Lahore Real Estate Forum

Saturday, November 28, 2026 02:37 AM
Total records341
Records per page10
Page views today109,389
Page views last hour2,103
(261)
Sunday, May 29, 2011 05:34 AM PST 
Comments closed
(260)
Wednesday, May 18, 2011 04:15 AM PST 
Comments closed
(259)
Monday, May 16, 2011 02:51 AM PST 
Comments closed
Cooling Down Roof in summer

In summers roof of my house always gets very hot and makes almost impossible to sit in the upper lounge without 1.5 ton unit running at 24°C or below. I wanted to find a solution to cool down the roof. Lately I saw an ad of ICI weather shield stating it can bring the temperature 5°C. So I thought to do an experiment on the roof. To my amazement the end result was amazing and actually today I am sitting comfortably in my upper storey lounge without AC while temperatures are : inside : 33.7°C Temperature outside: is 41.7°C (in shadow) & 43.5°C (in sunlight). (14th May 2011) Difference: 7°C to 10°C However, before the application, I did a recording of temperature, (probably 10 days) Inside Lounge: 33°C Outside: 38°C Difference: 5°C How I did this ? The roof of my house is brick layered. I inspected and found it had lots of grime & dust. The only way I found was to remove it using metal wire brush. Here it is what the roof looked like:

http://i72.photobucket.com/albums/i182/vazim/home/IMG_1943.jpg

http://i72.photobucket.com/albums/i182/vazim/home/IMG_1944.jpg

http://i72.photobucket.com/albums/i182/vazim/home/IMG_1945.jpg

So I had to hire laborers to get the roof cleaned with use of water & metal brushes. The result I wanted was red bricks should be visible. This is what it looked after the cleaning.

http://i72.photobucket.com/albums/i182/vazim/home/IMG_1947.jpg

http://i72.photobucket.com/albums/i182/vazim/home/IMG_1948.jpg

The next stages I did were 1 coat of ICI primer and 2 coats of ICI weather shield (5°C cooler - slightly expensive than normal ICI weather shield). The area I covered with this is approximate 750 sqft. In total 2 gallons of ICI primer & 2 gallons of ICI weather shield (5°C cooler) used. ICI primer 1 gallon mixed with 1.5 liter of kerosene oil. 1 gallon could only cover half of 350 sqft. Weather shield was mixed with water 1-1 ratio or may be a little less water. 1 gallon used for 1st coat to cover 750 sqft (approx) 2nd gallon used for second coat. http://i72.photobucket.com/albums/i182/vazim/home/IMG_1951.jpg After the application, next day afternoon I checked the white surface with hand and a part of bare surface ( small area where I didn’t needed to apply the coat). The difference was huge to my amazement. I could keep my hand on the white surface as long as I can, but on the bare surface not more than 3-4 seconds. I do not have a surface temperature meter, but used this digital thermometer. Remember it cannot go above 108°F and below 97.4°F. You can see at the bare surface thermometer rises to its limits and at the white surface it comes down to its lower limit. The difference is very easily noticeable with one hand at bare surface and one at the white surface.

http://i72.photobucket.com/albums/i182/vazim/home/IMG_1956.jpg

http://i72.photobucket.com/albums/i182/vazim/home/IMG_1957.jpg

http://i72.photobucket.com/albums/i182/vazim/home/IMG_1958.jpg

inside : 33.7°C Temperature outside: is 41.7°C (in shadow) & 43.5°C (in sunlight). (14th May 2011) Difference: 7°C to 10°C

Inside
http://i72.photobucket.com/albums/i182/vazim/home/IMG_1960.jpg
temperature in Shadow
http://i72.photobucket.com/albums/i182/vazim/home/IMG_1963.jpg
in Sunlight:
http://i72.photobucket.com/albums/i182/vazim/home/IMG_1965.jpg

The trick of weather shield could be white color and material itself as well. I chose white color to get the maximum result, as it reflects sunlight efficiently. Benefits: Inner surface (Ceiling) is now cool. Inner walls are also cool. Since the roof temperature is not climbing, it is not transferring heat to inner surface (ceiling) and ultimately to inner walls. Hence in the evening, it is now wonderful and I run ac at 28°C-30°C with no one complaining of being hot or whatever :). Before that heat used to transfer to walls, hence making the whole environment hot and impossible to sit without 1.5 ton AC running at 24°C and below even in the evening & night time. Since Lahore has a very dusty environment, I might have to keep the roof clean every 2-3 weeks. Infact it drizzled yesterday (13th May) and dust stuck to surface, so I used water to get it cleaned. Also smoother the surface, better will be the result. This could be solution to thermal insulation although not long term. I might have to re-coat the roof next summer, but i am sure next time a single coat will do as weather shield itself should be durable. Hope it will be beneficial to some of visitors here. [This forum doesn't show pictures(you might have to copy & paste links in your browser. I have posted it another forum, if anyone needs the link, drop your email and i will send link.]

Jameel replied on Monday, May 16, 2011 03:52 AM PST 
You are right all white surfaces reflect Light and hence are colder,
would you share what is cost of one gallon paint,
meanwhile can someone elase tell that what do you Mix in white cement to make white wash

Hussain Kaisrani replied on Monday, May 16, 2011 08:21 AM PST 
Thank you very much dear Muhammad Waseem. It is very much beneficial for me. Next summer I will also do the experiment.

dd replied on Monday, May 16, 2011 07:17 PM PST 
Naveed Yaseen replied on Saturday, May 7, 2011 02:08 PM PST
I have conviction that most of our buildings would not need air conditioning or heating if we properly manage....
sunlight
earth's thermal mass
insulation
ventilation
This summer I have done following things....
1) Spread on roof a quarter inch of pure white marble chips (smaller 'number 9' usually used for walls). It costed like Rs 4 to 5 per square foot of roof.
This works due to chips' white color and loose thermal connection with roof. I had also experimented with some cheaper yellowish and greyish shades of chips, but found pure white grades are feasible even when expensive. Yellowish shades were a bit worse and greyish shades were quite worse (but still better than nothing).
Although it didn't flow a grain in recent medium rains, but to be careful I arranged steel strainer at drains. And made a wide backup hole a bit high in case when strainer clogs.
I plan to collect these chips into side-heaps during winter and monsoon and then re-spread next summer.
2) Painted all sun facing walls with white cement slurry. Cost was negligible, perhaps only a few paisa per square foot of wall.
3) Placed light colored sun-shade in yard. Cost was like Rs 8 per square foot of air-breathing plastic sheet, bought new from Landa Bazar Lahore. I plan to have this shade only during summer months.
4) Removed carpets to improve thermal connection with earth. Cost is wasted carpets.
The results are good. The house is not 'cool' yet, but considerably less hot than it used to be.
The next step I am considering is to utilize groundwater's coldness (and warmth in winter) to improve it further.
If the groundwater alone doesn't bring temperature down enough then I would thermally connect air-conditioner's condenser with groundwater to improve efficiency (and perhaps cost by using smaller tube as condenser).
To save on groundwater pumping energy costs I would probably be using an inverted U topology of pipes with both open ends inside groundwater, which would allow smaller pump due to siphon principle.

ali11 replied on Monday, May 16, 2011 08:05 PM PST 
@ Kaisrani,
welcome.
@Jameel,
Total cost was Rs. 7000/- for 750 sqft approx.
ICI primer is for Rs. 1020 and weather shield is for Rs. 1355
2 gallons of each used.
others = 650
cleaning by labor = Rs. 1500/-
paint by myself
Muhammed Waseem

Naveed Yaseen replied on Monday, May 16, 2011 10:24 PM PST 
I think ICI's '5 degree cooler' claim for white, although true, is a marketing gimmick. Most white surfaces would do almost equally good.
However in colors other than white there does exist a genuine technology called 'Cool Colors', where some pigments have better infrared reflectivity while maintaining similar shade to eyes. Such 'cool colors' are now required by law in California and some other US states.
Some inexpensive iron-oxide pigments used by our traditional painters, like 'Sienna' and 'Phal' pigments, have been categorized as 'cool colors' by California because they have good infrared reflectivity. But do know that white is almost always cooler than shade colors, no matter how 'cool' the colors are.
Following up on white marble chips performance on roof, it is still going satisfactory. In fact, after initial abrupt change in temperature, now day by day we are feeling house even further comfortable, in contrast to summer which is heading towards peak. That is probably because earth's coldness is now slowly taking over sun's heat on building structure.
But experienced a couple of problems which were not anticipated before.
1) A cat has chosen a hidden corner for excretions. Trying to get some cat repellent for that corner. Or otherwise I would put a night light on the roof.
2) We cannot broom the roof anymore. However I think we should be ok because as of now macro-dirt (like leaves, paper, polythene bags etc) are manageable by hand with a 5 minutes pass once a couple of weeks. And the dust is getting cleaned by rains. In recent rains it 'auto-cleaned' itself pretty well.
Also felt an unexpected benefit which was not anticipated before. That is better security in night. Any activity in white background is now very visible to neighborhood, even when power is out.

Naveed Yaseen replied on Monday, May 16, 2011 10:51 PM PST 
Referring brother Jameel's question...
> meanwhile can someone else tell that what do you Mix in white cement to make white wash
Many sources recommend 50-70% cement and rest hydrated lime mixed in 4 times water (by volume). However I was not too sure about it's durability. I had plain grey cement plastered walls and wanted to avoid vicious cycle of painting them again and again. So I just got it painted with plain white cement (Maple Leaf) mixed in around 2 times water. Watered the walls very well before painting, and did it in evening.
Faced a couple of unexpected issues. In initial days, it was leaving white powder on things rubbed against it. But after the rains it is not doing that anymore. However that came at a cost, with rains the opaqueness has decreased a bit. When it is wet, it is not opaque at all. But when it is dry it is reasonably opaque, though not up to my liking. I guess a second coat may improve it.

Habib replied on Monday, May 16, 2011 11:24 PM PST 
Naveed I would Like to ask you how these Chips behave in heavy rain Like was there any problem of being stuck to drains.
Anyone aware of Aluminum Foil a bit thicker than usually used on paper wrapping , Has anyone trid it on the top of shades ? How does it react

KAR replied on Monday, May 16, 2011 11:47 PM PST 
@ Naveed Yassin,
What is the underground water temperature in Lahore during summers? I guess your idea about the chilled water should work provided you have a good chiller mechanism to convert the water temperature into air.Try that and share your results..

Naveed Yaseen replied on Monday, May 16, 2011 11:58 PM PST 

ali11 replied on Tuesday, May 17, 2011 12:12 AM PST 
@Naveed Yaseen,
Have these stones caused any dampness ? I have a pretty bad experience in my old house. There was a pile of stone although at the corner, but in rainy season it never went dry underneath and cause pretty good damage to roof in respect to dampness.
Also can you check if the ceiling remain cool during day ? Since last 5 days, after application, the ceiling of my house is cool, even yesterday & today when termperature is around 43-44C.
Offcourse white surface perform better than any other color. However,
yellow color is also good reflector, grey & other darker colors absorb sunlight.
For cheap solution, any white material can be used. The main question is durability. IMO whitewash & paint are not weather worthy.
I think ICI weather shield (5 C cooler) is available in various colors and not just white. This one is more expensive than normal weather shield so ICI may have used some pigments etc. Why i am saying this is that exterior walls of my house are graphic layered in light brown color. I used some leftover weather shield to paint a small part of the wall in terrace to see the effect. The result is amazing, even in sunlight one can feel the warmth difference by hand and painted surface also cool down quickly than non-painted. My next plan is to use paint on the exterior wall with another lighter color.

ali11 replied on Tuesday, May 17, 2011 12:43 AM PST 
Found this useful link:
http://karachi.metblogs.com/2009/06/07/beating-the-heat/

Naveed Yaseen replied on Tuesday, May 17, 2011 12:51 AM PST 
Ali, the dampness issue hasn't showed up yet in couple of spells of rains in last 3 weeks. Perhaps because the quarter inch layer is not that thick.
They do absorb some water. I remember like 6-8 hours after rain the chips were somewhat dry, and in like 24-48 hours they were dry like normal. However it is dry and hot season, we would know better in monsoon.
The roof is certainly lot cooler (a better word is 'less hot'). I remember by the touches before and after.
An interesting incident, a couple of days ago I was in a small store room with direct roof on it, I didn't have the whitened roof in my mind and I was expecting the usual scorching heat in it, but it was not hot at all. So I instinctively thought "Nice! it is cloudy out today". But then when I came outside expecting cloudy, only to find out scorching full noon without any trace of cloud, then I realized it was due to the roof work :)

ali11 replied on Tuesday, May 17, 2011 01:24 AM PST 
@Naveed Yasin,
That's good. Can you please take a picture and post the link in this thread. It will be beneficial to many i guess.
Also please add this to hot topics.

Iqbal replied on Tuesday, May 17, 2011 03:34 AM PST 
How about insatlling the Jumbo Dimond Foam on roof. Is it work good for minimizing the temprature. Has any one insatlled and what is the result?

LRE Hot Topics replied on Tuesday, May 17, 2011 03:55 AM PST 
Post added to useful posts list. View MORE Useful Posts Click on >>> LRE Hot Topics

Patriot Systems replied on Monday, December 26, 2011 04:20 AM PST 
There are various industrial strength solutions available which are far better then weather shield.
Additionally a major portion of the heat entering a building or home is through its windows.
The use of a Solar Control Window Film is the ideal and most cost effective solution. Newer ceramic films offer unto 99% IR Heat Reduction.
www.patriot.com.pk
(258)
Saturday, May 14, 2011 07:15 AM PST 
Comments closed

Slaam, Ch. Sahib my special prayers for u and ur all team workers. and users
plz tell that what exact location of eden garden extension. also show on interactive map
regards
Adnan
Madinah Shareef

adnan replied on Saturday, May 14, 2011 07:17 AM PST 
plz also tell, what scope in future
thanks

ali11 replied on Saturday, May 14, 2011 08:01 AM PST 
@adnan,
Here's the map and you can select it from the locations on left side.
http://www.lahorepakistan.net/
Eden garden extension / eden garden /eden lands are same location projects. Earlier projects Eden garden / Eden lands are already delayed and construction pace is at snails pace. Location is good but if no development is going on then what to do with location ?

adnan replied on Saturday, May 14, 2011 11:42 PM PST 
thanks @ali11

Eden effecty replied on Saturday, May 14, 2011 11:52 PM PST 
Adnan,
Please dont make a mistake to book the plot with eden housing even if you have spare money. Prior to make decision check their already many delayed projects

ali11 replied on Sunday, May 15, 2011 09:10 AM PST 
@ Eden effecty,
I have invested in Eden as well. The one thing that keeps people interested in investing in Eden is easy installments. Although i hate that delay myself as well but this delay factor is every where, whether it is DHA lahore, or DHA islamabad or Bahria or numerous other socities.

LRE Hot Topics replied on Sunday, May 15, 2011 09:01 PM PST 
Post added to useful posts list. View MORE Useful Posts Click on >>> LRE Hot Topics

wajid ali replied on Monday, May 16, 2011 06:08 AM PST 
eden gardens is on an excellent location, beautiful wide roads covered with green belts.interchange is under constructions nearby eden gardens, and if metro underground stops confirmed then it will be far far from dream to have a house in a colony like eden gardens.i m not a broker but an ordinary pakistani,i visited this site on my visit to pakistan and have no doubt proud to be live in eden gardens. i understand the project is delayed but definately we get some benefits of it. now and later on.

ali11 replied on Monday, May 16, 2011 09:20 PM PST 
No real construction activity at Eden Gardens. For last six months no real development, accept a tiny bit development on water tank.
It is better not to buy in Eden extension, as you might have to wait for another 5 years!!!!! If anyone is too much tempted, perhaps eden lands is better options as almost 2.5 years passed since its launching.
(257)
Friday, May 13, 2011 03:10 AM PST 
Comments closed
dha phase 7

hi sir how r u sir kya phase 7 ko is year k end pe possession miljyga ya after eid mera dha m ak plot ha dha phase 7 block t plot no 128 kya ap mjhe iskii current value bata sakty ha m iskoo sale krna chahta ho .
last year apki website pe tha k 2010 december pe phase 7 ko possession miljyga humay exact date dha q nai batata

ali11 replied on Friday, May 13, 2011 08:22 AM PST 
here is official DHA Lahore website.
www.dhalahore.org
Please call them, they should answer your question.
(256)
Thursday, May 12, 2011 06:29 AM PST 
Comments closed
Eden Gardens Extension Analysis

AOA.
What real estate market says about Eden housing , there level of commitment,quality, sincerity ??
What are the good and bad points regarding this new scheme Eden Gardens Extension.
I am a hard earned employ and never wants to get in trouble by fixing my money.
How do u see it as an investment ??
and if someone has to build a house over it after the possession.?? is it a good place to live with all facilities what eden gardens has been saying to deliver, if they deliver ??
what is the future of this land or society?
i will appreciate ur concerns and suggestions thanking you in advance...

shahid khan replied on Thursday, May 12, 2011 06:42 AM PST 
no doubt it is one of the best location i have ever seen. committed approach, main ferozepure road, beautiful road, with green belts, near to interchange, and chances of metro stop at maggo matti.prices r reasonable at present, but if interchange built and metro starts in operation then it will be far from facts to buy houses in eden gardens. eden is a relible company apart of its delay problems. but keeping in view its location, price and facilites in near future the delay factor is not so discussable.

Ahsan replied on Thursday, May 12, 2011 06:46 AM PST 
What is payment plan?

HASSAAN replied on Thursday, May 12, 2011 06:52 AM PST 
A worthy reply, thank u so much bro..

An eden effecty replied on Thursday, May 12, 2011 09:10 PM PST 
Hassan,
Before investing with eden keep in mind that you will not get refund if you want. you will get the plot in 7years instead of 3.5 year. this is the eden reputation now a days.

Sajjad replied on Thursday, May 12, 2011 10:22 PM PST 
I am surprized to see reply from Mr Shahid Khan. Is the delay factor not so dicussable?. I got booked a small houses in Eden Gardens, for my living. The houses were suppsoed to be delivered in 2 years. It is more than two and half years now, but the construction progress is hardly 40%. I am afraid this society will take more than two years more. Eden is not completing their ongoing societies, instead they launch a new society every other day.

LRE Hot Topics replied on Thursday, May 12, 2011 11:59 PM PST 
Post added to useful posts list. View MORE Useful Posts Click on >>> LRE Hot Topics

listen my voice replied on Friday, May 13, 2011 12:34 AM PST 
i do agree with mr shahid khan remarks what he stated in his comments. in facts we people r very impatient and wish to achieve goals according to our wish and desire.edengarden project i think is a landmark of lahore in future. because of its approach, interchange, metro suggested stop. and if ganda singh border open with india for trade then i believe it would be a dream to have an house in eden gardens,

HASSAAN replied on Friday, May 13, 2011 09:03 AM PST 
well guys all of u are ryt at ur footings...
i have visited the site today and i was really surprised and upset to c eden gardens commitment level on ground....now wat happened lets read,
when i met with the marketing represented wearing a kool neck tie sat in kool air conditioned hall....lol it looked all drama frankly (having no substance) i asked him to show layout plan or master plan he said we dont have anything to show....we would show after balloting ....
than when i said about ur LDA approval of land size he said its all most 3000 to 4000 kanal ( he wasnt sure of the real size) as he was sitting to market his product (a fool)..
than he told me that there are two things to book 1) 5 marla plot for 550000 and 2) 5 marla plot for 450000x5=2250000 without development charges.........i was astonished with the later price range...he told me it was for those plots who come just after the eden garden and it is phase 1.....
and the plots which were 550000 (5 marla) are in phase 2
well development charges are 35000/marla and will have to pay after 6 months
well guys the site conditions are very embarrassing....the project which was started 2.5 years back and was committed to deliver in 2.5 years but on ground there is 15-20% progress see the way they deliver ( much embarracing and was a real point to get apart with this new eden garden extension) no link road uptill now even in eden garden and hardly m long boulevard ....in completed houses (trees and plants has been grown up in the in completed houses)...
now tell me after watching all of it on site who wants to fix his hard earned money in such scheme please tell me what should be the best idea ...?

ahmed shahaab replied on Friday, May 13, 2011 10:34 AM PST 
i think u r talking about eden extension but the discussion is focused on eden gardens which is under constructions.and might be handed over this year.

HASSAAN replied on Friday, May 13, 2011 10:02 PM PST 
@ ahmed shahaab..
dear see the title which is focused on eden garden extension..not just eden garden.....and keep this in ur mind without discussing the eden garden status we cannot rush towards eden garden extension...
i was saying in the last post..that they have done nothing in 2.5 years....so now how could they make u believe of there performance for the extension ......
so on ground status of there incomplete houses with no link road..and even if u visit u may not find the any construction machinery or the work force...it seems like they have stopped working...well having said all this it seems its hard to convince someone to fix his money on the extension business...

LRE Hot Topics replied on Sunday, May 15, 2011 09:17 PM PST 
Post added to useful posts list. View MORE Useful Posts Click on >>> LRE Hot Topics

ahmed shahaab replied on Monday, May 16, 2011 02:36 AM PST 
dear mr hassan
i think u r going on a wrong way or definately making a mistake, i lives in london, and having full information that structure of houses has been fully completed, and finishing is on its way soon. u should be aware that roads and others works starts after the completation of house, they need machinery for driange and digging purposes so no need of machinery for finishing purposes. pls dont compare eden exten with eden gardens. eden gardens is far best and suitable for those having low budget. i visited pakistan in november and visited this colony.in my view and to the best of my observation this is of course a land mark of future lahore, if ganda singh border open and metro starts to opertate from here, just imagine, what dha did peoples bought files of phase 9/10 at the rate of 45/47 lakhs and now no one is interested to buy them even in 15 lakhs. what bahria did . at least it nothing with eden apart of its delay problems. make sure no one can offer u a house 2875000/- of 4.6 marla with all amenities and facilites. and even u cannot buy a 4.6 marla plot in dha with this rate. i think the above is clear but if u still in the middle of mixing up then i cannot resovle ur inner intention.

ali11 replied on Monday, May 16, 2011 06:18 AM PST 
No real construction activity at Eden Gardens. For last six months no real development, accept a tiny bit development on water tank.
It is better not to buy in Eden extension, as you might have to wait for another 5 years!!!!! If anyone is too much tempted, perhaps eden lands is better options as almost 2.5 years passed since its launching.
(255)
Sunday, May 8, 2011 02:23 AM PST 
Comments closed
DHA phase V and VI connectivity

I read sometime ago that there will be underpass between dha phase 5 and phase 6 crossing bedian road but in the new DHA-6 map there is no sign of an underpass .

ali11 replied on Sunday, May 8, 2011 07:27 AM PST 
Never heard of it, could be some agents' hoax. Phase-5 is clearly blocked by Askari to access Ring Road & other side by state life. So to go to the other side of the ring road, Ring Road service lane will be used to approach interchange at Bedian or at Sui Gas. Probably same scenario as DHA 8/Parkview.

DHA replied on Sunday, May 8, 2011 09:06 AM PST 
ali11..if you haven't heard of something, doesn't mean it aint there...There is an underpass being constructed under the ring road which will connect phase 6 and 5 and these days you can even drive on it while its under development. And askari is not between phase 5 and ring road; it's on the other side of ring road.

ali11 replied on Sunday, May 8, 2011 11:19 PM PST 
i read in haste and thought that question was related was for phase 5-ext & phase 5 connectivity.

Khalid replied on Monday, May 9, 2011 02:32 AM PST 
I will try to rephrase. The underpass below ring road is a separate thing. But if a person wants to go from phase 5 to phase 6 and vice versa then he always has to cross bedian road which is not very pleasant. Does DHA have a plan to make an underpass below Bedian road?

CMY replied on Tuesday, May 10, 2011 08:20 AM PST 
75% work for digging of underpass was done at start of project than all of sudden plan was changed to go for round about instead of underpass. Underpass was much better option sooner or later they have to make an underpass here.
Ch Mujahid Yasin ( CMY )
03224009967

prospective buyer replied on Tuesday, May 10, 2011 07:10 PM PST 
Thanks CMY for reply. the main reason why many people including me were reluctant to buy plot in phase 6 was that it always requires crossing bedian or bhatta chowk to reach phase 5 or other phases and if DHA would build a underpass under bedian road then it would really increase the value of phase 6.
Is there anyway to inform DHA authorities about this?
Also i can see in the map proposed mahmood ghaznavi road whic would link phase 8/7/6 to RA bazar and cantt. when will this be completed?
A few family members of mine also have plots in phase 6 but they are worried about phase 6 access problems
(253)
Tuesday, May 3, 2011 05:20 AM PST 
Comments closed
Please advise me about SA Gardens and its development charges

Please advise me about SA Gardens Phase II, is it good place to invest and how much we need to pay as development charges other then offered cost Rs. 108,000 (per merla)

Sincer friend replied on Tuesday, May 3, 2011 05:50 AM PST 
No other chargers.No development charges.I prefer you to buy in plot in Sa garden phase 1.
Almost all work have been done in phase 1.Possession is also available in phase1.
On the other hand if u think u can wait for 3 years then go for phase2.
Its up to u.But i will recommend u phase 1 if u want to construct house right now or within 2years.

Ali ahmad replied on Tuesday, May 3, 2011 05:54 AM PST 
No Development charges for phase 1.But can't have information about phase 2 development charges.

Adnan replied on Tuesday, May 3, 2011 06:08 AM PST 
interesting posts at 11.20,11.50 and 11.54
will love to look at IP address for these posts:)

Majid replied on Tuesday, May 3, 2011 08:04 PM PST 
I request to Ch. Mujahid Yaseen Sab to please give some views about SA Garden , CMY , your opinion is very good for us

M. Shahbaz Rasheed replied on Tuesday, May 3, 2011 08:08 PM PST 
Mr. Ali Ahmad / Sincer friend, can i get plot in Phase 1 on instalment pay plan
I also request CMY to please give opinion on S.A. Gardens

SA Garden Lahore replied on Tuesday, May 3, 2011 09:36 PM PST 
Brothers I am sorry I am not updated enough SA Garden SA Garden to help here.
Ch Mujahid Yasin ( CMY )
03224009967

Sincere friend replied on Tuesday, May 3, 2011 10:00 PM PST 
M. Shahbaz Rasheed
I am not confirmed about that.However 95% plots have been sold out.Phase 1 plots are sold like HOT CAKES.I was also late like u and after that i took 3 months time to give them full payment.They agree and i got plot there.
I think its hard to find plot on installment in phase 1.You must call to their office no and get information.
thanks

Rana Salman replied on Wednesday, May 4, 2011 12:17 AM PST 
@Ali11
I think due to that (phase 2 30 %booking),which is low one,They have to reduce the rate from 1,20000 to 1,08000.
For long term at least for 5 year ph2 is good for investment.However for present situation and for residence purpose phase 1 is best.
@M. Shahbaz Rasheed
Choice is yours.Recommend u phase 1 :If u want to start construction within 3months to 1years.
Phase 2 : For long term plan at least 5 years.

ali11 replied on Wednesday, May 4, 2011 11:19 AM PST 
Phase-1 for " RESIDENCE " is not fully ready, although.....

janusz replied on Thursday, May 5, 2011 07:14 AM PST 

LRE Hot Topics replied on Friday, May 6, 2011 06:42 AM PST 
Post added to useful posts list. View MORE Useful Posts Click on >>> LRE Hot Topics

Rao Kashif replied on Wednesday, February 6, 2013 04:51 AM PST 
SA GARDENS PHASE II is also good. They are doing road works there. I think best place to invest. I also got one plot in SHOAIB block.

M imran replied on Saturday, January 18, 2020 12:07 AM PST 
Dear all i heared the the area specially phase ii of sa garden is flooded area and huge water comes into this area which might effect it.
(252)
Friday, April 29, 2011 05:36 AM PST 
Comments closed
further information

i just need to know if mr cmy kindly help me,about eden gardens.majority of pakistanies here in england buying houses rapidly in eden gardens, after media news that gajju matte of ferozeure would be one of the metro point under transit rail schems signed with china.i did contact with eden office in lahore but they dont have any house in eden gardens, i contacted one of the agent and he is asking 56 lakhs of 8 marla house in eden gardens, dear mr cmy, is it worth to pay such amount or what u sujjest me. i m ready to give u my private cell no if u kindly contact me on my email adress. many thanks for ur kind anticipation in this connection.

ali11 replied on Friday, April 29, 2011 06:40 AM PST 
@ Ahmed Shahaab,
At Eden Gardens several projects were launched. Like eden Dream Homes, Eden Gardens & Eden Lands.
First project launched was Eden Gardens which were due to be handed over this year. So far Few houses are under construction, water tank etc, only main Road is Partially built. Eden also launched Eden Lands at the spot. These plots are due to be handed over mid next year. It seems unlikely as houses are not built in time, so it will effect the Eden Lands (plots) handover as well. I visited the society few days back and took some snaps. If you like i can email you for you idea.
I also invested in Eden Lands keeping in view that it will be at Ring Road interchange, RMTS (Rapid Mass Transit Sytem) (which is like 5-7 years old project and so far nothing concrete has been done in this connection). Because of this LRMTS news, there is little stir in the market and agents are after sellers offering them only 70% or so of their investment and selling at whatever Allah knows better.
Eden Garden/Lands will be good future investment keeping in view
1. Ring Road, interchange,
2. LRMTS (a far cry)
3. DHA 9/10 adjacent
4. Central Park & Bahria Nasheman societies on Ferozepur Road.
5. Great improvement of Ferozepur Road, (still going on)
Please invest wisely.

Dreaming for eden house replied on Friday, April 29, 2011 11:16 PM PST 
Dear Ahmad,
Before investing on eden projects please see the comments of people on various web site. Project may be good but when will be deliver and who will get possasion. Now a days Eden mostly projects delayed and construction works are very slow and does not seems that they can handover on time. examps Eden abad was due in 2008 and many other

Eden Effected replied on Saturday, April 30, 2011 12:44 AM PST 
Please do not Invest with Eden. These are projects of two brothers Mr. Arshad Choudry and Mr. Amjad Choudry when they were together earlier than 8 years their all projects were credible and their name grow. But when they splited both are launching their projects with Eden Name but you can differentiate by their phone number.
Both have one policy using their last credibility collecting money from people in short period say for 18 to 24 months and getting profit on your money for long period but their comitment is false extreamly. Now currently in 2009 I purchased their product of Eden Vista but their land is ready and with boundry but not constructing the infrastructure according to their comittment to give us possession in Jan-2011. This type of situation came becasue property prices are not going high as before. They only sold 20% of project we are from those 20% effected. Unfortunately we have paid 74% rest we stop becasue of no any develpement.

LRE Hot Topics replied on Saturday, April 30, 2011 08:51 AM PST 
Post added to useful posts list. View MORE Useful Posts Click on >>> LRE Hot Topics

ahmed shahaab replied on Sunday, May 1, 2011 02:13 AM PST 
dear mr aliII
sorry i was a bit busy so couldnt contact u well in time, i shall be grateful if u kindly send my the snap,i also understand the comments of my friends about eden delay tactics but this is not a problem for us. we dont have any plan to get house on time. but what we know that eden is one of the reliable company, apart of its delay problems,pakistanies in england love to invest in eden. because it is safe and sound. there is non transfer problem, no hurdle and even no hazards with eden,i m only interested in eden gardens which i believe nearer to main ferozepure road,i also discussed the matter with one of my friends and he told me that eden is going to handed over houses in the last quarter of this year, which i think is correct as i did dicuseed with eden and saying the same words. anayway i m looking house in eden and hopefully will get before my visit which is due at the end of this year. in the mean time take care and Allah Hafiz to all friends

ali11 replied on Monday, May 2, 2011 12:43 AM PST 
@ahmed Shahaab,
I sent you pictures at your email. Do check you junk folder, as it might go there because of attachments. regards

Fayyaz replied on Wednesday, May 11, 2011 09:28 PM PST 
Dear Ali11
Pl send me the snaps of Eden Garden which u have taken few days back. Thanks.
HTML code is disabled   Previous Page   Next Page