TO CALCULATE CONSTRUCTION COST FOE ALL
Construction Cost Estimate
Disclaimer: These etes are not necessarily stimaendorsed by Lahore Real Estate
SN Material Requirement Rate / Unit (in Rs.) 5 Marla (1500sqft) 7 Marla (2000 Sqft)
Quantity Cost Quantity Cost
1 Bricks Bricks 20 / sq ft 2400/ Thousand 30,000 72,000 40,000 96,000
2 Sand Sand 1 Truck/ 167 Sq. ft 1600 /Truck (350 cub ft) 9 14,,162
3 Crush Crush 0.6 Cubic feet / sq ft 20/ Cubic ft 900 18,000 1,200 24,000
4 Steel Steel 1.35 kg / sq ft 30/ Kg 2,025 60,750 2,700 81,000
5 Cement Cement 1 Bag / 3.07 sq ft 230/ Bag 489 112,,837
6 Mud Mud 1 Trolley / 87 sq ft 500/ Trolley 17 8,,494
7 Tiles for Roof Tiles on roof 2500 for 5 Marla; 3000 for 7 Marla and 5000 for 10 Marla House 1800 /Thousand 3,000 5,400 5,000 9,000
8 Tiles for Front Tiles (for front) 52.02 Sq m for 5 Marla; 59.83 Sq m for 7 Marla; & 65.03 Sqm for 10 Marla 425/ Sq m 120 51,,250
9 Grills Grills 160 sq ft for 5 Marla; 160 Sq ft for 7 Marla and 280 sq ft for 10 Marla 150/ Sq ft 160 24,,000
10 Glass Glass 140 sq ft for 5 Marla; 140 sq ft for 7 Marla and 250 sq ft for 10 Marla 30/ Sq ft 150 4,,500
11 Lamination Lamination 12 sheets for 5 Marla House; 16 Sheets for 7 Marla and 18 for 10 Marla 1025/ Sheet 16 16,,500
12 ChipBoard Chip Board 66 sheets for 5 Marla House; 74 Sheets for 7 Marla and 74 sheets for 10 Marla 700/ Sheet 66 46,,000
13 Ply Ply 12 sheets for 5 Marla House; 17 Sheets for 7 Marla and 19 sheets for 10 Marla House 210/ Sheet 15 3,150 20 4,200
14 Wood Wood 242 Sq ft for 5 Marla; 296 Sq ft for 7 Marla and 296 Sq ft for 10 Marla House 15/ Sq Ft 242 3,,800
15 Gate 150 /Sq ft 150 22,,500
16 Flooring For the whole covered area 35/ Sq ft 1,500 52,500 2,000 70,000
17 Bathrooms flooring for 4 bathrooms 450/ Sq m 36 16,,200
18 Doors (16) 80/ Sq ft 336 26,,880
19 Civil Work 125 187,,000
20 Elecrification 15 22,,500
21 Sanitation 15 22,,500
22 Paint 20 30,,000
23 Carpenter 35,000 50,000
24 Glass Work 10 15,,000
Total Cost 870,980 1,147,323
5 Marla 7 Marla
Material 870,980 1,147,323
Labour @ 300 per sqft 450,000 600,000
Land 1,500,000 2,100,000
Miscellaneous 200,000 200,000
Total 3,020,980 4,047,323
Per Sqr Feet Cost 881 874
(Labour+Material)