Builder replied on Sunday, October 26, 2014 09:15 AM Labor Rate: Covered area: 200 to 250 per sft Basement: 310 to 350 per sft Masonry work:25/sft Plaster: 15/sft Tiles: 25/sft Marble: 20/sft PCC floor before tile/marble: 20/sft Excavation with machine:2/Cft, free if you do not need excavated soil. |
Dukandar replied on Sunday, October 26, 2014 07:40 PM Material: Bricks: 7500/1000 Pattoki Sand Chanab: 25/Cft Sand Ravi: 10/Cft Ask for Mehmood Booti area Crush Sargodha: 55/cft 50/cft if you directly from crusher Steel: 88,000/ton, Carrige, loading/unloading 2000/ton |
Habib replied on Sunday, October 26, 2014 07:40 PM Dear Builder what is for RCC or RBC per square Feet Including shutering filling Steel Fixing etc |
Iqbal replied on Monday, October 27, 2014 11:38 AM Very knowable thread emerging. I want to ask i m building a house of 5300 sq ft. (Triple story on 17 marlas) in how budget i will be done with grey structure and what will be the total cost per sq ft which includes everything (finished)? |
Zahid replied on Wednesday, October 29, 2014 10:48 AM cement rate? |
Aam replied on Tuesday, November 11, 2014 06:08 AM Cement 503 to 510 per bag |