Lahore Real Estate Forum

Wednesday, November 25, 2026 04:49 PM
Total records26
Records per page10
Page views today30,919
Page views last hour2,525
(26)
Monday, May 28, 2018 11:29 PM PST 
Comments closed
DHA Lahore Phase 9 Prism Plot For Sale

DHA Phase 9 Prism
*Direct Plot With Papers*
Nearby Numbers
K -115 @ 65 Lacs. 11 Paid Civil 10- Marla
B -874 @ 110 Lacs. 10 Paid Civil 1-Kanal
H -93 @ 130 Lacs. 120 Feet Road, 9 Paid Civil 1-Kanal
H -579 @ 105 Lacs. 10 Paid Civil 1-Kanal
P -979 @ 85 Lacs. 10 Paid Civil 1-Kanal
:sh:
03224009967
Salman Maqsood
Lahore Real Estate (LRE)

Zulqadar replied on Tuesday, May 29, 2018 07:32 PM PST 
In case of phase 7, there are two more important point which are causing price differential:
1. possession and non possession plots; upper cutting has possession and lower cutting is still non possession.
2. General perception of phase 7, i think it is considered that is far becuase it doesn't have direct connection of ring road (phase 9 is connected directly to ring road).
In my humble opinion, price differential in upper and lower cutting of phase 7 is going to reduce in near future because:
1. possession of lower cutting
2. Currently one can make cheapest house in phase 7. u can built a complete double storey house with in 260-270 lacs in phase7. In lower cutting one kanal plot is around PKR 10 Million.
3. currently we only end user in market, who wants to built the house and live in it. there is no investor and for end user the cheapest choice is phase 7. phase 9 is at least 3 years away and IVY green around 1 year. hence no other choice except phase 7.
i think phase 7 is a good investment in the current environment. At the end of the day, you can in DHA by investment only 260 lacs, which is the plot price of phase 6.

From UK replied on Thursday, May 31, 2018 02:10 PM PST 
@ Zulqadar
Sir, please pardon my knowledge but I was thinking to buy a file in Phase 7 (as that is the only thing I can afford), is that a bad idea. When do you think they will give possession in Phase 7 for these files.
Do the files have any further development charges, etc.?
(25)
Tuesday, March 1, 2016 10:56 PM PST 
Comments closed
Lahore Ring Road Southern Loop

As per latest advertisement from Lahore Ring Road Authority, the Southern Loop length is mentioned 22.4 KM. It was 30.4 KM as per original plan.
It shows that Ring Road Southern Loop will be constructed up to Adda Plot (on Raiwind Road) only.

ALI replied on Tuesday, March 1, 2016 11:04 PM PST 
This shows that yesterday letter of bahria was correct. But the main benefit of LRR is connection up to multan road

Ahmad786� replied on Wednesday, March 2, 2016 12:12 AM PST 
Bahria town has taken stay so no LRR in bahria. It will be till Adda Plot and i donot see it will go further then that in next 5 years.

Ahmad786� replied on Wednesday, March 2, 2016 12:13 AM PST 
there is stay in bahria. It will be till Adda Plot and i donot see it will go further then that in next 5 years.

Ahmad786� replied on Wednesday, March 2, 2016 12:13 AM PST 
It will be till Adda Plot and i donot see it will go further then that in next 5 years.

Ahmad786� replied on Wednesday, March 2, 2016 12:13 AM PST 
It will be till Adda Plot

Shahzad replied on Wednesday, March 2, 2016 04:55 AM PST 
Where u see/read latest ring road advertisement?

Anwar replied on Wednesday, March 2, 2016 06:16 AM PST 
Shahzad bhai,
see above post with image of add.

Brother replied on Wednesday, March 2, 2016 07:55 AM PST 
Kindly correct me if I m wrong, To my understanding bahria town management will provide new route/plan for LRR.

waseem replied on Wednesday, March 2, 2016 08:27 AM PST 
@Brother
Incorrect. Bahria can't provide new route, it can only give proposal or suggestion that how Ring Road will pass through Bahria effecting it least.
(24)
Sunday, February 14, 2016 10:32 PM PST 
Comments closed
(23)
Thursday, October 9, 2014 10:33 PM PST 
Comments closed
(22)
Sunday, October 5, 2014 09:47 PM PST 
Comments closed

Dear Friends As Sallam O Alaikum & Eid Mubarik,
My son completed GCSE in British stream, now interested in IT in Pakistan.
Please advise which university or college good in Pakistan preferable in Lahore.
Jazak Allah,
M.Khayyam

Ali replied on Monday, October 6, 2014 10:48 AM PST 
U
E
T

Ali replied on Monday, October 6, 2014 10:48 AM PST 
LUMS

Ali replied on Monday, October 6, 2014 10:49 AM PST 
GIKI

Ali replied on Monday, October 6, 2014 10:49 AM PST 
NUST

Ali replied on Monday, October 6, 2014 10:50 AM PST 
All of them are top universities of Pakistan and recognized all over the world

sami replied on Monday, October 6, 2014 10:47 PM PST 
Best is comsat lahore or itu in lahore

FA replied on Monday, October 6, 2014 11:52 PM PST 
FAST

Nauman replied on Tuesday, October 7, 2014 05:56 AM PST 
Lums, Nust and Fast are good ones for I.T

Qasim replied on Tuesday, October 7, 2014 06:34 AM PST 
I think before to start degree in IT your son has to complete A level be oz GCSE is O level and he will be not eligible to get admission in mentioned universities

asim replied on Wednesday, October 8, 2014 10:59 AM PST 
All of these universities are good but your son wont be able to learn anything if he is not up to it.

dxb replied on Thursday, October 9, 2014 08:12 PM PST 
Qasim sb is right. he needs to have A levels or FSc before entering any IT university or college.

Brother replied on Friday, October 10, 2014 12:54 AM PST 
AOA,
I am retired now, but I am fortunate to start the IT job back in 1992. later I moved to wireless-Communication (3G/4G) job, kindly remember 3G is 16 year old technology.
Please advice your son to study in detail at least two languages and those are Visual C++ and Visual Java++ because in almost all the computer/IT/Telecommunication/Wireless-Communication fields these two languages are must. All the international companies would be very happy to know that the job seeking candidate has done Visual C++ and Java++
Salam,
Brother in Islam

ali2 replied on Saturday, October 11, 2014 04:29 AM PST 
@brother
I'm IT expert and I have heard first time the language Java++

Ali replied on Saturday, October 11, 2014 04:42 AM PST 
UET
LUMS
GIKI
NUST
Regards,
Ali Malik

Dr Hussain replied on Saturday, October 11, 2014 04:43 AM PST 
AoA,
Being a university professor, I agree with Ali bhai's recommendations except GIKI. I would exclude GIKI from the list of the top institutions. It used to be a good institution in the past but it is no more among the top ones. You may also consider FAST. If you live in or around Lahore, the preference should be as following.
1. UET
2. LUMS
3. FAST
However, NUST should be the first preference and FAST second preference if you live in or around Islamabad.
Best regards,

Brother replied on Saturday, October 11, 2014 05:20 AM PST 
sorry dear Ali2,
I meant Visual Java, as most of the scripts are in perl in 3G/4G, but these two languages are enough to edit perl scripts.
Thanks for the correction.
Asalam,
Brother in Islam

Ali2 replied on Saturday, October 11, 2014 05:39 AM PST 
I'm IT professional, for IT institute matters, but the important thing is his own interest in IT. because in IT things are changing on daily basis, and he should be passionate. I'm Ashiq type of person, and I never enjoy working in IT.

asim replied on Saturday, October 11, 2014 06:04 AM PST 
All of these universities are good but your son wont be able to learn anything if he is not up to it. I have seen hundreds of people graduating from these universities in IT and move abroad and be successful, so it shouldn't matter which one he goes to. But if you are going to live in Pakistan while he study here, then choose the one which is near to your home.

Brother replied on Saturday, October 11, 2014 06:29 AM PST 
Dear Ali2,
I enjoyed working as IT & Telecom professional, but later years were getting bored with technical things, as I was getting old.
But to our younger generation, we should highlight the importance of programming as the size and function of hardware is decreasing, because the function and volume of programming is increasing, so we shall atleast guide to the yonger generation the importance of programming. If Iranians can take away the control of the American drone from American Army, and can safely make it land in Iran, then we can see clearly the importance of programming, better programming can do wonders, and it is the future. So I Think, we should at least highlight it, to our younger generation.
Eid Mubarak to you and also wish you good luck with the Ashick personality, the one who has not loved, has missed alot in this World.
Asalam,
Brother in Islam
(21)
Wednesday, August 6, 2014 10:54 PM PST 
Comments closed
Purchase of 4 marla commercial file DHA Lahore (Advise Needed

Dear All,
I am planning to buy a 4 marla commercial file in DHA Lahore. I plan to construct a commercial building and later rent it out for commercial purpose.
1. Which phase will be the best for this investment in the long run? 7, 8, 9?
2. What are the key things that should be kept in mind before making such an investment?
3. What are the risks involved in this investment?
4. Purchasing a commercial file does not guarantee the location, as after balloting the plot will be allotted randomly. Is it okay to buy a commercial file which will become commercial plot after ballot?
5. Are there any development charges to be paid after ballot?
based on your experiences your suggestions are highly valued.
Thank you

Lahore Real Estate replied on Thursday, August 7, 2014 09:40 AM PST 
Dear Sir,
For Long run buy dha phase 9 commercial file (due to its superb location and the modern one town planning wise) to get maximum return.you can build plaza as well in future for rental income.In case of dha phase 8 commercial broadway file the probability to get reasonable plot is very rare.If you want to build plaza earliest than phase 7 is not bad choice . obviously location is unknown before ballot there you are paying a lot less than plot price as well but this risk will pay must.surely you need to pay development charges after ballot on installment.
Salman Maqsood
Lahore Real Estate
03004009967
Email:Info@LREPK.Com

Raja replied on Thursday, August 7, 2014 03:51 PM PST 
Ph 7 comm is better than ph 9 coz ph7 is on ground and getting ready before ph 9.

Hammad replied on Thursday, August 7, 2014 07:10 PM PST 
Dear Mr. Salman Maqsood & Mr. Raja,
Many thanks for your valuable feedback.
what is the price of Phase 7 & Phase 9 4marla commercial file? Please share the total cost including breakup of all charges.
Thanks alot.

Lahore Real Estate replied on Friday, August 8, 2014 01:23 AM PST 
Dear Mr.Hammad,
DHA Phase 9 4-Marla Commercial File is available @ 176 Lacs
DHA Phase 9 4-Marla Commercial Transfer Fee All inclusive @ 136000/-
1 Commission
-------------------
DHA Phase 7 4-Marla Commercial File is available @ 152 Lacs
DHA Phase 7 4-Marla Commercial Transfer Fee All inclusive @ 180000/-
1 % Commission
Salman Maqsood
Lahore Real Estate
03004009967
Email:Info@LREPK.Com

Brother replied on Friday, August 8, 2014 07:33 PM PST 
@ Hammad
Go for it. Any thing in DHA is guaranteed to be good in the long run. Phase 7,8or 9 are all good. It is just matter of time with all the phases and nothing else. Just see that phase 1 to 5 are all the same in general and that is what is going to happen with phase 7,8 and 9 when all three will be fully developed. It is just matter of time.
(20)
Thursday, April 10, 2014 04:38 AM PST 
Comments closed
(19)
Sunday, July 8, 2012 09:35 AM PST 
Comments closed
Phase-6 Status

Dear members
Can anybody please guide me is Ph-6, block A or B DHA Lahore are liveable now or I should wait one more year to shift my family there.
Thanks in advance.
(18)
Tuesday, September 27, 2011 05:58 AM PST 
Comments closed
(17)
Thursday, September 15, 2011 01:23 AM PST 
Comments closed
comments on house plan

Image attached to a Lahore Real Estate post about: Please if you can comment on the attached plan which is draft only. This is ground floor only of a corner plot of 61 x95 size. The…
Please if you can comment on the attached plan which is draft only.
This is ground floor only of a corner plot of 61 x95 size. There will be no first floor ( may be in future) . Requirement is three bedrooms. With one additional guest bedroom which will be used very rarely ( that is why it is small). The north direction is from left to right. It is essential to keep 5 ft one side only and minimum 10 feet on front side only as per local laws.
You can see two staircases here.The plan is to have second unit on ist floor in future to be rented out.
Hope to have some useful comments before i go to the architect.
Regards,

ali11 replied on Thursday, September 15, 2011 03:48 AM PST 
strange design & its seems you have a strange requirement as well.

Brother replied on Thursday, September 15, 2011 04:08 AM PST 
Dear Faisal,
I am also going through designing phase of my house construction. During the process i was advised by a friend to have three distinct portions of your house ie FORMAL, SEMI FORMAL & PRIVATE. In formal area its your Drawing ,Dinning & Guest bed. In Semi formal area its your Lounge & Kitchen and in Private area comes your Bed rooms.Kindly see it for yourself whether your design meets this requirement.
Regards and best wishes.

faisal replied on Thursday, September 15, 2011 04:28 AM PST 
@ali, if you can elaborate on why it is a strange design, it will be great. I am curious enough.
@brother, yes it meets the requirment you mentioned very well.

ali11 replied on Thursday, September 15, 2011 04:41 AM PST 
my observations:
Try to move the lounge in the centre of the house. Then practically your house will feel bigger, right now its congested Corridor with a & stairs are eating lots of space. You already have access to back yard through kitchen. Redesign & Combine both walls of bedrooms, it will save some bucks in construction. Why you need a guest bed in front of the house with private access & also bathroom in front of the house!!!! that's ugly.

AG replied on Thursday, September 15, 2011 05:22 AM PST 
Dear Sir,
It is not a good design because,
1. Lounge is used as an Entrance Lobby as well. This is the place where family spends most of their time. People in the Lounge should be left undisturbed.
2. Guest room should be part of DD area. Guest should be able to use the DD without compromising the privacy of the house. In this design guest will walk through the lounge to the DD.
3. A lot of space is wasted in corridores.
My advice for you is to hire some good firm of Architects & give them your requirements. In Pakistan Architects, really, are not expensive & they do a good job. This will help you not to regeret after investing millions of rupees on your house otherwise people will say "Penny Wise - Pound Foolish"
Regards.

Guest replied on Thursday, September 15, 2011 10:49 AM PST 
Dear very nice design.
Just one change which you may consider:
Recommended change:
Exchange Lounge area with (drawing/dinning) area, As you know most of the time family will be sitting in the lounge. and when the family is sitting in the lounge, they shall enjoy the beautiful view of the lawn with beautiful color flowers with green grass all the time.
Salam,
Guest

Khan replied on Thursday, September 15, 2011 01:13 PM PST 
Some good suggestion mention above. Also cosider of switching kitchen with Lounge. This way kitchen will have cross ventilation and will be attached with DD.

ASK replied on Friday, September 16, 2011 02:25 AM PST 
What's missing here is a lobby. You have direct entrance into the lounge, which is not a good idea for reasons already suggested above. Your bathroom sizes are also a bit on the smaller size for a house this size, at least 2 of the bedrooms should have bigger baths.
Also you have to pass through the dining room to go into the drawing room which is again not a good idea.

AG replied on Friday, September 16, 2011 03:01 AM PST 
@Faisal.
Faisal Bhai you have a big, nice, corner plot. Pl. consider building 2 nos. double story (Back to Back) units with DD, Lounge, Kitchen & one bedroom on the ground floor & 3 bedrooms, servant room & a pantry on the 1st. floor.
You can complete foundation for both units but complete only one unit leaving the other to be completed in future.
Regards.
HTML code is disabled     Next Page