit Pakistan in January and want to buy a plot urgently of 1K.
a: Which scheme is best for house construction within 5 years
Valencia
Fazai
Bahria
State life
Also if you know the price range of these societies
b: How long time (very important) will it take to get Qabza/papers clarified and/or plot registry. I have only 20 days of holidays and want to invest 40 Lacs and the whole process must finished within 10 -15 days.
Jazak allah

Azad K replied on Sunday, December 27, 2009 11:34 AM PST 
Yes it is possible to complete all the legal formalities within your stay. However you need to start looking at plots as soon as you land.
I think from your list Valencia would be the best choice as it is the most populated at the moment.

Assad replied on Sunday, December 27, 2009 07:21 PM PST 
AOA
Dear sir you can add DHA phase8 to your list, price is attractive.
If you want to live around Multan Road/Thokar, Bahria & SukhChayn Garden are Good, If you want to live around Cantt, DHA8 is the best. Valencia is good but too far...and price is quite high.
Regards
Assad

Sulman replied on Sunday, December 27, 2009 09:51 PM PST 
aa
DHA Phase 6 & 7 are in your budget also.

MM replied on Sunday, December 27, 2009 10:33 PM PST 
Dr. sb please consider AWT Phase 2 also as it is fully developed, possession offered and houses are under construction. No Qabza Group, housing scheme controlled by Pakistan Army.
Price of 10 Marlas around 10 lacs

Visitor replied on Sunday, December 27, 2009 11:34 PM PST 
Fazaia development is its final stages and planned to hand over possession in Feb 2010 gradually block wise. Kanal plot range is 20 - 22 lacs. Can be transfered immediately. Transfer procedure is transparent like DHA. The society is to be taken over by DHA in due course. Wish you best of luck

Major(R) Karim replied on Tuesday, December 29, 2009 01:04 AM PST 
Go for State Life Phase II. Current price of best located plot is maximum 14-15 lacs with all dues cleared. So No more to pay upon pocessesion. Whereas, DHA 9/10 would be having long awaited balloting then DHA administration will give you a plan for development charges. If U trust, and visit SL Phase I then you would believe that 1k plot is still possible with this meagre price within 5 years of time frame. Mind U these plots went upto 35 lacs of price in the past boom.
Regards
Major(R) Karim