10 Marla Constructin R
Work Details Rate Total Cost Remarks
Labour contractor charges 3,90,000 Your structure will be completed in 60 days
Ghasso 50,000.00 Earth filling
Steel {sarya} per ton ,000.00 "Model steel" Deformed 10 ton includes basement
Cement 334 272, bags
crush Margalla 46/sft 1,20,000 3 trucks Margalla crush
sand 8/sft 60, trolleys
Bricks 5.3 424,,000 bricks
Anti-termite 15,th generation formula
Electrician 20,000.00
Electric items 170,000.00 Fast cables,Fans,lights,conduting,switches
Plumber 20,000.00
Sanitary items 89,057.00 Turkish set
Sanitary fittings 82,820.00 Porta,Fasial
Bath tub 6,500.00
Shower cabin 15,000.00
Aluminum 150,000.00
Grills 40,000.00
Gate 40,000.00
Terrace railing 30,500.00
Spiral stairs till roof outside 28,000.00
Inside SS railing 25,000.00
Marble cost Botisena 88,790.00
Flooring Tiles cost 24 inch size 950 24,st floor sitting, kitchen, patio -All imported
Bath tiles 704/ 81,800.00 Master "A" Class from show room
meter
Grinding 26,000.00
Roof insulation tiles 22 22,000.00 Thermopore 2" thick
False ceiling 34,000.00
Painter 34,732.00
Paint/material 71,169.00 ICI factory price
Kitchen Marble slabs 10,000.00
Kitchen wall tiles 7,000.00
Main door “Black Gold” Marble Slabs/steps 6,000.00
Wooden flooring 8mm 25,000.00 Malaysian imported
Carpenter labour charges 72,725.00
Wooden doors material 79,750.00
Kitchen wood material 35,680.00
Elmira wood material 115,910.00
Door locks 32,290.00 Tower bolts, stoppers, folding handle wire gauge, pipe rods etc
Glass fixer 13,000.00
Truck/Suzuki rent 10,000.00 For Bath tiles loading, marble tiles, sanitary fittings like commode etc
Bath mirrors 10,000.00 Large glass
Fiber glass 28,000.00 for 2 open roof sections on 1st floor
Bhal/plants 10,000.00
Graphiato 25,000.00 For exterior paint
contractor charges 600,000.00 House is ready in 6 months Sub totalRs 37,17,17 commencing from S.No 16
Basement cement 66, cement bags in basement size 15'x15' only cement included.
Basement labour charges 70,000.00 To be paid to labour contractor for work
Earthing 5,000.00 Done at the end for safety
3,792,717.00