(9) Y.Khan Sunday, March 19, 2006 12:30 AM PST Comments closed SUI GAS HOUSING SOCI PHASE 2 CMY Sb, Any news of SUI GAS 2 balloting? are they genuine? can anybody update me on this????? regards CMY replied on Sunday, March 19, 2006 12:42 AM PST Y.Khan sahib nothing new yet00Reply ▾Text ReplyAudio ReplyVideo UploadImage UploadAll Other Media 00Start a New Post
(8) Y.Khan Saturday, February 11, 2006 08:03 PM PST Comments closed AWAMI VILLAS I just spoke to one the reps of Bahria Town in Dubai, he informed me that Awami Villas are / will be made of "FIBRE GLASS" this is for info only. regards, Jawad Shahid replied on Sunday, February 12, 2006 01:33 AM PST The Awami Villas is being made from a special pre-fabricated material not the fibre glass. The internal walls are made of sandwitched panels of modular system with gyspum coating on both sides. For the external wall there is an extra layer of the cement plaster on the wire mesh, to give the added strength. I have visited the Awami Villas Model House myself, they have a special team there which explains the entire technology. For the ppl who cannot visit the model in pindi they are building one model house in Lahore on the main boulevard some where near the Main Market.00Reply ▾Text ReplyAudio ReplyVideo UploadImage UploadAll Other MediaNaveed Yaseen replied on Sunday, February 12, 2006 05:35 AM PST Several reasons make me believe that technology they are using in Awami Villa is similar to a method patented in United States called “Robust Building System” (which itself is extension of general method "prefabricated steel construction"). Some detail of this method of construction can be seen on page 2 to 4 of following URL http://web.dcp.ufl.edu/stroh/MiscSystems.pdf Now the reasons which makes me believe their technology is similar to "Robust Building System" are... 1) Strange flatness of exterior (as pointed out by someone earlier) 2) Apparently unnecessary middle seem in roof (but actually necessary for structural rigidity of roof) 3) Roof pitch (or slope) somewhat more aggressive than apparently needed for rain-water (again, it is actually needed for structural rigidity of roof) 4) Separation of exterior and interior walls 5) Exterior wall built around wire-mesh structure I may be wrong in this judgment and it may be totally different technology. If my judgment is not wrong, I would suggest BT management to improve Awami Villa design by making roof plain but double surfaced. I mean use all the materials and techniques same as before, just keep the width of roof at edges (and everywhere else) same as width at middle seam. That will maintain similar rigidity without requiring odd-looking middle seem or aggressive pitch. It may cost less too because of absence of middle seam and highly varied sizes of units used in aggressive pitch. Provided that thickness of this double surface roof is exposed in exterior and interior carefully (or not exposed if needed), it should look definitely better than current. And, in my personal opinion, monotony or flatness problem of exterior can also be improved within constraints of this technology and without adding too much cost. Just a self-evident example is front side of the model house (which is excellent) compared with other sides (which are not that beautiful). As for the description by Dubai representative it being made of fiberglass, it is possible that small powder like pieces of fiberglass may have been used in cement or gypsum as strength aid, but that should not be called ‘fiberglass’. Matter of fact, even the actual ‘fiberglass’ should not be called fiberglass. The more appropriate term is “fiberglass reinforced plastic” (emphasis, primary material plastic, secondary material fiberglass). Fiberglass is not a rigid material in pure form. It is just fiber (i.e. thread). Perhaps the only rigid structure we can make from pure fiberglass is,,, "geth" :)00Reply ▾Text ReplyAudio ReplyVideo UploadImage UploadAll Other Media 00Start a New Post
(7) Y.Khan Monday, January 9, 2006 12:02 AM PST Comments closed SUI GAS PH 2 Dear Mr.CMY or Anybody, Reminder, 4th update. Sui Gas Ph 2 Can anybody give me a feedback/comment/advise/update me on future of Sui Gas ph 2 society? and i hardly read any updates or discussions on this society. regards, YK CMY replied on Monday, January 9, 2006 05:40 PM PST Dear Y.Khan AOA, Sui Gas 2 is next AWT phase 2 and Sector C Bahria Town Lahore. It have approach from Sundar Raiwind Lahore. I was told they are working on boundary at this time. Some construction activity is also going on there. I have not visited the site yet but I will try my best to visit it ASAP. SUIGAS PHASE 2 RATES PH-II 1 Kanal (4 paid) 10 to 10.25 lacs 2 Kanal (4 paid) 17.5 to 18 lacs I consider this a safe investment. But development might take longer then 3-4 years. Sui Gas phase 1 is highly popular scheme. That phase is next to DHA and have great quality of construction work.00Reply ▾Text ReplyAudio ReplyVideo UploadImage UploadAll Other Media 00Start a New Post
(6) Y.Khan Sunday, January 8, 2006 01:02 AM PST Comments closed Dear Mr.CMY, Reminder 3 Sui Gas Ph 2 Can anybody give me a feedback/comment/advise/update me on future of Sui Gas ph 2 society? and i hardly read any updates or discussions on this society. regards, YK 00Start a New Post
(5) Y.Khan Saturday, January 7, 2006 05:02 AM PST Comments closed SUI GAS PH 2 Reminder 1 Sui Gas Ph 2 Dear Gentlemen, Can anybody give me a feedback/comment/advise/update me on future of Sui Gas ph 2 society? and i hardly read any updates or discussions on this society. regards, YK 00Start a New Post