AOA
I want to build my 10 Marla House . I want to ask which one is the best option for construction
1) Builder with Trun key bases( any ecommandation of builder)
2) Builder with grey structure and finish by my self
3) Build by my self
In last option i ll be confirm what material is using . In First 2 options i don't know what they are using except if i got any trust able builder.
Thanks

Abdul Ghani replied on Thursday, September 18, 2014 10:58 AM PST 
You save 20% if you build yourself.

Essa replied on Friday, September 19, 2014 01:28 AM PST 
Thanks @Abdul Ghani Shaib
Any builder recommendation

Izhaq replied on Friday, September 19, 2014 07:18 AM PST 
Dear sir,
Get house grey structure built by builder. Do the rest of finishing stuff by your self. You will save money doing this and complete house according to ur likeness. you looking around at least 55 lac for a decent house complete construction ( 5 months ) time.

shawn replied on Saturday, September 20, 2014 12:50 AM PST 
dear izhar
is 55 lakh include everything construction and finishing: I mean complete house.

khan replied on Saturday, September 20, 2014 04:47 PM PST 
mr izhar i have intention to build my dream house.you have experience of building your house.i want to take advantage of your experience.could you please give me your email id so that i could ask you in detail.thnx in advance.

Habib replied on Sunday, September 21, 2014 01:17 AM PST 
IF you are busy and Have No experience then Turn Key is the best agreement, But Make sure to write agreement, what material will be used Take expert Opinion. Make sure that extra work rates are fixed, In case you need to do some thing more than the agreement then rates of wall making plaster and Floor etc should be fixed.
The extra work Is usually a dispute as you cant foresee many things and in Dispute only Thekedar gets benefit.
Also Fix How You will pay. There is an Illusion that when Walls and Concrete roof is done it looks house is erected but actually only 30% work is done so make sure that you dont pay more than this at this stage. If Thekedar has already taken 50% he will run away.
Contract with Material needs supervision as well.
Foudation 8% Work
Walls and roofs 30% work
All Plater Roof Tiles Plumbing Pipes and wiring Pipes Floor Palter "Kacha" 50 % work Completed.
Floor Kitchen Baths Doors wood work Paint Polish outside Boundary an Lawn etc then Completion certificate obtained 100%
In Otherwords Material and Labour Cost is More to Finish the House.
I completed small Construction In My Own Suervision and it Costed me only 1500 Per Sq feet
But Usually Turn Key rates are about 2000 Per Square feet.