Dear Friends, :flg
Please help me to decide I wanted to construct my home in Islamabad and when I say Islamabad it is proper Islamabad and not in surrounding. Emoticon :t:
What you will recommend and suggest rate the following considering which sector will have the BEST OUT LOOK :h
Cost and time frame is not an issue.:) :) :) :)
1. D-12
2. G-13
3. G-14
4. E-11
5. F-11
6. E-12
7. I-8
or demolish and construct new house in a developed sectors. Emoticon :banana:

asad replied on Sunday, January 10, 2010 05:04 AM PST 
why comparing f-11 with other rubbish. trying to tell us that D-12 is in the loop. again another funny post

Aamir replied on Sunday, January 10, 2010 06:55 AM PST 
If cost doesn't matter then F-11.
Irrespective of cost and time frame, D-12 is the option.

Abdul replied on Sunday, January 10, 2010 07:10 AM PST 
Dear Asad
Your comments reflects you missed to invest in sector D-12
I believe 1st sector of each series i.e. F-6, E-7 and D-12 closer to Margala Hills are the best and tasteful to live .

Khayyam Shahzad replied on Sunday, January 10, 2010 07:58 AM PST 
Since you said cost and time are not an issue my recommendations are in the following order:
1. D-12: You can build there now though it will take a few years before it is fully populated. Electric and Gas connections can take upto a year as well. I think since this is a brand new area, and has close proximity to the Margala hills, this area has edge over any older sector.
2. F-11: I prefer this area over newer E-11 since this is CDA managed.
3. E-11: Relatively new area but not all sub-sectors are good. Some have water/sewage type issues. Consult with some knowledgeable person
E-12 sector can take a lot longer to develop as D-12 did therefore avoid unless you are ok to wait 20 years. I am not familiar with I8, but G series are ok as well. Since you mentioned money is not an issue stick to the above if you can.

asad replied on Sunday, January 10, 2010 02:19 PM PST 
@Abdul
plz don't look at my comments if they don't taste good to you. Truth hurts my friend.
By the way this poor champ Abu owns a plot in E-12 and thats why he said time is not an issue. D-12 is good place but not yet ready until 2012 above.

Zubair replied on Monday, January 11, 2010 04:26 AM PST 
What is the price range in D-12 for 1 Kanal and 10 Marla plots?

asad replied on Monday, January 11, 2010 10:57 AM PST 
my father made the first home in sector f-6 and malik riaz was the constructor who is now owner of bahria town and it still has the terrace. people like to make fort type pigeon cabin for rental income.

Zubair replied on Monday, January 11, 2010 04:03 PM PST 
Waseem Malik, I appreciate your detailed comments. I'm still looking for the price range of 1 Kanal or 10 Marla plot in D-12. I'm just looking for range.

SAhmed replied on Monday, January 11, 2010 06:43 PM PST 
@ Zubair, here r the rates of D-12
50x90 from 110 lacs
40x80 from 75 lacs
35x70 from 55 lacs
cheapest is D-12/1 and rates go up 2-5 lacs for each sub-sector incrementally.
(41447)
Sunday, January 10, 2010 02:22 AM PST 
Comments closed
DHA ISLAMABAD GOLDCREST & WORLD TRADE CENTER

Ad Type
City
Scheme
Cur. Rate
ISLAMABAD
ISLAMABAD
DHA GOLDCREST & WORLD TRADE CENTER IN DHA PHASE-2
DHA annonced the 15 tower of 20 to 37 stories including Residential Apartments in DHA phase-2. The Alhuair Giga from UAE is client, IJM & Bina Goodears was the contractors from Malaysia. After one year the left the work and went to their home because DHA did not payed them money. Now Two uncomplete towers with 8 stories can be seen from G.T. Road also. Now no company is willing to complete this project.
(41446)
Sunday, January 10, 2010 01:25 AM PST 
Comments closed
DHA ISLAMABAD FACTS

Ad Type
City
Scheme
Cur. Rate
ISLAMABAD
ISLAMABAD
The Information i have given below to all my Pakistani brothers is the fact like Shining Sun. There should be no confusion in your mind. These project are not am Underground Nuclear Reactors which can't be seen. These project site are well known and spread over thousand of kanal area's.
If any body want to confirm my information,
he can go to those projects and the site offices of the contractor (Habib Rafiq) at different projcts and ask them about the work in progress. and then tell in this forum that i am right or wrong. You can also check in Google earth. Google has uptated the pictures of that areas also.

SALEEM AWAN replied on Sunday, January 10, 2010 02:14 AM PST 
DHA GOLDCREST & WORLD TRADE CENTER IN DHA PHASE-2
DHA annonced the 15 tower of 20 to 37 stories including Residential Apartments in DHA phase-2. The Alhuair Giga from UAE is client, IJM & Bina Goodears was the contractors from Malaysia. After one year the left the work and went to their home because DHA did not payed them money. Now Two uncomplete towers with 8 stories can be seen from G.T. Road also. Now no company is willing to complete this project.

Wellwisher replied on Sunday, January 10, 2010 02:41 AM PST 
Saleem Awan Sahib, I think Alghurair Giga purchased land from DHA for their project and DHA itself has nothing to do with this project. They had their own Marketing + booking office. Anyone else who have knowledge about this project may comment on it. Regards to all

Saleem Awan replied on Sunday, January 10, 2010 02:49 AM PST 
but what about those people who spent their all money for appartments believing on DHA. It is DHA responsiblility to complete it.

Asad replied on Sunday, January 10, 2010 02:52 AM PST 
I,have checked as far as Phase 2 Extention is concerned Mr Saleem is correct & there is no or neglible work being done, any body can go & see .All lies by so called DHAI spokesman .At this pace it would take 10 to 15 years to develop,even then I, am not sure if it would get developed in 15 years, I, have checked ,no map of DHAI Phase 2 Extension is final .4 sectors God knows where they exist ,yes on the moon.Brothers be careful to invest see for your self
(41445)
Sunday, January 10, 2010 12:28 AM PST 
Comments closed
DHA ISLAMABAD LATEST SATUATION OF NEWLY LAUNCHED PROJECTS

Ad Type
City
Scheme
For Sale
ISLAMABAD
DHA SCHEMES
Now come to the DHA ISLAMABAD Project which are newly launched and see their progress.
DHA EXPRESS WAY
this is approach road for DHA phase-2 extension & Valley.
Mr. imran said "DHA Expressway (8.2 km, 6 lanes) are near to completion, with some work remaining on bridges/crossways."
if one go to site he can see that earthwork at different patches is started. road is only carpeted at start about 400 meters. bridges and culverts are to be prepared. It is started 8 month before and still minimum one year is required to finish the work.
DHA DHA OVERSEAS Project
It is satuated near Sawan Bridge. It is between Kahota Road and Ex-Commoners town. It is started 4 years ago but Only the gate and 500 Meter main entrance road is constructed. And marketing office is prepared.
This is a separate project from Valley and Phase-2 extension. So, don't mix it with these projects. Although DHA phase-2 Extension and Valley has their Overseas Sector but i am not discussing it here.
Mr. imran did't write about this project. Because he can't defend it. This block is introdused only to trap the overseas pakistani and to get dollers.
DHA PHASE-2 EXTENSION
DHA phase-2 extension has more than 70 thousand kanals area. Only one Road of 500 meter is in process which is linked with Instustrial Road. This road is named "Industrial Link Road" and still not carpetted.
Mr. imran said "Development work is under process. The earlier the sector (out of 4) the sooner the possession is expected."
He is giving false hopes of possessions. Just to Silent the people and stop their angreeness. Can DHA give possesion on Raw land like Jungle while there is no road prepared. If DHA start one sector of this project today with full pace then possession is possible after 4 years. then thick about other 3 sectors yourself. While DHA is also failed to made the New Replanned Map of this project in which they divided it in 4 sectors.
DHA VALLEY
It is divided into 20 sectors and it has plots more than one lak according to the issued map. It has more than one lak kanal area. No work is in progress in any sector. The work is in progress in a land called DHA Homes along expressway.
People think it DHA Valley. Mr. imran put DHA Homes in DHA Valley and shows the progress in DHA Valley.
While DHA Homes is a seprate scheme and Valley is seperate scheme.
Mr. Imran! if you dont have correct information than please don't confuse people.
DHA HOMES
The small peace of one thousand kanal area earthwork is in progress in which DHA want to build houses.
DHA Valley, DHA Phase-2 Extension and DHA Homes will be deveoped by Joint Venture of Habib Rafiq Private Limmited, Bahria Town and DHA. Habib rafiq is devloper, Bahria Town is financer and DHA is Supervisor or Client. But You see ne Year progress then It will take more than 10 years to complete.
Bahria town has his Own priorities. If Malik riaz stop spending money then what will DHA do? because DHA have no money to spend.
Mr. Imran did't deny in his post no. 45888 about the fact i wrote in my previous post no. 45832 but he said the same things i said before. He just added some hopefull senctences in each project detail that possession will soon be given.

SALEEM AWAN replied on Sunday, January 10, 2010 07:11 AM PST 
No other Contractor company is willing to work with DHA Islamabad. EMMAR (UAE) left the job. IJM, Bina Goodears from malysia left teir jobs also.
Only Habib rafiq is working on development of DHA projects. Their money is also blocked in DHA projects and company is near to defalut.HRL money has also blocked in DHA projects and work is stopped at all projects expect DHA Expressway and DHA Homes which is financed by Bahria Town. I am loyal to DHA but in know the exact situation and i don't want that DHA should loot the Hard earned money of Pakistani People.
People should make Case in Courts about completion of these projects as well as about the Additional development charges charged to them with time by time.
My Suggestions to DHA official.
1. DHA should spent money on the projects for which they have collected the money from plot members.
2. Work pace should be kept fast.
3. Instate of Huge project like DHA Valley & Phase-2 Extension of 1.5 laks kanal area, they should launch project having only 10 thousand to 15000 kanal area like Phase-2 and Ex-Commoners town. They should build smaller portion and give possessions and then start new portion rather they Launch those huge area project more than the area of Islamabad which will never be completed in time and will take decays.
The 10 years is minimum for those projects which i told. Looking to current pace of work it can take 20 to 30 years estimated.
4. At least Maps of the project should be finalized before launch of any project.
5. The file system should be eliminated. Only plot should be sold. The file means no plot.
6. DHA should stop acquiring the land forcedly from people to build the scheme.
7. Every Project Time period should be given before start and the time period should be strictly monitored by them.

Riaz replied on Tuesday, August 10, 2010 03:17 AM PST 
Ref DHA Valley Phase II Extension, I will sue them and let them reply in the court.

Riaz replied on Tuesday, August 10, 2010 03:23 AM PST 
Ref DHA Valley Phase II Extension, I will sue them and let them reply in the court.

khalid replied on Monday, December 27, 2010 04:35 AM PST 
DHA Valley is still in the heaven and nothing on the spot. It will complete in the year 2090.

Aslam replied on Wednesday, August 17, 2011 07:37 PM PST 
What about DHA Homes Islamabad. When it will be complete??..

Asif replied on Wednesday, September 14, 2011 06:09 PM PST 
what about DHA Valley Islamaba. when it will be complete/?
(41444)
Sunday, January 10, 2010 12:18 AM PST 
Comments closed
DHA ISLAMABAD PROJECTS LATEST SATUATION

Here I will inform pakistani brothers, investers and plot members of DHA about the latest progress and development of DHA islamabad project one by one.
DHA PHASE-1 EXT.
Many brother asked about DHA Phase-1 progress.
It is launched in 2005. It one kanal file price dropped from 36 lak ruppes to 6 laks. the construction of interchange at entrance point of phase-1 main road is stopped due to lake of money.
The designer of this Project is MINEHORT. But they withdraw from their job due to payment stopped by DHA.
and i will give u a new information about this project which will shock people.
the only available area in this scheme "Sector B and C" is separated this scheme and added in DHA PHASE-1. and it plot will be sold as DHA PHASE-1 again.Because Phase-1 plot prices are more higher than Phase-1 Extension. So, they will sell the same land two times. the members of DHA PHASE-1 EXTENSION can not convert their plot h this area and they have to wait for long time because remaining area of DHA Phase-1 Extension is hold and not yet purchased.
Mr. Imran said the same thing which i said again & again in many posts. He said "DHA is planning the remapping of sectors to pace-up the work. Due to current market crunch exact date of possession cannot given but it is under high priority of DHA."
I ask him if this project is DHA priority then why they are not starting the sectors road works which is stopped from 4 years and still no hope of starting the work.
DHA PHASE-1
This project is completed many years ago. is was developed by FWO. But the work quality was very poor. So, DHA given a new contract to NLC to repair the scheme. also they charged the plot members additional development charges which is unjustice because the poor work quanlity of FWO should be monitored by DHA and they should not pay FWO for the bad work. But FWO is also from army so, they have not fined them but charged additional development charges to plot members. The corruption was also involved between DHA and FWO.
DHA PHASE-2
This project was awarded to HABIB RAFIQ PRIVATE LTD IN 2001 and completed. It has 8 sectors A~H. The houses are built. Possession is available but it is not fully developed as said by mr. Imran. Part of Sector-D in Phase-2 is hold. A new sector-K is also carpeted and near to completion.
if any brother has plot in sector-D Hold area or DHA is excusing about possesion of his plot in PHASE-2 then he should demand to transger the plot into Sector-K which is ready for possesion. DHA has done this for some members.
DHA PHASE-2 EX-COMMONERS TOWN
it tooks 4 years and still under construction. Dha annouced the possesion in commoners town in march 2009 but failed to do it. Work speed in very slow and some time DHA totaly stop the work due to lake of money.

Curious replied on Sunday, January 10, 2010 01:19 AM PST 
Mr Saleem Awan. With ref to shifting of Sector B & C of Ph I Ext into Ph I, what will be the position of :-
1. Members already having plots in Sec B & C
2. Are these sectors closer to Ph 1
3. Is area of these two sectors already developed or yet to be developed.
4. Approach to these sectors will be through interchange or some other way.
5. What will be the benefit to DHA on doing so.
Thanks in advance

SALEEM AWAN replied on Sunday, January 10, 2010 02:00 AM PST 
I told you befor but i think you did't understand.
i will give the answer one by one.
1. Member already having plot in Sector B & C will be shifted in another place but there is no purchased land owned by DHA there. the only purchased land of sec-b & c is inclueded in DHA Phase-1 and plot will be sold with higher rates than Extension.
2. These are closer to phase-1 about 5 km.
3. This area is replaced and but no work is done there. only some earthwork has been done.
4. Approach to these sectors will be through interchange.
5. DHA has already sold the plots of this area in Extension. now they will again annouce it in phase-1 and will sell these plot with new map and will get even more money because phase-1 plots are higher than other dha islamabad schemes.

Curious replied on Sunday, January 10, 2010 02:46 AM PST 
Saleem Awan Sahib many thanks for sharing knowledge.

Adeel replied on Sunday, January 10, 2010 06:18 AM PST 
Brother Saleem! Thanks for your courageous effort. Situation on ground is quite in line with your analysis specially both I & II Extentions. There appears to be deep crisis for which DHAI managemnent has no clue on sorting that out. Some thing must happen immediately on ground and members should get their due right against their payments. Otherwise this could easily continue for next 10-20 years in same state.
Could any one suggest on what should be done to force DHAI mend their affairs? Should members start writing applications etc, to get justice?

Asif Syed replied on Saturday, January 30, 2010 09:48 AM PST 
Dear Saleem Sb,
I am told by DHA that my plot in Ph 1 Ext A-Block is now part of Askari 14. They are annoucing in a few months (this was in September 2009) about the new map and location of A-Block. Can you please give me some visibility on this? I bought this plot for all what I had.

aamir replied on Saturday, June 5, 2010 10:26 AM PST 
DHA islamabad are thieves...............they are fleecing hard earned money of people..............phsse 1 extension was started in 2005.......a relative of mine has paid everything ..........total of 11 lacs........but the plot exists only in papers...DHA is no where even near to start the project..........chief justice of pakistan should take notice of dha money grabbing techniques

kamran replied on Monday, June 7, 2010 11:22 PM PST 
my plot in DHA- 2 sector D is hold and no further plot is given to me. can any one guide me what to do ? i mean what is the highest authority whom i should contact for this !

waqar replied on Sunday, September 5, 2010 11:34 PM PST 
DHA was announced as one of the top 10 corrupt organziation in the Pakistan, by amnesty international. I have also plots in Phase 1 Ext and now i am suffering. I relied on army that atleast they will be honest, but like our martial law dictatos, DHA is also part of corruption.
They have money for new sectors, but atleast they should full fill there old commitments. SHAME ON DHA. Magar Sharm tug ko nahe ate
(41443)
Saturday, January 9, 2010 10:47 PM PST 
Comments closed
(41442)
Saturday, January 9, 2010 10:28 PM PST 
Comments closed
Plots for Sale in Bahria Town Islamabad

Ad Type
City
Scheme
Phase
Block
Plot
Size
Road
Demand(Rs)
Features
For Sale
Rawalpindi/Islamabad
DHA
2
E
63
1 Kanal
1
58 Lac
Map Passed, Foundations are built
For Sale
Rawalpindi/Islamabad
DHA
1
E
5
1 Kanal
8
43 Lac
-
For Sale
Rawalpindi/Islamabad
DHA
2
A
27
1 Kanal
11
43 Lac
-
For Sale
Rawalpindi/Islamabad
DHA
2
B
1
1 Kanal
15 A
44 Lac
-
============================
Multiple Ads Not Allowed, 2nd Deleted.
============================

imran replied on Monday, January 11, 2010 07:28 PM PST 
Iam intrested in the plot in E sect contact
(41441)
Saturday, January 9, 2010 10:12 PM PST 
Comments closed
Home for Sale in Bahria Phase 6

I have a 10 Marla Home in Bahria Town Rawalpindi, Phase 6. It is a double story home with 4 bed rooms, drawing, dining, attached baths etc. House is available in 87 Lac.
(41440)
Saturday, January 9, 2010 10:03 PM PST 
Comments closed
Lahore Real Estate Market Pulse as of 01.00 Pm Jan 09, 2010

Plots File Prices Market Pulse by Lahore Real Estate
DHA Lahore Phase 5 Extension Allocation File: Buyer(s) at 21.40 Sellers(s) at 21.50 lacs
DHA Lahore Phase 6 Allocation File 1 kanal Sellers at 30.50 lacs
DHA Lahore Phase 6 Affidavit 10 Marla File Sellers at 22.00 lacs
DHA Lahore Phase 7 Affidavit File Sellers at 19.00 lacs.
DHA Lahore Phase 8 Allocation File Buyer(s) at 34.60 Lacs Seller(s) at 34.75 Lacs.
Parkview-DHA-8 Lahore 1 kanal allocation file Buyer(s) at 24.00 Lacs Seller(s) at 24.10 Lacs
Parkview-DHA-8 10 Marla allocation Buyer(s) at 17.15 Lacs Seller(s)at 17.10 Lacs
DHA Lahore Phase 9/10 Allocation File Buyer(s) at 13.55 Lacs Seller(s) at 13.60 Lacs
DHA Lahore Phase 9/10 Affidavit File Available at 14.00 Lacs
DHA Islamabad Phase 2 extension lowest price certificate file is available at 8.10 to 8.20 Lacs
DHA Valley Islamabad open files 5 marla 5 paid sells at loss of = 61000 to 65000
DHA Valley Islamabad open files 8 marla 5 paid sells at loss of = 84000 to 92000
Bahria Town Lahore Sector C 10 marla 2 paid buyers at 1.99 sellers at 2.01 lacs
Bahria Town Lahore Sector C 10 marla 3 paid buyers at 2.74 sellers at 2.76 lacs
Phase 9 Bahria Town Rawalpindi Pakistan 10 marla 2 paid buyers at 1.40 sellers at 1.43 lacs
Phase 9 Bahria Town Rawalpindi Pakistan 10 marla 3 paid buyers at 1.84 sellers at 1.87 lacs
Bahria Town Phase 8 without development charges General blocks other than A B D C 3.05 to 3.28 lacs for 10 marla
Bahria Town Phase 8 with development charges cleared in blocks A B D C 8.00 to 9.35 lacs for 10 marla
**********************************
***For More Detailed Prices Schemes Click Here***
***For Past Prices History Click Here***
**********************************
Rates you can trust are provided by:
Ch. Mujahid Yasin ( CMY )
Lahore Real Estate
Registered/Authorized Dealer (DHA, EMAAR, Bahria Town, Urban Developers, etc.)
042-35692420 to 23 0r 042-111-111-040 in Office Hours Only
Mobile +92-322-400-9967
eMail: LahoreRealEstate@Gmail.Com
http://www.LahoreRealEstate.com
(41439)
Saturday, January 9, 2010 09:13 PM PST 
Comments closed
DHA ISLAMABAD LATEST SATUATION

Reference to property discussion no’s 45888 AT 5 JAN-2010.
Here I will give you latest information and new progress about DHA Islamabad projects and give the reply of Mr. imran comments about those project.
Actualy Mr imran did not proof me wrong but he accepted the fact i already told about all DHA projects in my post no. 45832.
But first of all, i will explain abot Mr. Imran Claim.
MR. IMRAN claim himself "The PROJECT MANAGER of DHA Valley". While project manager of DHA VALLEY is "Mr. Shahzad Iqbal". and Deputy Project Manager name is "Muhammad Usman". Both are from Habib Raifiq Private Limittid. This project is joint Venture of DHA, Bahria Town and Habib Rafiq. Habib Rafiq is developer, Bahira town is financer and DHA is Supervising as Client. If any body confused with Mr. imran claims and want to know about the Real Project manager then go to Rawat instrial State through Industrial road and stop at Sui Gas Station. Here is the Site office of DHA Valley. anybody can meet with the Project Manager and can certify my words. Mr. Imran can be employee of DHA Islamabad who is directed to reply my post and to satisfy the investers and members of DHA by giving false hopes and to keep people silent because they can create problems for DHA by Supreme Court and High court.

Visitor replied on Saturday, January 9, 2010 10:03 PM PST 
Saleem Awan Sahib, please throw some light on Phase I Ext. Understand that nothing (except interchange) has done so far but please do share what the management has planned or planning for the development of Phase I Ext. Regards

MFB replied on Saturday, January 9, 2010 11:17 PM PST 
AOA Saleem
I already have a plot in Sector E, DHAI Phase II(Ex Commoners Town). Do you think this is a good investment if I purchase another plot? if so which Sector(BC,CC, DC, EC) do you suggest?
Thank you for all your efforts in answering the questions.
Regards

SALEEM AWAN replied on Sunday, January 10, 2010 01:15 AM PST 
Mr. MFB
you should purchase plot in Sector-B which is almost developed.

MFB replied on Sunday, January 10, 2010 06:02 PM PST 
AOA Saleem
Are there any 4 marla commercial plots for sale in DHAI Ph II-Sector BC,CC, DC & EC(Ex-Commoners Town)? Do you know the price?
Secondly, I am based in Canada & am not aware of the actual ground situation, can we start construction hopefully within this yr in Sector EC.
Thanks again for all your efforts in answering my questions.
Regards

Rizwan replied on Friday, February 19, 2010 05:17 AM PST 
Saleem Sahib!
i have a shop at undergroung level in sec 2 at in Islamabad DHA "shop a shop" plaza .I have paid 20,00000.I am in toronto and want to sell it. Do you have any rough idea of sale price there.We will be geting pocession around mid of 2010.I will appreciate your responce. Thanks

ashiq hussain replied on Sunday, June 13, 2010 06:17 AM PST 
reg no:dyi-039155
plot no:107
want to know my status