A class Construction Rates

Image attached to a Lahore Real Estate post about: On the request of many friends the enclosed tentative estimates are for 1kanal A class construction. Variation +/-5% may occur on…
On the request of many friends the enclosed tentative estimates are for 1kanal A class construction.
Variation +/-5% may occur on case-to-case basis.

Observer replied on Monday, April 25, 2011 12:39 AM PST 
Thank you brother. But pls mention if these rates are current, and for which area and by which type of contractor?

Dilbar replied on Monday, April 25, 2011 04:03 AM PST 
For a 20 marla (1 Kanal)home the cost is 1 cror 34 lacs 50 thousands ... I beg your pardon but I think it is high and does not seem reasonable.
Some other experts should comment on these rates.

ks replied on Monday, April 25, 2011 05:03 AM PST 
Rates exactly match closely for what I am paying.

Asif replied on Monday, April 25, 2011 06:44 AM PST 
Request to CMY.
Please comment whether A class construction done through LRE shall also cost same or there shall be any difference.

Fakher-ul-Hassan replied on Monday, April 25, 2011 06:45 AM PST 
7500 X 1793 = 13447500/=
7500 is total covered area and 1793 is rate per sq.ft. Basement area cost Rs.200 more.

pardesifr replied on Monday, April 25, 2011 07:26 PM PST 
PardesiJ, the price of basement seem too expensive, as there is anothe person who posted 2-3 days back for a 10 marla plot and his price was way lower than yours, your plot required any special treatement for basement to be so costy ? 50 Lakh just for basement, that is too much, you could have constructed a new house of 10 marla in this price :S

a. moeed replied on Monday, April 25, 2011 07:32 PM PST 
dear bro Dilbar,plz take a breath as the amount of 1 crore 34 lacs includes constructional price for basement, ground as well as first floor.

Pardesi, Jeddah replied on Monday, April 25, 2011 08:19 PM PST 
My initial reaction was more harsh as I was not able to resist the temptation when I arragnged funds for the house building but the rates seemed unreasonable. I also had offers lower then this but I didn't compromise on quality as the house building is not lego blocks. As I said earlier ~+/-5% is contingent upon area & contractor.
The catch here is, as I believe, to go for the basement at these high rates at a plot lessor than 1kanal while enjoying same covered area of a normal kanal plot w/o basement; the only saving that can be achieved is from the building of Basement + its long term benefits. Lets say 5,000 to 5,200 sqft covered area at construction cost:Rs 8.5m to 9m + plot cost:Rs 4m to 4.5m totalling Rs 12.5m to 13.5m

Pardesi, Jeddah replied on Monday, April 25, 2011 09:06 PM PST 
If you observe closely, above is an interactive WS that allows estimation of price at different stages & their completion percentages.
If you spread out the construction period & you can arrange funds later on while finishing any one portion:
Lets say Basement & First Floor upto the Grey Structure & Ground Floor 80% complete. This requires only Rs 8.5m out of 13.5m (postpone Rs 5m) in the above example.
OR any such combination that allows you not to spend the full amount in one go.

FCA replied on Monday, April 25, 2011 09:42 PM PST 
Pardesi sb,
Excellent presentation (makes me wonder if you're an accountant!). It is really good to see someone sharing hard data that others can use and benefit from.

masifjamil replied on Tuesday, April 26, 2011 02:11 AM PST 
Its a good presentation. However i have experienced some higher rates especially in wood work and marble. If you choose some solid wood for doors / chokhat like Diyar, your cost would be almost double than the above rates. I also think that the cost of marble like boticena 4 sooter have been incorporated in the above sheet as the diversion to some quality marble esp 6 sooter size cost too much and your cost may be higher by Rs. 1.0 million additionally.

Adil Saeed replied on Tuesday, April 26, 2011 02:41 AM PST 
We only do A class construction jobs. We dont touch B or C class.

LRE Hot Topics replied on Tuesday, April 26, 2011 09:00 PM PST 
Post added to useful posts list. View MORE Useful Posts Click on >>> LRE Hot Topics

Muhammad Nasir Abbas replied on Wednesday, April 27, 2011 01:01 AM PST 
Dear Pardesi, Jeddah
Can you please share this excel sheet with me. My email address is m"dot"nasirabbas"at the rate of"gmail"dot"com.
Thanks in advance and may ALLAH make your house Mubarak for you & family.
Ameen.

JS replied on Wednesday, June 22, 2011 11:49 AM PST 
I think it is wxpensive...

Mehr Liaqat Jalvi replied on Wednesday, September 26, 2012 01:11 PM PST 
if someone can tell me whats is construction rate for RCC building in rural areas ?please quote me rate inclusive of (material+labour).whats is upcharge for paint/whitewash ?

cell Mehr Liaqat Jalvi
(118)
Sunday, April 24, 2011 02:08 AM PST 
Comments closed
10 Marla Constructin R

Work Details Rate Total Cost Remarks
Labour contractor charges   3,90,000 Your structure will be completed in 60 days
Ghasso   50,000.00 Earth filling
Steel {sarya} per ton ,000.00 "Model steel" Deformed 10 ton includes basement
Cement 334 272, bags
crush Margalla 46/sft 1,20,000 3 trucks Margalla crush
sand 8/sft 60, trolleys
Bricks 5.3 424,,000 bricks
Anti-termite   15,th generation formula
Electrician   20,000.00  
Electric items   170,000.00 Fast cables,Fans,lights,conduting,switches
Plumber   20,000.00  
Sanitary items   89,057.00 Turkish set
Sanitary fittings   82,820.00 Porta,Fasial
Bath tub   6,500.00  
Shower cabin   15,000.00  
Aluminum   150,000.00  
Grills   40,000.00  
Gate   40,000.00  
Terrace railing   30,500.00  
Spiral stairs till roof outside   28,000.00  
Inside SS railing   25,000.00  
Marble cost Botisena   88,790.00  
Flooring Tiles cost 24 inch size 950 24,st floor sitting, kitchen, patio -All imported
Bath tiles 704/ 81,800.00 Master "A" Class from show room
meter
Grinding   26,000.00  
Roof insulation tiles 22 22,000.00 Thermopore 2" thick
False ceiling   34,000.00  
Painter   34,732.00  
Paint/material   71,169.00 ICI factory price
Kitchen Marble slabs   10,000.00  
Kitchen wall tiles   7,000.00  
Main door “Black Gold” Marble Slabs/steps   6,000.00  
Wooden flooring 8mm   25,000.00 Malaysian imported
Carpenter labour charges   72,725.00  
Wooden doors material   79,750.00  
Kitchen wood material   35,680.00  
Elmira wood material   115,910.00  
Door locks   32,290.00 Tower bolts, stoppers, folding handle wire gauge, pipe rods etc
Glass fixer   13,000.00  
Truck/Suzuki rent   10,000.00 For Bath tiles loading, marble tiles, sanitary fittings like commode etc
Bath mirrors   10,000.00 Large glass
Fiber glass   28,000.00 for 2 open roof sections on 1st floor
Bhal/plants   10,000.00  
Graphiato   25,000.00 For exterior paint
contractor charges   600,000.00 House is ready in 6 months Sub totalRs 37,17,17 commencing from S.No 16
Basement cement   66, cement bags in basement size 15'x15' only cement included.
Basement labour charges   70,000.00 To be paid to labour contractor for work
Earthing   5,000.00 Done at the end for safety
3,792,717.00

habib replied on Sunday, April 24, 2011 02:21 AM PST 
dear
whats the per sq ft charges
what is the difference in A classa nd other class construction

STRANGER replied on Sunday, April 24, 2011 03:00 AM PST 
Mian Sahib,
Very good effort to bring all the information across.but i think you need to segregate it again in different levels with price so easily any one can understand.
at the moment it gives a mixed picture and not easy to understand people like me who have not done it ever.

Ikram replied on Sunday, April 24, 2011 04:02 AM PST 
Dear Mr, Rashid,
Is it correct to understand that, total labour approx. cost
will be 300 to 335 rupees per sq.ft.? even more. eg
a. Labour contractor charges =390,000
b. Electrician =20,000
c. Plumbing =20,000
d. Contractor charges=600,000
e. Basement labour charges=70,000
I am sure + many more.
Please revisit your calculation.
Many Thanks

pardesifr replied on Sunday, April 24, 2011 10:42 AM PST 
That is such a useful post, thank you so much
This gives a clear picture
I have some question :
- What is the Class of this construction ?
- Is the Basement included in your total ? if yes can you please tell me how much the basement cost you alone ?
- Agree with stranger, as you have done so much effort can you give more detail and split in more categories ?
Also if you can tell date and place where it was done ?
Thanks so much, it is already a great effort :)

S.S.S replied on Sunday, April 24, 2011 08:25 PM PST 
Great,Wunderfull Job......Mian Rashid Sahib.
These are the things needed to the persons newlly starting thire construction are planing.Thanks once more

shiraz replied on Sunday, April 24, 2011 09:10 PM PST 
Thank you so much Rashid sb for this wonderful information.
It would be great if you can segregate the cost of basement from this. Also please let me know how many bedroom house is this? And what is total covered area?

Mian replied on Sunday, April 24, 2011 09:43 PM PST 
U can get all the details give ur e.mail add i send u all the details with more clearification

ali1 replied on Sunday, April 24, 2011 11:02 PM PST 
c0vered area ??????

Mian Rashid replied on Sunday, April 24, 2011 11:58 PM PST 
U can get all the details give ur e.mail add i send u all the details with more clearification

asif replied on Monday, April 25, 2011 12:01 AM PST 
My email address is . Please give details for 1 kanal in Defence phase 6 with basement. Please also comment on the prices/estimate given by pardesi today for A class construction.

Mian replied on Monday, April 25, 2011 01:06 AM PST 
ASIF BAHI I SEND U DETAILS PLS CHECK

asghar replied on Monday, April 25, 2011 04:10 AM PST 
mjay b detail send ker du.
regards

shiraz replied on Monday, April 25, 2011 06:37 AM PST 
kindly also send the details to
Jazaak-Allah

amjad ali replied on Monday, April 25, 2011 06:50 AM PST 
plz send me all detail on my e-mail address
thanks

Mian replied on Monday, April 25, 2011 07:42 AM PST 
Any one else need pls need e.mail add

mrs arif replied on Monday, April 25, 2011 10:17 AM PST 
please also send me details on my e.mail

CS replied on Monday, April 25, 2011 07:29 PM PST 
Please send me detials on my below Email.

pardesifr replied on Monday, April 25, 2011 07:51 PM PST 
Mian sahbab,
my email
please send me the details,
especialy the detail and total price for Basement
Also please indicate area and date when it was done

JUJ replied on Monday, April 25, 2011 08:39 PM PST 
With basement on 10 Marlas in < 38 lakh. Is that correct?
Great post anyway.

Mian replied on Monday, April 25, 2011 10:13 PM PST 
Need further details send e.mail id

mach replied on Monday, April 25, 2011 10:39 PM PST 
my e-mail is
Miam sahib your location is Lahore or Islamabad

kamal replied on Tuesday, April 26, 2011 02:32 AM PST 
my e-mail address is. ,

Zulafqar replied on Tuesday, April 26, 2011 04:17 AM PST 
@ Mian Rashid
Please forward the details at .
Regards,

aftab01 replied on Tuesday, April 26, 2011 07:30 PM PST 
Main Rashid,
pls email me details.

LRE Hot Topics replied on Tuesday, April 26, 2011 09:09 PM PST 
Post added to useful posts list. View MORE Useful Posts Click on >>> LRE Hot Topics

Syed Soulat Abbas Zaidi replied on Sunday, May 1, 2011 06:55 AM PST 
i want to build 10 Marla house without basement of 5 bedrooms in Bahria Town Block A, I need your estimation if we start development in June.
Please share all the possible development costs and what cost need to be paid when so that i can arrange that amount at that time. Also duration of when the house will be ready for use?
per square feet cost is also required for clarity with material and without material.
details:
Syed Soulat Abbas Zaidi

JS replied on Wednesday, June 22, 2011 11:50 AM PST 
Mail me please

Waqas replied on Wednesday, November 2, 2011 12:35 AM PST 
I want to build 10 Marla house in Punjab Housing society near Wapda Town.
For 2 floors (without basement)
For 2 floors (with basement)
I have few construction plans in my mind. Please send me the cost accordingly.
1: If i contract with you only for labor and all material will be my responsibility.
2: If i contract with you for ever thing including labor and material
Please send me the details on the following email id so that we can proceed further:

Please keep in mind that i am planning to construct the house in next 2-3 months.
Your help in this regard is much appreciated.

Hasnain replied on Saturday, November 26, 2011 06:48 AM PST 
Mian Sahib,
It was a very useful information. I am planning to build a 10 Marla House in Air Avenue, Lahore. I want 5 bed rooms (2 at ground level, 3 at first floor) Can you please let me know the total material needed and also the possible time it will take to complete th house. I intend to start construction in May, 2011. My email is .
Regards,
Hasnain

Qaisar Khalil replied on Saturday, June 2, 2012 05:35 AM PST 
Mian Sahib salam,
Your information is really very usefull, i want to know the construction cost of 10 marla house with basement in lahore, kindly if u tell me the construction cost as i want to build the house in July 2012 onwards. My email add is

Qaisar Khalil replied on Saturday, June 2, 2012 05:44 AM PST 
Mian Sahib salam,
Your information is really very usefull, i want to know the construction cost of 10 marla house with basement in lahore, kindly if u tell me the construction cost as i want to build the house in July 2012 onwards. My email add is

False flooring in Hyderab replied on Monday, June 18, 2012 08:39 PM PST 
Our Eco-friendly Raised flooring and Wooden false flooring is weather coated on the backside and withstands fire, water & dust. These are easy to install and are convenient for both dismantling and assembling. Owing to quality attributes, these are used in server rooms, control rooms, Hub rooms etc.
• Raised flooring are Strong Attractive, durable and long lasting
• Inspected flooring materials Our flooring experts quality.
For more details please visit http://www.falseflooring.co.in/false_flooring_in_hyderabad.php
(117)
Friday, April 22, 2011 09:26 AM PST 
Comments closed
(116)
Thursday, April 21, 2011 08:24 PM PST 
Comments closed
House Construction Services by Lahore Real Estate

. :cl :cl :cl :cl :cl :cl
Lahore real estate is now offering house construction services in DHA Lahore and Bahria Town Lahore on supervision bases only or with materials+labor.
To get cost estimates or other details please call on phone Mr Adil Saeed 03224009766
. :cl :cl :cl :cl :cl :cl

saqib replied on Thursday, April 21, 2011 08:51 PM PST 
Do you guys also take grey structure contract? What will be the rate?

CMY replied on Thursday, April 21, 2011 09:56 PM PST 
Saqib bhai to get price of any gray structure several factors need to be known like location of house and type or use of materials and what is included in structure water tanks/septic tanks boundary walls or garage floor and how many stories etc. I am sorry I cant offer a fake or unreliable general rate without knowing these fine details. A phone call must be made to discuss needs in details first.
Please call Adil Saeed at 03224009766 to discuss these things and than get a proper rate.
Ch Mujahid Yasin
03224009967

Javaid replied on Thursday, April 21, 2011 10:36 PM PST 
Dear Mr. CMY
I fully agree with you that quoting a flat rate without knowing details is not possible. However you can distinguish yourself by offering some detailed specs along with rates based on the popular choices e.g. we know usually people go for double story construction - you can also assume the overall / allowed covered area for various sizes - and then you can include some specifications for various cost elements and put up a high-level estimate. I am sure, this will really help many potential customers evaluate their options and make informed decisions. At the same time, it will also save your / your team's valuable time in replying so many emails or telephone calls. Just a suggestion.
-Javaid

pardesifr replied on Thursday, April 21, 2011 11:26 PM PST 
I agree with Javaid.
You guys can give average price for double story structure by Classes
(A, B or C). This will help you gain customers, and many people who dont like to call will get info and than call just for confirmatin and adjustment according to their needs.
Are you guys offering any service in Islamaad/Rawalpindi BT /DHA ?

limu replied on Friday, April 22, 2011 09:41 AM PST 
Dear CMY,
It is a good step forward by lahorerealestae and can be of great help to overseas pakistanis.Have you just started this new venture or you have some houses to your credit for which you have provided the supervision.If you have done it before, would it be possible to have a look at one or two such houses which have been constructed under your supervision. Thanks

CMY replied on Friday, April 22, 2011 07:05 PM PST 
Dear Limu we are in this business last 2 years and we have projects on going in DHA 6 and DHA 5. Any can call Mr Adil Saeed at 03224009766 and schedule a site visit.
Ch Mujahid Yasin
03224009967

limu replied on Friday, April 22, 2011 11:54 PM PST 
Great, will talk to Mr Adial.

Muhammad Bilal replied on Saturday, April 23, 2011 12:24 AM PST 
dear sir,
i wana start construction in lahore bharia town sector c in sep / oct 2011, please guide me what is the intaill charges of bhraia town , i have my own layout desihn for house that is 3200 squre feet, including 300 squre feet basement (one halland one room only)....
i want supervision services only all types of material we will provide,and this time i go for grey structure only finishing will be later curently i am outside pakistan other wise i will visit your office please guide me.... if you send detail on my e-mail please,.....
please guide me step by step, like bharia all charges like map design and approval, and other charges as well.
regards
(115)
Thursday, April 21, 2011 07:02 PM PST 
Comments closed
Bahria Town - Map charges - Layout plans ?

AoA,
Now that i have the plot in Bahria town :) thanks to allah
I need some information. As I dont have time these days to go to Bahria's office.
Can anyone please tell me what are the intial charges to start the construction on 10 Marla plot.
How much Bahria charges for the Map, Soil test etc..
I know there is website of Design studio, but it is the most stup*id site i wever saw there is no info on it :S
Alos anyone have Layout plans of 10 Marla houses ?
I know we can get it from design studio office, but for time being i can not go there. Google is not helping me at all :( and on their website Layout link dosent work :S
Thanks for your help :)

aftab01 replied on Thursday, April 21, 2011 07:27 PM PST 
Map and design charges: 1 lac and 80 thousand.
Utilities charges: 1 lac and 70 thousand.
Soil testing: 17500/-
I hope this information will help you.

pardesifr replied on Thursday, April 21, 2011 08:16 PM PST 
Thanks aftab
OMG that is some huge amount :S 3 lakh 67 thousand
Why Map is so expensive ? :S what is included in it ? Architect is included ? or have to take an other with more money :S

aftab01 replied on Thursday, April 21, 2011 08:52 PM PST 
this is for 10 Marla plot .. it will be surely more for kanal.

pardesifr replied on Thursday, April 21, 2011 11:29 PM PST 
aftab01 do you know what services is included in 1 lak 80 thousand Map and design ? as it seem a big amount.

aftab01 replied on Friday, April 22, 2011 12:26 AM PST 
i don't know ... i have document it only says... design approval. i think they will give you architech and structure design in this amount.
pardesifr, for how much did you buy your bt phase 4 plot?

wassem replied on Friday, April 22, 2011 01:09 AM PST 
Pardesifr sb
the bahria town architect take fee but he is not creating any new design and idea if you go outside architect than bahria town architect need 3D image and so more many thing and creating problem ???

AG replied on Friday, April 22, 2011 04:12 AM PST 
Dear All.
BT(Pvt)Ltd.
Design Wing Rawalpindi.
Charges for 01 Kanal Plot.
1.Architectural Drawings = 115,000/-
2.Soil Test (2 Bores) = 015,000/-
3.Normal Structure(Elect+Plumb) = 020,000/-
4.Total (1+2+3 above) = 150,000/-
5.Frame Structure (Extra Payment) = 010,000/-
6.Design Approval = 095,000/-
Total Charges for Non Structural Design = 115,000+020,000+095,000
= 230,000/-
Total Charges for Structural Design = 230,000+015,000+010,000
= 255,000/-
Regards.

pardesifr replied on Friday, April 22, 2011 09:59 AM PST 
Thanks AG
Can you please give same detailed breakdown for 10 Marla ?
Btw why 95 000 for design approval while design and map is done by BT themselves :S
Waseem : You wanna say we can have our own map if we want ? i thought we were forced to select from a book from Bahria town.
aftab : I got it for 32 lakh it is near commercial area

AG replied on Friday, April 22, 2011 10:50 AM PST 
Dear All,
For 10 Marla.
1. Arcitectural Drawings = 72,000/-
2. Soil Test = 13,000/-
3. Normal Structure (Elect+Plumbing) = 17,000/-
4. Total (1+2+3) = 102,000/-
5. Frame Structure (Extra Payment) = 5,000/-
6. Design Approval = 90,000/-
Total for Frame Structure = 197,000/-
Total for Normal Structure = 179,000/-
Item No.6 (Design Approval)is mandatory (Must be paid)irrespective of the fact whether Item No.1 (Architectural Drawings) is carried out by Bahria Design Wing or not.
Kind Regards.

aftab01 replied on Friday, April 22, 2011 06:53 PM PST 
pardesifr, is it level plot or 3 to 4 feet deep? thanks if you could give more details.

pardesifr replied on Friday, April 22, 2011 07:21 PM PST 
Thanks AG
Even after paying all this big amount, BT architec will not supervise the construction ? and will have to put 1 lakh more to get an other architec from outside :S ??
aftab: I consider it as level plot however i think about 2 feet deep, but aftab dont get fooled by plot you see leveled in phase 4/3 if you see it, it mean it was filled so you will anyway have to dig it again and fill with solid and use roller etc..

NAVEED replied on Thursday, July 21, 2011 09:11 PM PST 
AoA,
Now that i have the plot in Bahria town Lahore, thanks to allah
I do not have time these days to go to Lahore Bahria's office.
Can anyone please tell me what are the intial charges to start the construction on 10 Marla plot.
How much Bahria Lahore charges for the Map, Soil test & map passed from govt. authourities (DMA) etc..
I know there is website of Design studio, but it is working and showing any results :NE
Alos anyone have Layout plans of 10 Marla houses ?
I know we can get it from design studio office, but for time being i can not go there. :NE
Thanks for your help

Bilal Ahmed replied on Monday, November 7, 2016 02:54 AM PST 
dear AG, Assalam u alaikum
can you please provide details for 5 marla plot ??? your support will be appreciated.

Azim.J.M.104 replied on Monday, January 1, 2018 01:22 AM PST 
Hello Everyone,
Can anyone give me info about the 7 marla plot in phase 8?
Thanks

syeda rehaaam shah replied on Monday, April 9, 2018 02:27 AM PST 
aoa.plz tel me possession nd map chrges.I hv a polt in bhreya rawlpindi....sm one tell me 4lakh 50000chrgez bouth of them

Fawad replied on Thursday, April 30, 2020 07:24 AM PST 
Can someone share to date latest expense charges for 10 Marla plot in bahria town lahore apart of possession & utilities charges?

Khalid replied on Sunday, August 23, 2020 11:51 PM PST 
Friends, I just got possession for 5 Marla Plot in Bahria Nasheman Lahore, I have paid possession charges, utility charges, and maintenance charges to date. I just need to know from your expert opinion that how much I need to pay for map approval for 5 marla plots and what if I design my own 3D map and they approve it accordingly. Furthermore, is there any more charges involved after map approval or I will be starting my construction work? Please guide. Thanks!

Muhammad replied on Saturday, February 13, 2021 09:47 AM PST 
Can some one share Bahria Lahore Design Wing total Charges for 5M Commercial?

Aamir Malik replied on Saturday, May 22, 2021 11:32 PM PST 
Can you please quote Map cost (Complete) for construction of 5 Marala house in DHA Ph-11, Lahore

Asif Hassan replied on Wednesday, June 26, 2024 02:41 AM PST 
10marla Design approval fee in Bahria Town Rawalpindi

M. Sarwar Awan johar Tow replied on Sunday, February 2, 2025 05:06 AM PST 
What will be the charges of 10 marla map
(114)
Monday, April 18, 2011 09:40 AM PST 
Comments closed
10 marla plot covered area : 10 m BT

AoA,
Can anyone tell me what is the covered area for double story of 10 marla plot in bahria town rawalpindi ?
Thanks

pardesifr replied on Tuesday, April 19, 2011 02:17 AM PST 
Anyone can help please ?

AG replied on Tuesday, April 19, 2011 06:07 AM PST 
In Bahriia Town Rawalpindi.
For 10 Marla Plot.
Permissable Land Use = 70% (1575 Sq.ft)
FAR(Total Covered area) = 1:1.5 {3375 Sq.ft)

pardesifr replied on Tuesday, April 19, 2011 09:19 PM PST 
Thanks AG
So FAR is the area with Ground Floor+First floor, Am i right ?
Total Permissable land use is 70% but as there are other restriction it drop it down a little bit.
Space to spare : (for plot of 30 X 75 10 Marla)
10 ft Front : 10 x 30 = 300 sqft
5 ft : one Side : 5 * 75 = 375 sqft
5 ft back : 5 x 30 = 150
Total place to spare : 825
Total plot size = 30 x 75 = 2250 sqft
Land to be used = = 1425 sqft (63 %)
So in reality it is 63 % not 70% :(
Am i right ?
So with first floor which I assume is maybe 90% of groud floor = 1425 x 90% = 1283
So Total area approx will be 2708 sqft
Can anyone confirm if my calculation are correct or not ? Or i am missing something ?

Javed replied on Tuesday, April 19, 2011 09:37 PM PST 
Good calculations dear pardesifr, just a small thing is missing, if you have already taken the front & back space area then one side passage area will be 5x60 instead of 5x75

visitor replied on Tuesday, April 19, 2011 11:16 PM PST 
@perdesifr
want to ask you one thing,what is the meaning of your nick(perdesifr,
honestly i have seen many times on this site.but never understand the meaning of your name.lol

Saeed Chaudhry replied on Wednesday, April 20, 2011 01:02 AM PST 
Dear Pardesifer
please make some correction in your calculation :
10 ft Front : 10 x 30 = 300 sqft----- OK
5 ft : one Side : 5 x 60 = 300 sqft
(as you are already deducting 10 ft front & 5 ft backside)
5 ft back : 5 x 30 = 150 ----- OK
Total place to spare : 750
Regards

AG replied on Wednesday, April 20, 2011 01:02 AM PST 
@Peresifr.
The figures I have given are correct.
Further the permissable building height is 38 ft.
Regards.

AG replied on Wednesday, April 20, 2011 01:27 AM PST 
@Perdesifr.
The figures I have given are applicable to all the following plot sizes.
30x75, 35x70 & 35x65.
So you will get slightly different figure for different sizes of plot.
Regards.

pardesifr replied on Wednesday, April 20, 2011 01:45 AM PST 
Thanks for correcting Javed and Chaudry :) you guys are right
visitor > Pardesi = Stranger / Immigrant in Urdu Fr = France, as i was living before i came back in home country last year :)

ali replied on Sunday, June 25, 2017 01:41 AM PST 
and wat is the min cover area we can use to built a 10 marla house in bahria town 8 rawalpindi
(113)
Sunday, April 17, 2011 10:27 AM PST 
Comments closed
constrctuion rates?

what are the construction rates :
A CLASS?
B CLASS?
Grey Structure?
and approx how much cost is required for 10 marla house ?single story and double story?

Pardesifr replied on Monday, April 18, 2011 12:18 AM PST 
I need same information
Thanks

M. Riaz replied on Monday, April 18, 2011 01:24 AM PST 
Class A - RS 1600 to 2000 / SFT
Class B - RS 1200 to 1500 / SFT
Grey Structure - RS 750 to 900
(112)
Tuesday, April 12, 2011 01:03 AM PST 
Comments closed
Basement or lower ground cost

AoA,
I need to know the approximate cost to make a Basement or lower ground on a 10 Marla plot in Bahria town. I am just talking of it’s Grey structure with no finishing at all.
Please tell me price not that it is 1.5 of Ground floor etc..
Thanks in advance

pardesifr replied on Tuesday, April 12, 2011 06:58 PM PST 
Koyi to help kar do ?? :( :( :(

Pardesi, Jeddah replied on Tuesday, April 12, 2011 10:20 PM PST 
I am constructing the grey-structured basement in Lahore at around PKR 1,500 per sqft.

pardesifr replied on Tuesday, April 12, 2011 11:36 PM PST 
waoo that is expensive bahi, only grey structure for 1500 /sqf ? it is double than groud floor :( so for 10 marla only grey strucrue of Baement will cost 33 Lakh that is a Huge amount just for a grey structure :S WIth finishing it will go to what 50 Lakh jsut Basement.
Are you sure about the price ?

Pardesi, Jeddah replied on Wednesday, April 13, 2011 01:41 AM PST 
yea! this is the most recent A class construction rates, with cement around 410, iron around 70,000 & bricks around 5,500 now c the calculations:
Basement 1200 sqft. @ 1,500
GFloor 1500 sqft. @ 900
FFloor 1200 sqft. @ 800
This gives average per sqft. PKR 1,050 approx. while if u go for w/o basement ur cost will be 855. u will be paying around Rs. 200 extra but u r saving the additional price of the plot, lets say PKR 1,000 per sqft., & having around 4000 sqft. covered area. Also enjoying the LT benefits associated to the basement.

LRE Hot Topics replied on Thursday, April 14, 2011 07:02 PM PST 
Post added to useful posts list. View MORE Useful Posts Click on >>> LRE Hot Topics

pardesifr replied on Thursday, April 14, 2011 08:44 PM PST 
Thanks Pardesi J
All these calculation is based on 10 Marla plot in BT
By the way do you know how much is the covered area in sqft in a 10 Marla plot of Bahria town ?
Thanks :)

Pardesi, Jeddah replied on Saturday, April 16, 2011 08:44 AM PST 
I don't know about Bahria, usually 66% is allowed at the 10m plot

Ali replied on Tuesday, January 9, 2018 04:13 PM PST 
i don't agree with these figures. the costs are away too exaggerated. i built my house 22 marla for 35 Lakh the grey structure 3 story.
When i went to these building companies they were like over 100 lakhs. it has cost me a total of 65 Lakh at good finishing level.
(111)
Thursday, March 24, 2011 09:44 AM PST 
Comments closed
Plot wanted in Naval Anchorage Islamabad

Plot having 500 Yards of size wanted at Naval Anchorage Islamabad. I can be contacted at
Hammad Mian
Los Angeles, USA :flg

Javid replied on Thursday, March 24, 2011 09:09 PM PST 
Dear Mian Sahib,
Any particular reason to buy in this Law wasir society.
Naval Anchorage is almost still from the last 10 years and even getting worst. It is way out of high way and not on safe access road. Bharia is much better and lively to live, having much better infrastructure.

Hammad replied on Friday, March 25, 2011 09:12 AM PST 
Javid sb: I think you didn't visit the place personally. My family members visited the area and they found it calm and peaceful. Houses are being constructed rapidly. This was started in 2006 therefore It has been over 5 years now, not 10.

Javid replied on Friday, March 25, 2011 11:39 AM PST 
@ Mian Sahib,
If you are determent to buy and construct in Navel Anchorage, it is a different story.I know this society when it was having access from Japan road and my recent visit to anchorage was about 3 weeks back and observation on this society was even worst.
My recommendation is whole heartedly but the choice is your’s

Resident replied on Friday, March 25, 2011 05:39 PM PST 
Javid sb, probably you were not allowed by the security staff to enter the Naval officers housing scheme , thats why you are not happy with the scheme.Forgive me if my assessment is wrong.
Mr Hammad is right in his comments.

Resident too replied on Saturday, March 26, 2011 06:37 PM PST 
ex-Rasident,
The fact is this is a horrible place to live. I lived in this society for 6 month and now put on my house on sale and no buyer. It is far off from road no transport no marker school around and no social life. In simple it is full of horror to live in anchorage

pardesifr replied on Sunday, March 27, 2011 02:46 AM PST 
I visited it also 2-3 months back, it dont like it at all, it is far away from Main highway, very limited commercial area, parks maybe there but i didnot noticed any which means.... no major school, no transport, etc... Road were kind of OK but nothng compared to what Bahria and DHA is.
It your choice, but you should better visit by your self to observe that it is waste of money.
HTML code is disabled     Next Page