Lahore Real Estate Forum

Thursday, November 26, 2026 09:11 AM
Total records318
Records per page10
Page views today17,369
Page views last hour1,714
(268)
Thursday, May 31, 2012 06:44 PM PST 
Comments closed

Dear Friends, :cl
Would you be kind enough to comment the impact of Margala Avenue on nearby Sectors like D-12 E-11 and E-12 ?
What will be the exact route of Margala Avenue ? Where it will join to the 11th Avenue and will the 11th Avenue be between sectors 11/12 or 10/11 :h
Thank you Emoticon :t:

ZA replied on Thursday, May 31, 2012 09:26 PM PST 
E-11, E-12 n D-12 are already very well located within Islamabad and Margala Avenue connecting Islamabad to GT road will not have any considerable impact on these sectors.
Rather all the societies located near the point of intersection at GT road (somewhere between C-17 and B-17) will have a very strong positive impact because of a straight, direct, short and fast connectivity with Islamabad.

Arif replied on Thursday, May 31, 2012 09:55 PM PST 
It will have tremendous positive impact on Sector D-12 and other adjoining Sectors as the peoples of KP Province, Wah, Taxila and Haripur as well as Norther Areas and Kashmir will be linked to Islamabad more closely in terms of distance and time.
The coummuters from that side will save atleast 30 minutes and 25 KMs to reach in heart of Islamabad.
Therefore rich and famous from that region would prefer to buy in D-12 more than any other sector in Islamabad as D-12 will be at the equal distance from all important places in Islamabad.
Also remember E-7 is most expensive Sector in developed area and D-12 has similar location as well.
The prices will shoot up once the road work starts.

javid replied on Thursday, May 31, 2012 10:47 PM PST 
starting point of Margala Avenue is understandable but at what point it will end up and linked with 11th Avenue is the question
what is the exact location of 11th Avenue ?

Waseem Malik replied on Friday, June 1, 2012 01:12 AM PST 
I think the purpose of Margalla Avenue is to facilitate people of Islamabad and connect them with newly developed sectors in the west, and NOT to bring in herds of people from all over the North. We also have future GHQ next to e-11 and government can’t afford making this road as highly demanding and high traffic road.

MAS replied on Friday, June 1, 2012 04:22 AM PST 
Javid 7th avenue runs in-between 6th and 7th sectors LIKEWISE 11th avenue will run in-between 10th and 11th sectors. Here is part of my reply in post number 59051 which I am copy pasting for your convenience:
"MAS replied on Monday, May 28, 2012 01:31 PM PST
A major highway cannot be made to merge into D-12's service road. This is not how Islamabad is designed. Islamabad's master plan has left plenty of space in-between sectors for highways (like 7th and 9th avenues run in-between sectors). Logically Margalla avenue should run parallel to the north service road of D-12 (a good distance apart from it), just before D-11 it should turn south and run in-between D-12 and D-11 until it reaches the point where the corner's of E-11 and D-12 meet. This is where it should turn east and run in-between E-11 and D-11 parallel to the northern strip. Just before E-10 it should turn south and become 11th Avenue.
Above is my guess but here is a clue: Take a look at CDA's pre-qualification notice for 11th avenue. It says "from Kashmir Highway to Margalla Avenue" it does not say "from Kashmir Highway to E-11 service road". The only way 11th avenue can touch Margalla avenue is how I have described above."

LRE Hot Topics replied on Friday, June 1, 2012 09:08 PM PST 
Post added to useful posts list. View MORE Useful Posts Click on >>> LRE Hot Topics
(267)
Thursday, May 24, 2012 11:25 AM PST 
Comments closed
property value

Dear friends,
I have a plot(307) of 10 Marla in Bahria town sector C block Jasmine, Can any body tell me what is its correct value.
Arif
(266)
Sunday, April 29, 2012 09:47 AM PST 
Comments closed
(265)
Thursday, April 19, 2012 09:42 PM PST 
Comments closed
(263)
Friday, February 24, 2012 08:43 PM PST 
Comments closed
(262)
Sunday, December 4, 2011 01:55 AM PST 
Comments closed
(261)
Wednesday, November 9, 2011 08:47 PM PST 
Comments closed
(260)
Tuesday, October 25, 2011 05:44 AM PST 
Comments closed

Dear brothers,AOA
What is the best appropriate season/period to build house in Lahore?
Regards,

Khan replied on Tuesday, October 25, 2011 08:33 AM PST 
Whenever you have the money, resources and time.

aman karim replied on Tuesday, October 25, 2011 09:57 AM PST 
@Khan, thank u very much Khan sahib, i m living abroad, have no such experience or knowledge, some one told that it is not advisable in rainy season and finally i want to plan my vacation accordingly, this is why i asked help, advice from the forum ppl. Regards

Kamran replied on Tuesday, October 25, 2011 11:19 AM PST 
Around Eid nothing much gets done because laborers leave for their villages. Other than that I do not know if there is a particular construction season in Lahore. Winters are still mild and work gets done. Similarly in Ramadan workers still work. Possible concern is the harvest season, when once again the laborers head to their villages to work the fields. Other than this, your finance pretty much controls the work.

AG replied on Tuesday, October 25, 2011 03:33 PM PST 
The construction should be planned & started at a time that the structure is completed when the Summer has already set in & there is no fog. During the construction of my house in Bahria Town Lahore we had to wait at least two months to let the interior of house dry which was wet due to fog before starting plaster works.
Other things like Eid, Ramadan, Harvesting etc do, at least once, come during the construction period. So we have to live withem.
Regards.

zaheer replied on Tuesday, October 25, 2011 09:36 PM PST 
respectable AG sab
i intend to build my house.you build ur house.i want to talk complete information regarding house construction from you.please give me your any contact number.i will be thankful to you.

Khan replied on Tuesday, October 25, 2011 10:38 PM PST 
The construction of house has a time span, no matter when you start, all of these situations will crop up. The major problem is to tie up materials. Bricks and sand get expensive in rainy season. Cement & Steel prices are not dependent on weather or season.The hardest part which should be be your top problem: Get a good contractor, has good payment stages related to the level of construction and the most to have a good supervision and financial control.Relatives, if trusted with money are usually problematic, unless it is your father/wife.Be very closely involved in payments and expenses.Things get very much out of hand .Buy/settle the rates of most of the items.
And finally don't get stressed. House construction is a stressful job.
God bless you and good luck.

aman karim replied on Wednesday, October 26, 2011 05:47 AM PST 
Thanks a lot Mr. Khan, Mr.AG & MR. Kamran, this is exactly what i wanted to know.

AG replied on Wednesday, October 26, 2011 11:02 AM PST 
@Zaheer.
Pl. leave your email address. I will send the information.
Regards.

zaheer replied on Wednesday, October 26, 2011 10:11 PM PST 
my email is

Taimoor replied on Wednesday, October 26, 2011 11:27 PM PST 
AG,
Kindly send me that information aswell at . I am planning to start my house in Bahria town Lhr.
Also Did you hire external architect or used Bahria's design department for drawing map of house? What do you suggest about BT's design dept.?
Thanks

Owais replied on Thursday, October 27, 2011 01:02 AM PST 
Dear AG and other brothers,
AOA
I am getting frustrated due to leakages from water pipe lines which is badly spoiling room walls.
What the best can be done now and precautions for future as my kids are building another house?
Kind Regards

Khan replied on Thursday, October 27, 2011 01:19 AM PST 
Mr.Owais: Apparently you had more than one plumbing contractor.If it was one it was a bad selection. There is no simple solution. You will have to dig the water or drainage pipes to find the leakage and repair them. For future construction as you lay the pipes and before you bury them in plaster or earth, leakage should be checked under pressure.
Thats all Iknow about water leakages

Amar - Kuwait replied on Thursday, October 27, 2011 06:46 AM PST 
Dear AG,
I am planning to start my 10 Marla house construction soon after Eid holidays in BT Lahore Overseas A. I have already finished the house drawings, passed it from BT office, applied and paid for utility connections as well. All this work is done by a friend who is also in this business of construction. Would appreciate if you share your experience with me at my email. I am presently living in Kuwait.
My email is: ar_abdulmannan at hotmail dot com

arif replied on Thursday, October 27, 2011 08:37 AM PST 
Dear AG,
Could you pls send the same info at my below address. i need to construct on my 10 marla plot. Regards

SI replied on Thursday, October 27, 2011 09:06 AM PST 
Respected AG
I am planning to start construction in Bahria-4, rawalpindi. please share your experience by sending details saeediqbal787athotmail.com. Did you hire external architect or used Bahria's design department for drawing map of house?
Jazzak Allah

AG replied on Thursday, October 27, 2011 12:31 PM PST 
Dear Owais
It may sound funny but, in my opinion, if the leakage is at numerous places & frequent Discard the existing concealed water piping & replace it with surface piping because repeated leakage is not only a nuicense but allso very dangerous for the structure of the house. In some places it may go un noticed which is very dangerous. These days beautiful surface piping systems are available. In the long run this will prove to be cheaper than rectifying the existing concealed piping system again & again. It will also eliminate the dampness in your house & the need to paint your house frequently.
However pl. note I am not a Civil/Structure Engineer & hope some experts will spare their precious time to advise.
Regards.

Owais replied on Thursday, October 27, 2011 05:36 PM PST 
Dear AG and Khan Sahib,
Many thanks for your kind advice.
Kind Regards

Rida Imran replied on Thursday, November 24, 2011 10:01 AM PST 
I intend to start construction of house please guide me
(259)
Saturday, August 13, 2011 11:25 PM PST 
Comments closed
Plot for sale (10 Marla Best location in Lahore)

I want to sale my 10 Marla plot in PAEC Housing scheme lahore located on main lahore cannal wall to wall bahria sector C, Suck chain garden and Bahruia oversease.
All dues cleared. (90%Developed) possesion is expected in few months.
Plot # C-255 Block -C
Contact
HTML code is disabled   Previous Page   Next Page