Lahore Real Estate Forum

Thursday, November 26, 2026 01:44 AM
Total records50
Records per page10
Page views today1,310
Page views last hour1,310
(50)
Friday, January 13, 2012 09:53 AM PST 
Comments closed
(49)
Friday, November 18, 2011 08:54 PM PST 
Comments closed
(48)
Thursday, July 14, 2011 10:32 PM PST 
Comments closed
Use of bricks/cement blocks in house construction

Dear Brothers,
I want to construct my house in Naval Anchorage Islamabad. I would request all Brothers on the forum to advise me on use of conventional bricks verses cement blocks keeping in view cost factor, weather effects and durability. How about use of bricks (called kinger grade).
Regards

AG replied on Thursday, July 14, 2011 11:39 PM PST 
@Mohsin Khan.
1.Hollow cement blocks are used in Frame Structure Construction which is costlier, stronger & lasts longer than construction with bricks. Hollow blocks have very little compressive strength, simply fill the gap between columns & beams. They provide better thermel insulation due the air traped inside them.
2. Brickes are used for Load Bearing Walls Construction which is relatively fast, reasonably strong & lasts for a reasonable length of time if maintained properly. For house construction this type of construction is common.
3. Kinger Grade bricks are, usually, used in foundation walls upto DPC level which is burried in the soil below the Finished Floor Level. They are also broken into pieces (Rorri) to be used in the floor. They are not used for construction of walls above the floor level because their surface is not smooth & you can not get required finishing after plstering.
Those who can afford should go for Frame Structur Construction particularly for the areas prone to Earth Quackes.
Regards.

Mohsin Khan replied on Friday, July 15, 2011 01:14 AM PST 
Respected AG,
I am grateful for your valuable advise. Kindly let me know cost ratio in
use of Hallow cement blocks and Bricks.
Kind Regards

AG replied on Friday, July 15, 2011 01:53 AM PST 
Dear Mohsin Khan.
Regret my unabality to comment on your request because I Live in UAE & have no idea of Cost/Sq.ft of Frame Structure Construction. However I recently build my house in Bahria Town Lahore by a contractor @ PRs. 1600/Sq.ft using bricks. & am happy with the quality of construction.
Regards.

Mohsin Khan replied on Friday, July 15, 2011 08:08 PM PST 
Dear AG,
Thanks for sharing your experience. Wish you a very happy living in UAE.
Profound Regards,
Allah Hafiz

Ay. Butt. replied on Friday, July 15, 2011 09:45 PM PST 
AG Uncle what is your address, I mean in which area you are living in UAE.

AG replied on Saturday, July 16, 2011 04:46 AM PST 
@Ay. Butt.
I live in Abu Dhabi near Ministry of Labour/Khalifa Park on Salam Street.
My email adress:
May Allah (SWT) bless you all & Pakistan.
Regards.
(46)
Sunday, November 2, 2008 09:13 AM PST 
Comments closed
DHA VALLEY OVERSES BALLOT RESUL? SUCCESSFUL LIST OR UNSUCCESSFUL LIST?

Dear Friends,
Can anyboby tell me that DHA VALLEY OVERSES BLOCK BALLOT RESULT is Successful candidates or Unsuccessful candidates ?
Yesterday DHA web site mentioned it on DHA valley oveses block site as Successful candidates but today mentioned as Unsuccessful candidates on DHA valley site.
Regards ,
Dr.Rasheed Aghai

M. Ali replied on Sunday, November 2, 2008 09:23 AM PST 
Dr. Sb, Why don't you use the same search link that you provided earlier on for successful candidates for DHA Valley. It is the same link for DHA Valley Overseas too. Try that and I hope it will help to solve this puzzle.

Jameel replied on Sunday, November 2, 2008 09:33 AM PST 
Dr Sahib, If you have applied 90% chance you got the plot and if you are overseas 100% chance, All of my friends who applied from UAE got the plot, one friend Got 8 Plots for all applications, Now he is regretting. But dont worry if you get or Dont get, I guess for short term it will be no profit no loss business. After 2,3 Instaments you may lose some money if market remain at same sentiment. In long term like 10+ ys there may be resonable profit if DHA could develop it in time. As small plots will be populated earlier.

AN OVS replied on Sunday, November 2, 2008 10:04 AM PST 
It is very confusing.
Now they move overseas results to DHA valley but what I understand these were two different projects and expected ballot result was in november.
We paid $250 non refundable as admin fee and they can not inform us properly.
CHOOORON KA TOLA

AN OVS replied on Sunday, November 2, 2008 10:12 AM PST 
http://www.dhai.com.pk/osdhavalley/booking.php
Now there is nothing at all.
DHA Management really a "chooron ka tolla". white collar impostor

Rasheed Aghai replied on Sunday, November 2, 2008 10:35 AM PST 
Dear AN OVS
Really DHAI is very unprofessional, unorganized,unreallistic, unmannagable & unpredictive organization. They their self don,t know, how to mannage the things properly in a decent way.
Now we can understand why the peoples were saying from the very begining "that DHAI will loot the peoples especially overseas.
May God save all of us.
Rasheed Aghai

akhtar replied on Sunday, November 2, 2008 07:47 PM PST 
DHAI valley overseas block ballot results
http://www.dhai.com.pk/osdhavalley/AllOverseas.xls

nasir gill replied on Sunday, November 2, 2008 10:52 PM PST 
does any body know the procedure how to rfund the down payment for unsuccess candidates

Rasheed Aghai replied on Sunday, November 2, 2008 11:41 PM PST 
Dear Mr.Akhtar,
Can you tell me , this result is SUCCESSFUL CANDIDATE OR UN SUCCESSFUL CANDIDATE ?
waiting for reply.
Regards,

Hassan replied on Monday, November 3, 2008 07:06 AM PST 
Nasir Gill ,are you from Samanabad, Lahore and passed your matriculation from Central Model School !

nasir gill replied on Monday, November 3, 2008 09:40 PM PST 
Hassan,
long time before i was in shalimar colony and i stayed only up to primary ()

KHALID NAVEED TAHIR replied on Thursday, November 27, 2008 06:02 AM PST 
01330003

khadim hussain replied on Monday, December 8, 2008 10:35 AM PST 

Mohsin khan replied on Monday, December 24, 2018 05:43 AM PST 
Dyi 055690

Mahmood shah replied on Friday, January 11, 2019 11:39 PM PST 
DYI 35504

Tayaba khan replied on Saturday, January 12, 2019 05:13 AM PST 
Dyo-03294
(45)
Sunday, April 13, 2008 10:49 AM PST 
Comments closed

Hallo Friends
Approximately how much money will I need to build a two story house on Ten marla Plot in Bahria Town, Rawalpindi.
Regards

CMY replied on Sunday, April 13, 2008 10:59 PM PST 
Construction costs are Rs 850 to 1400 per SQ ft covered area. Normal 10 marla have 2500 to 35 Sq Ft covered area.

Syed Atique replied on Monday, April 14, 2008 02:41 AM PST 
Dear CMY,
What will be include in RS.850 per square feet.Please give uslittle detail.
Thanks in advance

Eng Overseas replied on Monday, April 14, 2008 04:03 AM PST 
Its clear when we talking about per sft cost, including all and every thing , also we can treat an turn key.
This my opening as a civil engineer

safwan replied on Monday, April 14, 2008 09:51 AM PST 
Moshin,
I am buliding my house on turnkey basis, rate is $1300/sq ft. Very good and an honest contractor (my opinion). house is being built in zone-5 islamabad. if you need to talk to him, let me know and I can email his information to you (please post your email address). Dont want him to be bothered by non-serious calls. please do your own due deligence when selecting architect and builder.

fourvoyagers replied on Monday, April 14, 2008 08:11 PM PST 
@Mr. Safwan!
Please clarify whether your posted figure is in Dollers or Rupees!

syed Atique replied on Monday, April 14, 2008 09:16 PM PST 
DearCMY/Eng.,
Pleasee xplain little bit more that Rs 850 to 1400 per SQ ft RS 550 difference justified what?
Thanks in advance for your kinddetail answer

CMY replied on Monday, April 14, 2008 10:20 PM PST 
Friends Rs 850 to 1400 per sq foot include every thing. All material and labor.
In Rs 850 you get very basic contraction quality where floors walls ceiling windows and doors will be lowest standard. But at Rs 1400 you should have top class marble or imported tiles flooring, best woodwork decorative ceilings etc.

safwan. replied on Tuesday, April 15, 2008 04:50 AM PST 
oops my mistake, its rupees.

Khayyam Shahzad replied on Tuesday, April 15, 2008 04:51 AM PST 
Dear Safwan,
I am based in US and just bought a plot in D12-2. The area is not ready to be build yet, but will so sometimes this year. Can you email me your contact and the builder details please ?
Thank you.

Khayyam Shahzad replied on Tuesday, April 15, 2008 04:52 AM PST 
Forgot to mentione my email

Safwan. replied on Tuesday, April 15, 2008 04:56 AM PST 
One more thing, all material is top of the line. Construction time is 10 months (start to finish). Our started in Feb and schedule to finish in Oct-Nov. They are going to start the 2nd floor in next few days. Again, please do your due deligence and make sure at your end.
My Shahzad,
please put your email address so I mail you the information.

Zahida replied on Thursday, April 17, 2008 04:51 AM PST 
Dear Safwan
I am also planning to build our house in E11 plot size 35x65 please can you let me know the details of the contractor so I can send him the plan of the house and get a quote. We want 2 portions plus basement do you know how much this would cost roughly. As we live in the UK we really need someone honest and who will not cheat with the material as this house will be my second home so would like it to be the best! Thanks for all your help

syeeda replied on Thursday, April 17, 2008 06:47 PM PST 
@ safwan assalamu alikum
well thats so great information for us who lives out side the pakistan, i have 2 plots in rawalpindi and iwanna to build them, plz leme know the contractor address and detail as well, i will be so thank full, coz i need the honest contractor and want da best things for my home. my email is

Zahida replied on Friday, April 18, 2008 02:05 AM PST 
I thought you would now as you had posted previously the following:
replied on Sunday, April 13, 2008 04:51 PM
Moshin,
I am buliding my house on turnkey basis, rate is $1300/sq ft. Very good and an honest contractor (my opinion). house is being built in zone-5 islamabad. if you need to talk to him, let me know and I can email his information to you (please post your email address). Dont want him to be bothered by non-serious calls. please do your own due deligence when selecting architect and builder.
I suppose I am asking the wrong guy who is making fun of the situation!! Good luck with your project!

Safwan replied on Sunday, April 20, 2008 12:31 AM PST 
Well I am sorry I did not check site and messages, someone told me about the msgs and now I'll be responding to them,
Syeeda, please check your email I send you contact information.
Zahida, please post your email and I'll send you the same.
Apologize for the delay.

Zahida replied on Sunday, April 20, 2008 02:39 AM PST 
Thank you for the reply. My email is Thanks in adavnce for all your help

safwan replied on Monday, April 21, 2008 01:55 AM PST 
Zahida, is been sent to the email address above.
(41)
Sunday, September 30, 2007 09:24 AM PST 
Comments closed

LAHORE: Foreign investors will develop the Defence Housing Authority's (DHA) Phase-VIII, Daily Times learnt on Wednesday. DHA officials said that the authority already had a contract with a Malaysian firm for developing the Defence Raya Golf Resort. Negotiations for Phase-VIII's commercial development are underway with the Indonesian firm, Ciputra, they added.
DHA officials revealed that negotiations between Ciputra and the DHA started three months ago and were almost complete. Representatives from Ciputra gave a briefing outlining their plans for Phase-VIII's commercial development to the Lahore corps commander, Shafaat Ullah Shah, in March. They said that the company would probably be awarded a contract for developing Phase VIII's commercial areas. Shah appreciated Ciputra's plans and assured the cooperation of the DHA management's if the contract was awarded. He said that the negotiations would be conducted with a high level of transparency. DHA officials said that foreign investors had expressed interest in the commercial projects announced by the authority. Several investors are expected to deliver presentations on Phase-VIII to the commander soon, they added. President General Pervez Musharraf attended the groundbreaking ceremony of the Defence Raya Golf Resort in November 2006. The resort has an integrated golf course and luxury residences. It is a collaborative project between DHA and a Malaysian company, Bandar Raya Developments Berhad (BRDB).
DHA officials said that the Lahore Corps Commander was interested in developing DHA through foreign investments. ISO award: The DHA has been awarded ISO certification in housing development. It is Pakistan's first housing society to get the certification. ali waqar
dailytimes.com.pk
HTML code is disabled     Next Page