10 Marla Constructin R
Work Details Rate Total Cost Remarks
Labour contractor charges  3,90,000 Your structure will be completed in 60 days
Ghasso  50,000.00 Earth filling
Steel {sarya} per ton ,000.00 "Model steel" Deformed 10 ton includes basement
Cement 334 272, bags
crush Margalla 46/sft 1,20,000 3 trucks Margalla crush
sand 8/sft 60, trolleys
Bricks 5.3 424,,000 bricks
Anti-termite  15,th generation formula
Electrician  20,000.00 Â
Electric items  170,000.00 Fast cables,Fans,lights,conduting,switches
Plumber  20,000.00 Â
Sanitary items  89,057.00 Turkish set
Sanitary fittings  82,820.00 Porta,Fasial
Bath tub  6,500.00 Â
Shower cabin  15,000.00 Â
Aluminum  150,000.00 Â
Grills  40,000.00 Â
Gate  40,000.00 Â
Terrace railing  30,500.00 Â
Spiral stairs till roof outside  28,000.00 Â
Inside SS railing  25,000.00 Â
Marble cost Botisena  88,790.00 Â
Flooring Tiles cost 24 inch size 950 24,st floor sitting, kitchen, patio -All imported
Bath tiles 704/ 81,800.00 Master "A" Class from show room
meter
Grinding  26,000.00 Â
Roof insulation tiles 22 22,000.00 Thermopore 2" thick
False ceiling  34,000.00 Â
Painter  34,732.00 Â
Paint/material  71,169.00 ICI factory price
Kitchen Marble slabs  10,000.00 Â
Kitchen wall tiles  7,000.00 Â
Main door “Black Gold” Marble Slabs/steps  6,000.00 Â
Wooden flooring 8mm  25,000.00 Malaysian imported
Carpenter labour charges  72,725.00 Â
Wooden doors material  79,750.00 Â
Kitchen wood material  35,680.00 Â
Elmira wood material  115,910.00 Â
Door locks  32,290.00 Tower bolts, stoppers, folding handle wire gauge, pipe rods etc
Glass fixer  13,000.00 Â
Truck/Suzuki rent  10,000.00 For Bath tiles loading, marble tiles, sanitary fittings like commode etc
Bath mirrors  10,000.00 Large glass
Fiber glass  28,000.00 for 2 open roof sections on 1st floor
Bhal/plants  10,000.00 Â
Graphiato  25,000.00 For exterior paint
contractor charges  600,000.00 House is ready in 6 months Sub totalRs 37,17,17 commencing from S.No 16
Basement cement  66, cement bags in basement size 15'x15' only cement included.
Basement labour charges  70,000.00 To be paid to labour contractor for work
Earthing  5,000.00 Done at the end for safety
3,792,717.00