Sector D Bahria Town Lahore Status of Development

2 Days ago i visited Bahria Town Lahore. I have seen with my eyes the complete development of CC Block (10 Marla Plots) in Sector D. I am amazed as i visited 10 Days ago development work was carried out at normal pace. I was expecting that Bahria will take 1 month to complete the development of 10 Marla Plot in CC Block of Sector D. But Bahria Town shocked me they developed the 10 Marla Plots of CC Block of Sector D in very short period of 15 to 20 Days.
Bahria is also developing AA Block of Sector D but with medium pace.
Slow development work is also under process in BB Block of Sector D.
Bahria Rocks.

bahria jokes replied on Friday, November 4, 2011 09:52 PM PST 
lol what a joke, they can developed some thing (sector d) in just 10 days as witnessed by Shahzad.
and they could not developed some thing (phase 9) in years as witnessed by 1000s of allottees
bahria rocks or jokes

bahria going down replied on Friday, November 4, 2011 11:23 PM PST 
in Islamabad allotes of phase 8 still wandering here and there,,,,,,

visitor replied on Saturday, November 5, 2011 02:22 AM PST 
As far i know there are no 10 marla plots in sector D!

AG replied on Saturday, November 5, 2011 03:06 AM PST 
There are 10 marla plots in Sector D of BT Lhr.
What Mr. Shahzad has said is that he is amazed that Bahria has completed a work which he expacted them to do in one month. I don't find any thing wrong with that.
Regards

Shahzad replied on Saturday, November 5, 2011 06:49 AM PST 
@ Mr. Joke and Mr. Bahria going own: I believe in what my eyes see there in CC Block of Sector D of Bahria Town Lahore. I dont know what is happening in Phase 8 or Phase 9. I even dont know what is the payment plan and what was the bahria commitment about phase 8 and phase 9.
@ Mr. Visitor: have you seen the map of Bahria Town Sector D. There are 10 marla plots in cc block of sector d near GulMohar block of sector c.

Shahzad replied on Saturday, November 5, 2011 06:53 AM PST 
I am not any kind of bahria agent or promoter. I said truth. and may be Mr. Bahria Joke and Mr. Bahria going down are also saying truth. because i live in lahore and i have not visited phase 8 and 9.

kamal replied on Saturday, November 5, 2011 08:15 PM PST 
The best colony in Lahore is bahria i am stain in . its beret then DHA.
by any mean.

qasim replied on Tuesday, November 8, 2011 12:49 AM PST 
which is happening in 15days is it called development i dont believe ,may be another trap for investors.
(50285)
Friday, November 4, 2011 07:38 AM PST 
Comments closed
CONSTRUCTION GUIDE

Ad Type
City
For Sale
LAHORE
Respected Experts in construction feild
AOA
As i am constructing my home by myself on daily bases labor system , i have reached to flooring stage, i am not quit sure about the level of the floor(means water slop level) should be leveled either on kacha or on marble fixig stage.
like someone say on kacha and someone say on marble stage i am confused.
please advise me

boss-sk replied on Friday, November 4, 2011 11:27 PM PST 
i dont know much ,,,but the water slope really depends upon the amount of material used to fix tiles or marbles...
the thick layer of material under marbel will give height and thin layer will give depth......
lets wait for someone expert

AG replied on Saturday, November 5, 2011 07:35 PM PST 
Dear Shah Gee.
1. You must have used Rorri (broken bricks) mixed with cement morter to reach the floor level. Make sure it is compacted properly so that there will be no settlement in future.
2. Plinth/FFL (Finished floor level must have been marked on construction drawings of your house. If not pl. check the same with the concerned authorities.
3. I do not remember the specified slope for FFL (Top surface of marble/tiles etc). Check it with the concerned authorities or your mason should know it.For drain lines it is 1 in 80 ie if your drain line runs 80 ft it should be down by 1 ft on the other end.
4. Keeping in view the FFL, thickness of marble/ceramic tiles & required/recommended thickness of the base material/morter back fill & compact properly the mixture of Rorri & cement morter to a level less than the FFL by thickness of marble/tiles + recommended thickness of base material & just level it.
5. Tell the required slope of the Finished Floor to the masion. He should be able to maintain this while installing the marble/ceramic tiles.
Regards.

Saeed Chaudhry replied on Monday, November 7, 2011 03:09 AM PST 
Dear Shah Gee
- For wash rooms you may make water slope level at marble fixing stage
- There is NO NEED to make water slope level in bed rooms, drawing, dining, lounge etc., please make 100 % level floor as now a days never washed, whenever required 'wiper' is used

Shah Gee replied on Monday, November 7, 2011 11:27 AM PST 
Dear and respected AG & Saeed Chaudhry sahib
Thank you very much for your kind guide line, i will surely follow the instruction you gave me.
(50284)
Friday, November 4, 2011 05:53 AM PST 
Comments closed
LOOKING SPACE FOR RENT IN 1 KANAL OR 10 MARLA

Ad Type
City
Scheme
For Rent
LAHORE
ANY
LOOKING FOR OLD HOUSE OR SMALL PLAZA IN ANY DECENT AREA IN LAHORE FOR STORAGE OF GOODS AND SMALL SEMI OFFICE .LOCATION PREFERRED NEAR TO MAIN ROADS WHERE CONTAINERS CAN EASILY PASS. AND LOCATIONS WE ARE INTRESTED IN IS
GARDEN TOWN , FAISAL TOWN , GULBERG , MODEL TOWN,
JOHAR TOWN, SHADMAN, SHAHJAMAL, NEAR KANAL
(50283)
Friday, November 4, 2011 02:16 AM PST 
Comments closed

Today i saw an ad on geo tv that in Islamabad Sector E-16 new housing scheme is launched named as Roshan Pakistan Housing Scheme and plots are available on installment bassed.
I need advice from my respectable readers please give me your experience based out put, if i invest here for 15-18 year base so it can be fruitful.

AA replied on Friday, November 4, 2011 06:16 AM PST 
@Islamabad
Sir this is the private scheme, and they used the name of CDA to make it attractive and nothing more.
Regards

boss-sk replied on Friday, November 4, 2011 08:15 PM PST 
for 15-18 years investment ,,,it is best available option in Islamabad...this society is not using CDA name .. it is a CDA approved scheme that means it is a CDA sector,,,it is safe to invest here...go for it...it will give u a good return after 5-6 yrz...after 15-18 yrz it will be a well populated place and a developed sector of Islamabad Inshallah...it is right on GT road a plus point for this place
and am not biased Mr AA i dont have a plot there...:)

atiq replied on Saturday, November 5, 2011 04:14 AM PST 
E-16 location is best after G-15. Price is tooo low as compare to other sectors

Zulfiqar Ali replied on Saturday, November 5, 2011 05:01 AM PST 
Dear R.P Housing is not a new scheme it was launched few years back in 2006 or 2007. I visited this scheme in Feb 2011 although I have no plot in that scheme but the location is very good on G.T Road. Developement work is in final stages. In my opinion it is good place for safe investment

Isloo replied on Saturday, November 5, 2011 01:20 PM PST 
This is the same group that launched Soan Residencia near Soan River but it was never realized. Thay some projects complete in Hyderabad I think , but I am not sure about their compete project in Islamabad. RP was launched back in 2006 as Zulfiqar rightly said but I am not aware of the current status.

boss-sk replied on Saturday, November 5, 2011 09:19 PM PST 
for investment upto 15-18 yrz i think sectors like g-16,f-17,b-17,e-16,e-17,i-14,i-15,i-16 are the best options...
for 5-6 yrz investment go for sector g-15 and f-15.....

amer replied on Saturday, December 10, 2011 03:18 PM PST 
i have 2 plots in RP housing. I want to sell them both one is a corner plot. Demand is 16 lakh each. If interested please contact , or call or
(50282)
Friday, November 4, 2011 01:54 AM PST 
Comments closed

CMY Sb:
You mentioned that a 270 feet has been planned from GT Road to Ferozepur Road along Hudiara Drain and BRB. Can you please provide us further details on this news, as I am skeptic about it. Couple of years ago the proposed plan of ring road along Burki Road, then along BRB towards forozepur road was rejected by GHQ on security grounds as it can impede their defence strategy. If they didn't allow ring road to use that route along the lower edge of Phase 7 alongside BRB, i doubt they would have allowed this 270 feet road to go ahead as you mentioned.
Plus if you really want to connect GT Road with Motorway, they would plan a road from mehmood booti interchange to kala shaku interchange with a bridge on Ravi. Just wanted to see if it's a rumour or you have some further details on the project.
(50281)
Friday, November 4, 2011 01:18 AM PST 
Comments closed
DHA Valley

Atleast some newspapers are highlighing the whole DHA Valley saga.
Link: http://tribune.com.pk/story/286340/islamabad-valley-delay-in-dha-project-worries-allottees/

bhatti replied on Friday, November 4, 2011 10:18 PM PST 
any body wil advise about development progress of lily block. we are worried about its development. also confirm when possession will be given by dha valley of lily block

Zulfiqar Ali replied on Saturday, November 5, 2011 05:05 AM PST 
developement is very slow , About 25 kilometers far from Islamabad on Kallar Syedan Road ,Investors of this scheme will have to wait for next 10 years for their return. This is the reason that prices are rapidly falling down day by day .Not good for short term investment

jk replied on Sunday, November 6, 2011 01:02 AM PST 
the worst project I have ever seen of DHA and very disappointed they focussed oversea and below average people.
Even if this got developed in coming years after 10 years are so will reflect as a like Bahari colony made after 1971 war.

akhtar replied on Monday, November 7, 2011 09:24 PM PST 
What abaout EMAAR because they just DHA valley neibhors? just on 4 Km? why they will be Bahari coloni? why Rawat will not bahari coloni, PAEC housing coloni will not bhari coloni?

Rocky replied on Wednesday, November 9, 2011 02:32 AM PST 
Hahaha wel done akhtar lala
The project is adjacent to DHA phase 2 ext, It will never to b a behari colony.Its only the pressure game , yes its true taht project pace is slow, but it doesnot mean that its a totally sinked scheme.
Bhatti sb , lily block is at reasonable location , close to DHA homes , as DHA homes will be completed nd offer , the blocks adjacent to it will be ready for possession , but it may take another year.

bhatti replied on Thursday, November 10, 2011 08:52 PM PST 
Hi Rockey
thanks for your response. would you like to advise how much work is done at lily block. Are you visit the site of lily. is it beneficial after one year or suitable for residenc after one year.

Rocky replied on Friday, November 11, 2011 03:00 AM PST 
Bhatti sb , to be honest , till now the DHA homes are not ready and offered for occupation.so our time will come after that, when DHA Homes will be offer for the occupation ,the future of those blocks who are adjusant to the DHA homes will be good as they will lie in a close vacinityto DHA homes as compared to the rest blocks which are far away situated.
Development work is very very SLOW. lets c , it will be a great achievement if they offer us plot after 1 year , butit will nt a a suitable place to live even after 2 /3 years.
thanks

ndi replied on Saturday, November 12, 2011 08:44 AM PST 
Guys any idea about DHA HOMES? r they ready ? and status of iris block ?

Shoeb replied on Sunday, November 13, 2011 05:51 AM PST 
Dear All,
It will be appreciated if any one update us regarding "Iris" block, can i get the possession after 25 years, because i planed to stay their after my retirement :)). Just kidding, I am worried about my plot located at Iris block, please any one update me.

Engineer replied on Tuesday, November 15, 2011 03:02 AM PST 
Dear Ndi and shoeb
The future of IRIS block is unfortunate not very good, as if u see the map provided by DHA VALLEY, its current location is in extreme eastern side of valley , i am not saying that its totaly flop area, but it will take really a long time to be developed, as currently the development works is being initiated from the western side near DHA phase 2 ext.
any way wait and if can can deposit the total amount its good as there is a strong chance taht DHA managemnt will re ballott the plots among those mebers who have completed their dues. so in taht case u may be able to get a plot in the developed sector.
rest u ppl may also gather info from other sources.
thanks

Sleepless replied on Tuesday, November 15, 2011 10:44 PM PST 
Thanks @ Rocky & Engineer for your informative replies.
Please advise if the deferred installment should be paid or should I wait for go ahead from DHAI. Further, what is the status of Daisy block?

bhatti replied on Tuesday, November 15, 2011 10:54 PM PST 
Hi Engineer
would you like to advise status of Lily block and what about its development works
(50280)
Friday, November 4, 2011 12:39 AM PST 
Comments closed

Dear Friends,
Any update the road under construction, pass through valencia, dha rahber, khayaban-e-amin, fazaia and connects to Raiwind Road road at ADDA PLOT. How much work is done, at Fazaia Scheme area.
(50279)
Friday, November 4, 2011 12:12 AM PST 
Comments closed
DHA-9 Lahore

Dear CMY Bhai :flg
Few days back you informed the forum that DHA is developing DHA-9 Block A,B,C,and D prior to Phase 8.
Would you please inform percentage wise what is the covered area for said blocks and what percentage will remain and included in balott.
You are also requested to mark these blocks ABC&D on phase-9 map and paste it here for our review the exect remaining area's location of DHA-9 .
You have advised and suggested many time that DHA-9 is safest and most rewarding investment as the prices are still very reasonable and has not come to the level of surrounding phases and societies
What do you thing what fear is running in buyers mind and why they are reluctent :h
Thank you very much for your time and praying for your health and prosperity :) :) :)

Mrlahori replied on Friday, November 4, 2011 07:22 PM PST 
Salam, As far as i know, I think DHA 9 A,B,C,D blocks are part of DHA Town allocated to army families and D block was in recent ballot. These blocks ( DHA TOWN ) is in the start of DHA 9 near Askari 11, but iam not sure about the location.
I would also like to know if the construction is going on in DHA 9 and DHA Town (ABCD) . and whats happening as i am overseas and have no idea.

Mustafa replied on Saturday, November 5, 2011 08:37 AM PST 
Dear Javaid,
DHA Town Phase 9 map is available on DHA official website and here in the maps section.
The total covered area is small and about 4,800 kanals.
DHA has build the Director Development Phase 9 office on the site and development work is expected to pick speed soon.
(50278)
Thursday, November 3, 2011 07:23 PM PST 
Comments closed
Selling of Property

Ad Type
City
Scheme
Phase
Block
Size
Demand(Rs)
Features
For Sale
Lahore
State Life Society
1
A,D
1 K &5 M
12 & 4.5 M
Owner Built Houses
I have two houses as described above.
One K house is abt 2 yeras Old where as 5 M House is Brand new. Both have definite high quality construction . I want to sell them due to some personal reasons. First good offer , these will be sold. Direct deal will be appreciated

Saqib replied on Thursday, November 3, 2011 10:32 PM PST 
Brig sahib how is your control shed business going?

medoctormallick replied on Friday, November 4, 2011 06:49 AM PST 
Dear Sir: Kindly let me know your final demand and the exact location of this house built on five marlas.
Regards,