Lahore Real Estate Forum

Thursday, November 26, 2026 12:21 PM
Total records99367
Records per page10
Page views today24,908
Page views last hour1,923
(55787)
Tuesday, December 25, 2012 11:47 PM PST 
Comments closed
(55785)
Tuesday, December 25, 2012 06:19 PM PST 
Comments closed
(55784)
Tuesday, December 25, 2012 10:59 AM PST 
Comments closed
(55783)
Tuesday, December 25, 2012 05:00 AM PST 
Comments closed
3 phase WAPDA connection

Slam
I am having 3 phase WAPDA connection at my house and getting bill in thousend even in this chill winter.
Some one told me that either to convert this meter in single phase or get another connection of single phase.
If someone has done the job recently pls. share here. Pls. also mention actual cost of single phase meter.
thanks in advance.

Khan replied on Tuesday, December 25, 2012 06:19 PM PST 
The number of phases has nothing to do with the bill. Log your reading on a daily basis for a week or a month and see what is the problem. It could be defective meter.

dxb replied on Wednesday, December 26, 2012 05:05 AM PST 
3 phase meter once disconnected will cost huge sum of money to restore. check with a couple of wapda linemen instead of asking onthe forum. as forum babus might give u misleading information.
(55782)
Tuesday, December 25, 2012 01:24 AM PST 
Comments closed
(55781)
Monday, December 24, 2012 08:31 PM PST 
Comments closed
DHA Lahore Phase 8 Development Update Dec 2012

DHA Lahore Phase 8 Development Update Dec 2012 http://www.lahoreestate.org/dha-lahore-phase-8-development-update-dec-2012/ Or https://www.lahorerealesate.com/DHA-Lahore-Phase-8-Development-Dec-2012/ Or http://www.dhalahore.net/2012/12/24/dha-lahore-phase-8-development-update-dec-2012/ Thanks to Hasan Abrar sahib for taking these pictures and sharing them with us at LahoreRealEstate.Com Choudry Mujahid Yasin ( CMY ) Info@LREPK.Com

Khan replied on Monday, December 24, 2012 08:47 PM PST 
Dear CMY Sahib
Thanks. Is there any development work in sector "X"?

Hasan replied on Monday, December 24, 2012 09:13 PM PST 
Khan sb
picture number 33, 34, 35 are of X block.
development is going on in blocks almost equally.

Khan replied on Monday, December 24, 2012 09:31 PM PST 
Thanks a lot to LRE team. Great job as usual.

hassan replied on Monday, December 24, 2012 09:45 PM PST 
ive a very simple question who demands a professional reply..what is going to happen with Y block where alot of earth filling is required to even construct the roads? any idea since its tooooooooo deeep almost 35 to 40 feet.

ahmed replied on Monday, December 24, 2012 10:25 PM PST 
Dear CMY, Great Efforts, May ALLAH bless you,
looking at the pictures, the road in picture #6 is a new road developed as phase 8 development or still the road marking on the sand is the work done so far, and the W block and V block are also getting developed?

Info replied on Monday, December 24, 2012 11:34 PM PST 
Road marking on the land is still the work done so far. The terrain of Phase 8 is very difficult and development work in Phase 8 is as slow or fast as in other DHA phases and one could easily make a guess of the timeline, which we under estimate quite frequently.

Habib replied on Monday, December 24, 2012 11:35 PM PST 
@ Hassan it looks DHA 8 will be developed where is it, No Significant earth Filling will be done, A very deep pit may be convaerted to a Deep park, Avergae Blocks may be about 8 feet deep than existing broadway road. and some Blocks may be 16 feet deep. Drainage will be done by sewage Pumps.
The Poof of above satement is that all 2 Kanal Houses on Main Bulivard are facing Back towards Broadway. This is stanage anomaly i have never seen before and looks that it is done to protect low laying houses's privacy,
Thanks to DHA 8 lovers for such a high price.

Sblock replied on Monday, December 24, 2012 11:39 PM PST 
surprisingly S and U block is being developed first. i thought it will be last one.

baba replied on Tuesday, December 25, 2012 12:28 AM PST 
I think 5 months and so much development only, let us wait for 2 more years and then it will be better.

Wasim replied on Tuesday, December 25, 2012 04:53 AM PST 
Thank you Brothers Hassan and Mujahid. I appreciate your efforts. It looks development work is continuous but at slow pace.
Thanks,

Babu Gentleman replied on Tuesday, December 25, 2012 04:58 AM PST 
Dear Sir,
These roads on which people are moving in their car and bike are these phase 8 roads If yes than which blocks are these, I mean are these developed now, or they are the part of broadway or any other phase already developed.Which bock is in good pace of development

MJ Khan replied on Tuesday, December 25, 2012 07:14 AM PST 
Mr. CMY Sahib, Good effort. Can you ask someone from your team to share also about progress in Divine Gardens? with some latest pictures of development work, update on commercial area, sports complex and handing over of D and E blocks. Thanks in advance.

visitor replied on Tuesday, December 25, 2012 05:36 PM PST 
Thanks a lot CMY & team,
Out of these pictures where is the W block and v block.I hope the development process gets going faster than as now.

visitor replied on Tuesday, December 25, 2012 05:40 PM PST 
Good efforts,
I think it is the X block U block and S block only remaining T, W, V, Y are not in the pictures, correct me if I am right.

Question replied on Tuesday, December 25, 2012 07:55 PM PST 
Dear Hassan sahib,
Does these pictures does include all the blocks of phase 8. and what is this NALA of water doing here, it is drainage or normal water flowing.or nehar, and which blocks are these , Is it possible to see pictures of some other blocks also . please

Friend replied on Wednesday, December 26, 2012 08:48 AM PST 
LRE Office was closed on Dec 25th Holiday. LRE staff Will answer Qs when office open

Fakher replied on Wednesday, December 26, 2012 04:50 PM PST 
@ Question, Not all block included, Y and S Blocks are missing.
That NALA was Khaira Distributory, is the extension of Distributory which run in front of State life and back of Phase-V, people of in between villages now throw their sewerage in it and started converting it in NALA.
@ Babu Gentleman, The road was constructed with the Ring Road project as side lane,also connecting Y block with X-Block, nothing to do with phase-VIII development.

Hasan replied on Wednesday, December 26, 2012 08:57 PM PST 
updates for clarification, sorry as pictures are not labled.
but following are the pictures with their blocks.
and water is running in front of S block, it is not a Nala, it is clean flowing water as i seen it.
0001, 0002 , 0004 middle of U and T
0003 v block middle of V and W
U block
0011 W-block
0013,0014 T block
S-block
Y-block
x-block

Visitor replied on Wednesday, December 26, 2012 10:47 PM PST 
I think still lot of work is to be done, development is somewhat slow, may be this will finish in 2015

Khan replied on Wednesday, December 26, 2012 11:00 PM PST 
You are right but we must be thank full to brother Hasan Abrar who gave us the latest status.

Ahmed replied on Thursday, December 27, 2012 07:15 PM PST 
It is great efforts by Mr Hassan, for providing all these pictures , which are much needful, We all should always appreciate , people like Mr hassan.Thanks a lot Mr Hassan.for people living abrad it is a great help.
(55780)
Monday, December 24, 2012 10:30 AM PST 
Comments closed
Wanted - Bahria Town Lahore - Awami Villa

AoA,
I want to buy Awami Villa in Lahore BT.
Facing park is preference.
Please mention your demands with house number, thanks.
(55778)
Monday, December 24, 2012 12:33 AM PST 
Comments closed
HTML code is disabled   Previous Page   Next Page