Usage of Cement bags for 10M, Plot in Baharia Town Islamabad/Rawalpin

I am planning to construct a 10M house in Baharia Town Rawalpindi and need a guidance from the Civil Engineers and Contractors regarding requirement of the material:
Specification of the house are:
1. Ground Floor: Two Beds, One Drawing and dinning room, one TV Lounge,two Bath rooms and one kitchen.
Covered area 1850 sq.ft
2. First floor: Three Bed Rooms, three bath rooms, one TV Lounge,one kitchen and one store. covered area 1250 sq. ft
3. Servant quarter containning bed, kitchen, store, kitchen- covered area 250 sq.ft
Material requirement:
1.No. of Bags of cement
2.No. of tons of Steel
3.No. of bricks
4.Crush, No. of dampers
5.Sand, No. of dampers
6. No. of bags of cement required upto DPC Level (foundation depth is 4feet)
6.No. of tones of steel up to DPC level
Note: Which is good option either purchase steel, bricks and cement in lump sum or part by part
Answer of above said queries will be well regarded and appreciated.
please, left your contact Nos. so that I can make contract agreement if rates are accepable to me.
Thak u all

atiq raja. replied on Wednesday, January 11, 2012 05:00 AM PST 
you can not estimate like this,simply 1300 to 1800 per/sqft according to the covered area.

Habib Ullah replied on Wednesday, January 11, 2012 08:27 PM PST 
cement bags: 820 Nos.
Steel:10 ton
Bricks: 80,000 Nos.
Crush: 2608 cu-feet
Sand: 2600 cu-feet

Pardesi log replied on Wednesday, January 11, 2012 09:26 PM PST 
Thank u Habib ullah Sahib: But, regarding No. of bags of cement, it is informed to me that around 1300 to 1500 bags of cement are required fo 10M, double storey house. Can u please re-confirm this figure, please.

.... replied on Wednesday, January 11, 2012 09:37 PM PST 
My experience tells me that 900-1000 bags of cement are enough for 10 marla double story house if you go for RC lanter

Habib Ullah replied on Wednesday, January 11, 2012 10:22 PM PST 
Keep in mind 1000.

Bilal2012 replied on Wednesday, January 11, 2012 10:39 PM PST 
@Habib
10 ton steel? i dont think 10 ton steel is required

Civil Contractor replied on Wednesday, January 11, 2012 11:29 PM PST 
1500bags are required.

Pardesi log replied on Wednesday, January 11, 2012 11:32 PM PST 
There is a big gap b/w 1000bags and 1500bags, kindly give me the accurate estimate based on the above said specifications of the house.

kashif Ali replied on Thursday, January 12, 2012 02:08 AM PST 
Brother I constructed my 10 marla house and roughly 1000 BAGS used for complete 10 marla double story.

Irfan Raja replied on Thursday, January 12, 2012 05:43 AM PST 
I used 995 bags exactly.

Ch. Nadeem Aslam. replied on Thursday, July 19, 2012 04:59 AM PST 
Dear I want to construct 5 marla double story corner house in DHA lahore. Can you please tell me how much bricks, sand, crush and steel I need to complete grey structure.
(17)
Monday, December 19, 2011 02:24 AM PST 
Comments closed

Kindly inform me the rates of construction material & labour rates in Rawalpindi Islamabad area:
Bricks
Steel
Cement
Crush
Sand etc.
Labour rates
Tesi Kandi covered area
Tesi Kandi covered area+ extra area works
Than you all

jk replied on Monday, December 19, 2011 04:54 AM PST 
Bricks 7000 TO 8500 PER 1000
Steel 68000 TO 72000 PER TONE
Cement 395 TO 405 PER 50 KG BAG
Crush 25 per sq ft
Sand etc. 22 per sq ft
Labour rates 210 per Sq.ft
Tesi Kandi covered area
Tesi Kandi covered area+ extra area works

jk replied on Monday, December 19, 2011 04:56 AM PST 
Correction please
Crush and Sand rates are per cubic feet and not sq.ft

Pardesi log replied on Monday, December 19, 2011 09:34 PM PST 
Dear Jk thank u for ur reply, but please let me know the reason of variation in prices whether based on quality of material or only dealer to dealer
Bricks 7000/1000 for which quality and 7500/1000 for which and 8500/1000 for what?
steel 68000/ton for which company and 72000/ton for what brand?
Cement 395 for which Compnay and 405 for which brand?
Thank u once again

A.Akram replied on Tuesday, December 20, 2011 01:56 PM PST 
Brothers,
Can you please advice that how much material (No. of Bricks, cement bags, steel etc.) is required for a standard 10 Marla house of 2800 sq. ft.
Thanks.

Ahmad replied on Tuesday, December 20, 2011 05:54 PM PST 
Dear JK Sahib,
Sir I have a question regarding roof heat insulation.
Do you recommend BOARD and what thickness is good for Lahore weather?
Also can you please send me your email at
Thanks

jk replied on Tuesday, December 20, 2011 11:41 PM PST 
Dear Ahmed,
Proper water proofing and roof insulation is very expensive item and not advised to spend much on this issue as it is not the only roof that brings in heat but single core walls and windows as well.
I will suggest to lay roof with very minor slop so that water does not stand on and then use gypsum false ceiling as it gives decoration and prevent heating too.