10 Marla Constructin R
Work Details Rate Total Cost Remarks
Labour contractor charges Ā 3,90,000 Your structure will be completed in 60 days
Ghasso Ā 50,000.00 Earth filling
Steel {sarya} per ton ,000.00 "Model steel" Deformed 10 ton includes basement
Cement 334 272, bags
crush Margalla 46/sft 1,20,000 3 trucks Margalla crush
sand 8/sft 60, trolleys
Bricks 5.3 424,,000 bricks
Anti-termite Ā 15,th generation formula
Electrician Ā 20,000.00 Ā
Electric items Ā 170,000.00 Fast cables,Fans,lights,conduting,switches
Plumber Ā 20,000.00 Ā
Sanitary items Ā 89,057.00 Turkish set
Sanitary fittings Ā 82,820.00 Porta,Fasial
Bath tub Ā 6,500.00 Ā
Shower cabin Ā 15,000.00 Ā
Aluminum Ā 150,000.00 Ā
Grills Ā 40,000.00 Ā
Gate Ā 40,000.00 Ā
Terrace railing Ā 30,500.00 Ā
Spiral stairs till roof outside Ā 28,000.00 Ā
Inside SS railing Ā 25,000.00 Ā
Marble cost Botisena Ā 88,790.00 Ā
Flooring Tiles cost 24 inch size 950 24,st floor sitting, kitchen, patio -All imported
Bath tiles 704/ 81,800.00 Master "A" Class from show room
meter
Grinding Ā 26,000.00 Ā
Roof insulation tiles 22 22,000.00 Thermopore 2" thick
False ceiling Ā 34,000.00 Ā
Painter Ā 34,732.00 Ā
Paint/material Ā 71,169.00 ICI factory price
Kitchen Marble slabs Ā 10,000.00 Ā
Kitchen wall tiles Ā 7,000.00 Ā
Main door āBlack Goldā Marble Slabs/steps Ā 6,000.00 Ā
Wooden flooring 8mm Ā 25,000.00 Malaysian imported
Carpenter labour charges Ā 72,725.00 Ā
Wooden doors material Ā 79,750.00 Ā
Kitchen wood material Ā 35,680.00 Ā
Elmira wood material Ā 115,910.00 Ā
Door locks Ā 32,290.00 Tower bolts, stoppers, folding handle wire gauge, pipe rods etc
Glass fixer Ā 13,000.00 Ā
Truck/Suzuki rent Ā 10,000.00 For Bath tiles loading, marble tiles, sanitary fittings like commode etc
Bath mirrors Ā 10,000.00 Large glass
Fiber glass Ā 28,000.00 for 2 open roof sections on 1st floor
Bhal/plants Ā 10,000.00 Ā
Graphiato Ā 25,000.00 For exterior paint
contractor charges Ā 600,000.00 House is ready in 6 months Sub totalRs 37,17,17 commencing from S.No 16
Basement cement Ā 66, cement bags in basement size 15'x15' only cement included.
Basement labour charges Ā 70,000.00 To be paid to labour contractor for work
Earthing Ā 5,000.00 Done at the end for safety
3,792,717.00