10 Marla Constructin R

Work Details Rate Total Cost Remarks
Labour contractor charges   3,90,000 Your structure will be completed in 60 days
Ghasso   50,000.00 Earth filling
Steel {sarya} per ton ,000.00 "Model steel" Deformed 10 ton includes basement
Cement 334 272, bags
crush Margalla 46/sft 1,20,000 3 trucks Margalla crush
sand 8/sft 60, trolleys
Bricks 5.3 424,,000 bricks
Anti-termite   15,th generation formula
Electrician   20,000.00  
Electric items   170,000.00 Fast cables,Fans,lights,conduting,switches
Plumber   20,000.00  
Sanitary items   89,057.00 Turkish set
Sanitary fittings   82,820.00 Porta,Fasial
Bath tub   6,500.00  
Shower cabin   15,000.00  
Aluminum   150,000.00  
Grills   40,000.00  
Gate   40,000.00  
Terrace railing   30,500.00  
Spiral stairs till roof outside   28,000.00  
Inside SS railing   25,000.00  
Marble cost Botisena   88,790.00  
Flooring Tiles cost 24 inch size 950 24,st floor sitting, kitchen, patio -All imported
Bath tiles 704/ 81,800.00 Master "A" Class from show room
meter
Grinding   26,000.00  
Roof insulation tiles 22 22,000.00 Thermopore 2" thick
False ceiling   34,000.00  
Painter   34,732.00  
Paint/material   71,169.00 ICI factory price
Kitchen Marble slabs   10,000.00  
Kitchen wall tiles   7,000.00  
Main door “Black Gold” Marble Slabs/steps   6,000.00  
Wooden flooring 8mm   25,000.00 Malaysian imported
Carpenter labour charges   72,725.00  
Wooden doors material   79,750.00  
Kitchen wood material   35,680.00  
Elmira wood material   115,910.00  
Door locks   32,290.00 Tower bolts, stoppers, folding handle wire gauge, pipe rods etc
Glass fixer   13,000.00  
Truck/Suzuki rent   10,000.00 For Bath tiles loading, marble tiles, sanitary fittings like commode etc
Bath mirrors   10,000.00 Large glass
Fiber glass   28,000.00 for 2 open roof sections on 1st floor
Bhal/plants   10,000.00  
Graphiato   25,000.00 For exterior paint
contractor charges   600,000.00 House is ready in 6 months Sub totalRs 37,17,17 commencing from S.No 16
Basement cement   66, cement bags in basement size 15'x15' only cement included.
Basement labour charges   70,000.00 To be paid to labour contractor for work
Earthing   5,000.00 Done at the end for safety
3,792,717.00

habib replied on Sunday, April 24, 2011 02:21 AM PST 
dear
whats the per sq ft charges
what is the difference in A classa nd other class construction

STRANGER replied on Sunday, April 24, 2011 03:00 AM PST 
Mian Sahib,
Very good effort to bring all the information across.but i think you need to segregate it again in different levels with price so easily any one can understand.
at the moment it gives a mixed picture and not easy to understand people like me who have not done it ever.

Ikram replied on Sunday, April 24, 2011 04:02 AM PST 
Dear Mr, Rashid,
Is it correct to understand that, total labour approx. cost
will be 300 to 335 rupees per sq.ft.? even more. eg
a. Labour contractor charges =390,000
b. Electrician =20,000
c. Plumbing =20,000
d. Contractor charges=600,000
e. Basement labour charges=70,000
I am sure + many more.
Please revisit your calculation.
Many Thanks

pardesifr replied on Sunday, April 24, 2011 10:42 AM PST 
That is such a useful post, thank you so much
This gives a clear picture
I have some question :
- What is the Class of this construction ?
- Is the Basement included in your total ? if yes can you please tell me how much the basement cost you alone ?
- Agree with stranger, as you have done so much effort can you give more detail and split in more categories ?
Also if you can tell date and place where it was done ?
Thanks so much, it is already a great effort :)

S.S.S replied on Sunday, April 24, 2011 08:25 PM PST 
Great,Wunderfull Job......Mian Rashid Sahib.
These are the things needed to the persons newlly starting thire construction are planing.Thanks once more

shiraz replied on Sunday, April 24, 2011 09:10 PM PST 
Thank you so much Rashid sb for this wonderful information.
It would be great if you can segregate the cost of basement from this. Also please let me know how many bedroom house is this? And what is total covered area?

Mian replied on Sunday, April 24, 2011 09:43 PM PST 
U can get all the details give ur e.mail add i send u all the details with more clearification

ali1 replied on Sunday, April 24, 2011 11:02 PM PST 
c0vered area ??????

Mian Rashid replied on Sunday, April 24, 2011 11:58 PM PST 
U can get all the details give ur e.mail add i send u all the details with more clearification

asif replied on Monday, April 25, 2011 12:01 AM PST 
My email address is . Please give details for 1 kanal in Defence phase 6 with basement. Please also comment on the prices/estimate given by pardesi today for A class construction.

Mian replied on Monday, April 25, 2011 01:06 AM PST 
ASIF BAHI I SEND U DETAILS PLS CHECK

asghar replied on Monday, April 25, 2011 04:10 AM PST 
mjay b detail send ker du.
regards

shiraz replied on Monday, April 25, 2011 06:37 AM PST 
kindly also send the details to
Jazaak-Allah

amjad ali replied on Monday, April 25, 2011 06:50 AM PST 
plz send me all detail on my e-mail address
thanks

Mian replied on Monday, April 25, 2011 07:42 AM PST 
Any one else need pls need e.mail add

mrs arif replied on Monday, April 25, 2011 10:17 AM PST 
please also send me details on my e.mail

CS replied on Monday, April 25, 2011 07:29 PM PST 
Please send me detials on my below Email.

pardesifr replied on Monday, April 25, 2011 07:51 PM PST 
Mian sahbab,
my email
please send me the details,
especialy the detail and total price for Basement
Also please indicate area and date when it was done

JUJ replied on Monday, April 25, 2011 08:39 PM PST 
With basement on 10 Marlas in < 38 lakh. Is that correct?
Great post anyway.

Mian replied on Monday, April 25, 2011 10:13 PM PST 
Need further details send e.mail id

mach replied on Monday, April 25, 2011 10:39 PM PST 
my e-mail is
Miam sahib your location is Lahore or Islamabad

kamal replied on Tuesday, April 26, 2011 02:32 AM PST 
my e-mail address is. ,

Zulafqar replied on Tuesday, April 26, 2011 04:17 AM PST 
@ Mian Rashid
Please forward the details at .
Regards,

aftab01 replied on Tuesday, April 26, 2011 07:30 PM PST 
Main Rashid,
pls email me details.

LRE Hot Topics replied on Tuesday, April 26, 2011 09:09 PM PST 
Post added to useful posts list. View MORE Useful Posts Click on >>> LRE Hot Topics

Syed Soulat Abbas Zaidi replied on Sunday, May 1, 2011 06:55 AM PST 
i want to build 10 Marla house without basement of 5 bedrooms in Bahria Town Block A, I need your estimation if we start development in June.
Please share all the possible development costs and what cost need to be paid when so that i can arrange that amount at that time. Also duration of when the house will be ready for use?
per square feet cost is also required for clarity with material and without material.
details:
Syed Soulat Abbas Zaidi

JS replied on Wednesday, June 22, 2011 11:50 AM PST 
Mail me please

Waqas replied on Wednesday, November 2, 2011 12:35 AM PST 
I want to build 10 Marla house in Punjab Housing society near Wapda Town.
For 2 floors (without basement)
For 2 floors (with basement)
I have few construction plans in my mind. Please send me the cost accordingly.
1: If i contract with you only for labor and all material will be my responsibility.
2: If i contract with you for ever thing including labor and material
Please send me the details on the following email id so that we can proceed further:

Please keep in mind that i am planning to construct the house in next 2-3 months.
Your help in this regard is much appreciated.

Hasnain replied on Saturday, November 26, 2011 06:48 AM PST 
Mian Sahib,
It was a very useful information. I am planning to build a 10 Marla House in Air Avenue, Lahore. I want 5 bed rooms (2 at ground level, 3 at first floor) Can you please let me know the total material needed and also the possible time it will take to complete th house. I intend to start construction in May, 2011. My email is .
Regards,
Hasnain

Qaisar Khalil replied on Saturday, June 2, 2012 05:35 AM PST 
Mian Sahib salam,
Your information is really very usefull, i want to know the construction cost of 10 marla house with basement in lahore, kindly if u tell me the construction cost as i want to build the house in July 2012 onwards. My email add is

Qaisar Khalil replied on Saturday, June 2, 2012 05:44 AM PST 
Mian Sahib salam,
Your information is really very usefull, i want to know the construction cost of 10 marla house with basement in lahore, kindly if u tell me the construction cost as i want to build the house in July 2012 onwards. My email add is

False flooring in Hyderab replied on Monday, June 18, 2012 08:39 PM PST 
Our Eco-friendly Raised flooring and Wooden false flooring is weather coated on the backside and withstands fire, water & dust. These are easy to install and are convenient for both dismantling and assembling. Owing to quality attributes, these are used in server rooms, control rooms, Hub rooms etc.
• Raised flooring are Strong Attractive, durable and long lasting
• Inspected flooring materials Our flooring experts quality.
For more details please visit http://www.falseflooring.co.in/false_flooring_in_hyderabad.php
(75)
Tuesday, March 1, 2011 07:40 PM PST 
Comments closed
(74)
Saturday, February 26, 2011 08:18 AM PST 
Comments closed
10 marla plot beautiful location in E-16/3 cabinet society

A 10 marla ( 35 x 70) plot is for sale in E-16/3 cabinet division society on urgent basis. Very good location. few yards from GT road.
Price is almost final

Atif Ali replied on Saturday, February 26, 2011 10:22 PM PST 
Bhai G,
What about Street no and plot no.............

owner replied on Saturday, February 26, 2011 11:13 PM PST 
Street 28, number is in starting few plots.
(this street has now 10 marla plots according to new map)

Atif Ali replied on Sunday, February 27, 2011 07:46 AM PST 
Is it a newly added to the map?what about possession then?

owner replied on Sunday, February 27, 2011 06:30 PM PST 
These were kanal plots before and now divided into 10 marla. you can apply for possession.

Usman replied on Sunday, February 27, 2011 06:48 PM PST 
Mian Nadeem,and others Could you please advise regarding this price?
Is it a reasonable demand as per markeet trend?

shahid replied on Monday, February 28, 2011 06:49 AM PST 
I am also interested in this plot,
From the map, there are only three high power lines in e16 that are on main roads (north roads1,2) far away from street 28.
Dont know about the leveling but i think it is the responsibility of society, right?

Atif Ali replied on Monday, February 28, 2011 07:00 AM PST 
Mr.Owner,
Could you please share your email,or contact me
Regards

nabeel replied on Monday, February 28, 2011 02:39 PM PST 
just for price idea: i sold my 35x70 plot in street 6 for 12.50 lac all clear. sold to deal point f-10 markaz.

Usman replied on Monday, February 28, 2011 05:11 PM PST 
@ Nabeel,
I believe you but Mian Nadeem has such respect n credibility in this market n on this website that if he is saying something then it means thats the way how it will be.

Mian Nadeem replied on Monday, February 28, 2011 06:27 PM PST 
Mr Usman
Location of plot sold by Mr. Nabeel"s in Street 6 is very good.
My assessment was considering the plot near street 27;in Layout Plan street 28 is not mentioned.
Once again i admit that i cannot provide accurate rates.
Mr. Nabeel
In your opinion what should be the fair price of this plot?

owner replied on Monday, February 28, 2011 09:58 PM PST 
Plot is in Street 28 which comes before street 6, while street 27 is at the end, very far from this.
When you reach the first main chowk (where main boulevard is on the right side) just turn left and the first street is 28 i.e. in front of the mosque and park.

Shahid replied on Tuesday, March 1, 2011 02:56 AM PST 
@ M. Nadeem
Sir can you please confirm that street 28 is really not there in the map? because I can see it where the owner has mentioned.

Naveed replied on Tuesday, March 1, 2011 11:55 AM PST 
@owner
Please confirm is the new layout approved with CDHS E/16, kindly give me your contact e-mail
Regards

Mian Nadeem replied on Tuesday, March 1, 2011 06:16 PM PST 
Yes st 28 is not in Layout Plan. Sellers and interested buyers may try to collect new layout plan and post here.

Shahid replied on Tuesday, March 1, 2011 06:39 PM PST 
do you mean in the new layout or the old map?
Have you seen the new layout?

Usman replied on Tuesday, March 1, 2011 07:20 PM PST 
@ Shahaid,
If you have new layout then share it here.That will show everything.

Shahid replied on Tuesday, March 1, 2011 11:33 PM PST 
Sir I dont have the new map. The old one here,in which st28 exist.
http://www.forcesestate.com/active/viewmap.asp?cid=9&aid=133&mapt=Cabinet Division E-16/17&ref=2&map=AL_112.jpg

Owner replied on Thursday, March 3, 2011 02:51 AM PST 
Street 28 exists in both old and new layout plan. The location of this street is not changed in the new layout, only the plot sizes are changed. I have personally seen the new layout in the cabinet division society office. They have not released it yet but you can go and check it in their office upon insisting.

Ikram replied on Saturday, March 5, 2011 06:31 PM PST 
Not a serious seller. Hiding his identity and contact.
(73)
Monday, February 7, 2011 07:16 AM PST 
Comments closed
(72)
Monday, January 24, 2011 01:43 AM PST 
Comments closed

Daer Ashraf Sahib,
AOA
Few days back I contacted DHA regarding Air Avenue transfer & constration there reply is as follows:
Sir, The Cleared files of air avenue that have been shifted to DHA office have no issues of transfer. They are getting transferred in our office.
Thank you!
Sir, yes you can start construction if your file is in dha.
You may contact Engineering section for construction related details.
Engineering branch:
Tel: & ,
Ext: 321, 614, 416
Thank you
I hope this can help.
Regards

Bilal replied on Monday, January 24, 2011 06:48 AM PST 
Thank you very much for update!
(71)
Saturday, January 22, 2011 03:26 AM PST 
Comments closed
(70)
Saturday, January 22, 2011 02:34 AM PST 
Comments closed
(69)
Friday, January 14, 2011 08:38 PM PST 
Comments closed

Assalam ullekhum CMY-----I looking for 1K plot in DHA phase 7---as you mentioned it range 26--50 Lac
Could you please let me know what is location in 26 and others.Also what is Allocation file mean ? Thanks.

replied on Friday, January 14, 2011 09:53 PM PST 
House for Sale in Bahria Town Rawalpindi Phase 2
Newly constructed house in Phase II (Prime Location) near Bahria Ace Academy. 4 bed with attached bath, Drawing room, 2xSpacious Kitchen, 2 Longes, 1 Stores, Servent room with bath, powder room, wide car poarch (space for 2 cars), front lawn. Interested person can contact on phone.

CMY replied on Friday, January 14, 2011 10:43 PM PST 
Wednesday, January 12, 2011 03:16 PM PST Reply:
Lahore Property Rates Update From Lahore Real Estate Jan 12, 2011
DHA Lahore Phase 7 1 Kanal Min Rate = 28 Lacs & Maximum Rate = 50 Lacs
No plot is available under 28 lacs. 28 lacs plots are on worst location plots like facing Hudaira drain or villages overhead tanks or commercial plots etc . a good plot for living or investment cost min 32 lacs in DHA 7.
Allocation means you get a promise from DHA to get a plot for said phase.
Ch Mujahid Yasin ( CMY )
03224009967

Ikram replied on Saturday, January 15, 2011 02:22 AM PST 
Dear CMY Sahib,
AOA,
Nice to see that, you are giving lot of valueable time to this Forum for which we are great full.
Is it possible for you to tell be the worth of my plot phase 7 block y
no.584 please.

CMY replied on Saturday, January 15, 2011 07:08 PM PST 
Y 584 is worth 31 to 32 lacs.
Ch Mujahid Yasin ( CMY )
03224009967

ihsan replied on Sunday, January 16, 2011 09:12 AM PST 
respected shahzad i deal in property of islamabad if u have any enquiry reg islamabad contact me at or i have living in newyork at coneyisland.nice meeting u on net.ihsan
(68)
Thursday, November 11, 2010 06:31 PM PST 
Comments closed
GDA VIP apartments in Gwadar

brothers,
I have paid all the installments for xtra large apartment in this scheme-GDA VIPApartments- by the builder Nobal hart. The project was supposed to be completed in July,09 according to the agreement but after they got full amount of total cost, they stopped communication either in writing or by phone. All the phone numbers are disconnected.Could anyone please help me find out about this mystery.I invested most of my saving into this project and now that I feel I have lost everything caused by my own country fellowmen, breaks my heart. I reside in US and cannot pursue this matter personally.If you have any source, please help me.The company is on GDA NOC list. Thanks

Aslam replied on Thursday, November 11, 2010 07:08 PM PST 
Please contact Gawader develeopment authority for contact no of the scheme official.
Aslam

Sleepless replied on Thursday, November 11, 2010 07:53 PM PST 
Try contacting:
Gwadar Development Authority
Governor House Road
Gwadar, Balochistan
Pakistan.
Telephone No Director General:

Telephone No Office:
Fax No:
E-mail:
E-mail:
URL: www.gda.gov.pk
Download Registration Form
Quetta Office
G.D.A. Office
Civil Secretariat, Block No.9
2nd Floor, Room No. 28
Quetta, Balochistan
Telephone No:
Fax No:

sherry replied on Friday, November 12, 2010 07:18 PM PST 
its gone with the wind

talha replied on Sunday, January 23, 2011 09:34 AM PST 
no its not the company is very much in place and they are running their bussiness as usual from there old offices. in fact just visited their offices located on clifton bridge about my plot.and was very much satisfied. you an contact them on the nos. -
regards

Badrul replied on Saturday, January 29, 2011 12:56 PM PST 
Can you please describe any progress made on this project.When it is going to be completed.
regards

ikram replied on Monday, July 16, 2012 05:50 AM PST 
Hi Barbul,
I know about this project and company a bit. All the projects in Gwadar were temporarily stopped but the news of starting them again are there very soon. So, be patient and hope for the best. If you have invested in this company your investment is safe as this is an A+ ranked company in GDA ranking
Regards

rizwan replied on Saturday, November 30, 2013 10:04 PM PST 
we also have invest in gwadar ploting
but all plot are under n.o.c from gda
gda telling if you have noc then don't worry
all clint are save because of n.o.c
please contact to gda for more help
(67)
Sunday, October 31, 2010 11:25 PM PST 
Comments closed
Exchange

Dear All,
I would I to exchange my 1Kanal plot in phase 7 block y Plot No. between with extra payment for 1 Kanal plot in Phase 6 Block J, L Or N .
If intrested pls. email me with demand and plot no.
Many Thanks
Regards
Ikram
HTML code is disabled   Previous Page   Next Page