Miss commitment From Contractor regarding renovation of house

Dear Construction experts and relevant
AOA
Pls. advise me on this matter.
I signed an turn key agreement with a contractor to renovate a 10 marla house as per drawings (drawings given by me includes building, electrical and sewerage drawings. I get separate services of an architect for these drawings).
Before the signing of agreement the contractor visited the site and thoroughly viewed the site and then he gave me final quotation, i got two three more quotation and after comparing the items i selected this contractor.
The contractor violated agreement variously but main violation is time. The agreement to complete was 4 months but after passing 6 months he could not complete the gray structure (its very painful as we shifted to rented house).
2. Other Violation is Payment plan. He mention in agreement that 10% on different job but he insist to pay more amount for various activities and till yet i had paid 26/27 lacs which is almost 700,000 excess payments (as many activities not yet started/completed).
3. The quility of his work is not as per mentioned standard as he mentioned in his agreement that every activity will be A+ (the best quality available with their firm).
Some other violations which u understand as normal contractor did.
During last 2/3 months i ask him many time (not only personally but also send SMS and Whattsapp) to speed up my work and complete my work in time but his routine did not changed.
One or two times I want to kick him but my friends (Including one witness in agreement) ask me to continue work with him as money will struck so i kept mum to avoid disrupt my work.
Whenever i ask him about delayed work he says that your building was to complex and cost which he gave is too lesser. Although he did not ask to quit the agreement but his delaying tactic suggest me to think otherwise.
Pls. mention what should do in this situation as i am really disturb in this situation.
Best Regards.

Shahid1 replied on Saturday, July 1, 2017 03:51 AM PST 
That is very common with more constructors. They try to get more money from you at the start of the project. If now he has less money to get from you and more work remaining then he will never finish it.
His goal is to re-negotiate agreement with you and get more money. Either you hire a new person or work with him, you will end up paying more money eventually. Either way in future, don't give contractors extra money up front.

Waseem� replied on Saturday, July 1, 2017 03:53 AM PST 
Even if you have legal contract, it will be of no use. There are consumer courts, which probably can help. If you want to do legal action, these consumer courts can probably help. Do check with these consumer courts thoroughly before taking any action. 2nd option is to terminate contract with him & hire someone who can complete the job & this will rid you from further tension & trouble. If this contractor is making trouble he will continue doing same in future, so better kick him out.

ShahzadQamar� replied on Saturday, July 1, 2017 09:05 PM PST 
I dont think going legal will help you out anything as you yourself have breached by paying extra or upfront. The rules of agreement are straight that you pay on completion to enable you termination of agreement any time and to keep contractor under your terms. Now that you have already paid more than the work legal action will not give you anything except allowing you to terminate agreement without any further payment and perhaps thats what your contractor would love to have. I dont know the total value of your agreement and percentage completed but if you have not paid more than 50% better terminate and if you did better work it out with existing contractor to let it be done with some acceptable quality. Else if you have someone in POWER use him. Sharief banday ko bardasht e karna parta hy bus

JD replied on Saturday, July 1, 2017 11:04 PM PST 
I would suggest swallow the pill and move on. However what is the guarantee that your next contractor is not like him! It's a nightmare unless you know that the contractor is reliable. Unfortunately reliable and dependable and two words that even money can't buy in Pakistan !
Take the hit and move on - how much are you loosing out ?
(27)
Monday, January 23, 2017 06:32 PM PST 
Comments closed
(26)
Friday, January 13, 2017 09:19 PM PST 
Comments closed

Item Wise suggestion to construct 270 Sq yard (2+3 beds & at least 5 bath)
Dear all
AOA i am building a house around 270 sq yard having 2+2/3 beds with 2 kitchens & T.V lounges etc. Let me know which items to use for each category, to finalize the cost with vendor on turnkey basis
1. How much space is required for false ceiling and roof
2. What size is recommended for border scarting?
3. What is best size of tiles for indoor flooring in cost range 1400 to 1800?\
4. Different or same tiles should be used for drawing/T.V loung and bed room flooring?
5. Which tiles are recommended for kitchen & stair slabs, main door entrance etc?
6. What is best tile/marble/granite for kitchen & bath flooring with sizes range is 1300 to 1600?
7. What tile/marble are recommended for garge and outside area size in same cost?
8. What is best wires for home use and estimated cost for 270 sq yard house as mentioned in starting.
9. Wt. Is best for bath rooms i.e building shawar cabin or bath tub also tell me i want comode and CW in almost all wash room. My plan is to build at least 5 baths (4 attached and one spare on any suitable floor). What will be cost for each baths and which company items in the range of 50000 to 80000.
10. For wood work ash wood door or semi solid door are recommended. Which item is least effected with deemak?
11. For plumbing work which brand pipes should be used and .5 or .75 size of pipe is better for flow of water.
12. For front and back elevation rock wall or graphy give more attraction?
13. For interior decoration which add more beauty i.E paint or wall papers? if you pls. Share here any easy book or any other material for home construction i will be great full to you.Dear all
AOA i am building a house around 270 sq yard having 2+2/3 beds with 2 kitchens & T.V lounges etc. Let me know which items to use for each category, to finalize the cost with vendor on turnkey basis
1. How much space is required for false ceiling and roof
2. What size is recommended for border scarting?
3. What is best size of tiles for indoor flooring in cost range 1400 to 1800?\
4. Different or same tiles should be used for drawing/T.V loung and bed room flooring?
5. Which tiles are recommended for kitchen & stair slabs, main door entrance etc?
6. What is best tile/marble/granite for kitchen & bath flooring with sizes range is 1300 to 1600?
7. What tile/marble are recommended for garge and outside area size in same cost?
8. What is best wires for home use and estimated cost for 270 sq yard house as mentioned in starting.
9. Wt. Is best for bath rooms i.e building shawar cabin or bath tub also tell me i want comode and CW in almost all wash room. My plan is to build at least 5 baths (4 attached and one spare on any suitable floor). What will be cost for each baths and which company items in the range of 50000 to 80000.
10. For wood work ash wood door or semi solid door are recommended. Which item is least effected with deemak?
11. For plumbing work which brand pipes should be used and .5 or .75 size of pipe is better for flow of water.
12. For front and back elevation rock wall or graphy give more attraction?
13. For interior decoration which add more beauty i.E paint or wall papers?
14. What other matters and main items to discuss and finalize with contractor before siging of contract.
If you pls. Share here any easy book or any other material for home construction i will be great full to you.
Best Reards

farigh admi replied on Saturday, January 14, 2017 10:35 PM PST 
meray bhai itnay saray kaam free nahi hotay..

Asif replied on Saturday, January 14, 2017 11:28 PM PST 
Agree, there should be some book/guide for construction in Pakistan.

Pakistan� replied on Sunday, January 15, 2017 12:57 AM PST 
how much it took you to write all this?
just wondering

RavianGik� replied on Sunday, January 15, 2017 04:15 AM PST 
Dear It is best you refer to book " Apna ghar khud banwain" available at Feroz sons Lahore. One of simple do it yourselg guide

Kk replied on Sunday, January 15, 2017 04:49 AM PST 
What's your total budget for this construction

Waseem� replied on Sunday, January 15, 2017 05:43 AM PST 
1. How much space is required for false ceiling and roof
It depends upon the design, approx 12".
2. What size is recommended for border scarting?
Minimum 3".
3. What is best size of tiles for indoor flooring in cost range 1400 to 1800?\
Best size is big size. in your price range you can get 39"x39" tile.
4. Different or same tiles should be used for drawing/T.V loung and bed room flooring?
Its your choice. Too many different tiles will make the house hotch potch if tils are not properly selected. Make 1 or 2 bed & drawing different, otherwise one tile give a clean & broad look.
5. Which tiles are recommended for kitchen & stair slabs, main door entrance etc?
Mostly used is Galaxy Granite. If your budget is good, go for pure white marble.
6. What is best tile/marble/granite for kitchen & bath flooring with sizes range is 1300 to 1600?
Lots of variety is available. Your budget is for square meter or square feet ?
7. What tile/marble are recommended for garge and outside area size in same cost?
To get the best idea you must visit market as lots of variety is available.
8. What is best wires for home use and estimated cost for 270 sq yard house as mentioned in starting.
Pakistan Cable, Newage cable, Fast cables
9. Wt. Is best for bath rooms i.e building shawar cabin or bath tub also tell me i want comode and CW in almost all wash room. My plan is to build at least 5 baths (4 attached and one spare on any suitable floor). What will be cost for each baths and which company items in the range of 50000 to 80000.
Shower cabin is always best., Bath tubs or jacuzzis are rarely used. Some of your choices are totally naive! Comode & CW in all wash rooms will eat lots of space. Have you discussed these things with your architect??? Again lots variety for faucets etc is available in market. Make a visit to market & you will get an idea.
10. For wood work ash wood door or semi solid door are recommended. Which item is least effected with deemak?
Termite cannot effect Diyar wood, anyother wood is prone to termite. When you do fumigation, use top quality chemicals, then you do not have to worry about termite. Definitely good Quality of Ash wood door will last long, however, be careful, as there are is lots of variety in Ash wood also. Do not depend on your carpenter but do you research in the market.
11. For plumbing work which brand pipes should be used and .5 or .75 size of pipe is better for flow of water.
Popular or Dadex, both are good both are widely used.
12. For front and back elevation rock wall or graphy give more attraction?
Rockwall gives good look, however, your cement plaster should be very neat otherwise Rockwall will not look good. Graphy hides defects in cement plaster.
13. For interior decoration which add more beauty i.E paint or wall papers? if you pls. Share here any easy book or any other material for home construction i will be great full to you
Wall paper on 1 wall in a room lift the room ambience. There is so much variety in wall paper, that paint cannot compete.

Sam Dar� replied on Monday, January 16, 2017 06:37 AM PST 
Waseem Salute your patience and detailed answer ! You should be rewarded

Saleem Mahmood replied on Monday, January 16, 2017 06:43 PM PST 
An excellent contribution Waseem sb. I salute to you on valuable addition.
(25)
Monday, December 26, 2016 07:00 PM PST 
Comments closed
Turn key cost of 10 Marla house

Dear construction expert AOA
I am in process to finalize a contract with a contractor for renovations of 10 marla house.
Plz. Mention which things should keep in mind before finalization of agreement. Contractor did not mentioned item wise cost of each and every thing rather mentioned total cost. Thx. In advance.

Asif replied on Monday, December 26, 2016 08:21 PM PST 
You should have detailed contract with items and its quality to be used.
that way you will know where to spend more and where low quality will do the job.. even you can reduce total cost while going in details and its also safe for you.

Habib replied on Tuesday, December 27, 2016 12:26 AM PST 
Better review some Old contract, see some easy Book like " Apna Makan Khud Banwain" from Ferozesons
Most Important is Not to release Money Fast and should be Slow and make it Clear to Contractor as Towards end Most Thekedar Lose Interest as they Have already gained and More is Loss, Usually Grey structure Coast only 40% and Final Finishing another 60%, So don't get deceived By paying more money once grey structure is Completed, Grey Structure Gives Bird Eye view that House is Completed which is wrong

Saleem Mahmood replied on Tuesday, December 27, 2016 06:38 PM PST 
AOA
dear Asif and Habib sb. Thx. for information as this is my ever 1st experience.
Could u pls. Share copy of detailed agreement showing items quality and cost etc.
If you could share the link of easy book as I could not find on net. If u do not want to send publicly then send it on my ID saleemmakhtar@ gmail dot com. Thanks again

S. M Akthar replied on Tuesday, December 27, 2016 06:53 PM PST 
Some body can share link of easy book and copy of agreement showing detailed contents of items and their cost. Really great full.
(24)
Thursday, April 3, 2008 06:39 AM PST 
Comments closed
House in Johar Town, LAHORE Available for Rent

My own house slightly used fully marbled/tiled beautiful location. 5 Marlas double J-1 near from main Canal, Park, Market and Mosque 3 beds & 3 baths kitchen store. Parking of big car with 3/5 bikes. Outside lawn/green area and lot more. Contact only serious famalies.
Said House will be available in next week as white wash and some necessary finishing is going on.
Rent negotiable.

Asim replied on Saturday, April 5, 2008 11:52 PM PST 
very much interested to rent this house. pls call me tonight after 09:00 PM.

Asim replied on Saturday, April 5, 2008 11:53 PM PST 
very much interested to rent this house. pls call me tonight after 09:00 PM. on

imran replied on Friday, March 11, 2011 05:40 PM PST 
Pls call or text me your number, if this house is still vacant
(23)
Thursday, September 20, 2007 06:38 PM PST 
Comments closed
Price of 10 marla house at PIA society

dear all respectable fellows
i need the information urgently so pls. reply soon.
i want to know the price of 10 marla house single/double 3 to 5 years old at PIA society.
thanks in advance
saleem

guest replied on Friday, October 26, 2007 05:28 AM PST 
i just sold my house in block b for 58 lakh. 10 marla.
new news that road have started so price has changed to 65 to 70 lakh for 10 marla houses.
thanks
(22)
Wednesday, July 25, 2007 01:10 AM PST 
Comments closed
house required

In spite of my previous post I could not find the desired house.
I want o purchase a house 8-10/12 marlas. My preferred localities but not restricted are schemes around canal but before tokhar naiz baig, including fiasal/model/johar/WAPDA town, PCSIR ph I etc. House may not be new one but not more than 5/7 years old.
The preferred specifications but not restricted to are double story having 3-5 bed rooms with attach baths and kitchen(S), car porch of 2 cars, drawing dinning tv lounge etc. front street be more of 25/30 feet. My range is 3.5m to 4m but in exceptional opportunity can be changed.
If some one who really want to sell and in need of payment may mail me with complete particulars.
thanks and regards
Saleem

guest replied on Wednesday, July 25, 2007 04:09 AM PST 
Be specific, you want 8, 10 or 12 marlas.

Saleem Mahmood replied on Thursday, July 26, 2007 08:54 PM PST 
Dear Mr. guest
AOA
no compulsion with reference to area. The house my be any either 8,10/12 marlas.
there is need of house whit mentioned specifications.
thanK U
Saleem Mahmood