Lahore Real Estate Forum

Friday, November 27, 2026 06:02 AM
Total records2
Records per page10
Page views today60,478
Page views last hour2,809
(2)
Thursday, September 29, 2005 07:58 AM PST 
Comments closed
HUSSAIN KASRANI

AOA
can you tell me the date sector c will completly finish, with houses built.
also in the pictures shown by BT it shows independance drive with 10 lanes, and they say its the widest in lahore, but from the construction pictures its only 6 lanes and no were near the widest, do you know why that is.
also did bahria town make designs for sector c houses/villas themselves or can anyone make there own designs.
thank you.

Saqib Khokhar replied on Thursday, September 29, 2005 08:20 AM PST 
Mr. Suhaib!
Please let him complete this 6 lanes Drive. Don't tell Malik Riaz that he is not full filling his promise of 10 lanes. (Jaisay pehlay to sab promises full fill ho rahay hain ;). He will realize his misktake and will spent more time and money on those remaining 4 lanes. Just let him complete his work.
Thanx.

Kaisrani replied on Thursday, September 29, 2005 05:54 PM PST 
Brother SUHAIB, Neither I am eligible nor I am in the position to reply your questions. Only Bahria top management knows well and they are not contactable to me.
Like you and others, I can only guess that Sector C will be ready within 2008 if the speed of work continues on same level.
Never believe any developer (including Bahria Town) that they will fullfil their promises. In present situation there is no need to have a 10 lines drive. It is obvious that Bahria is in the position to make it 10 lines as and when needed if they are really serious about it.
My guess is that Bahria will have proper designs/villas of the houses.
(This is Hussain Kaisrani but due to some technical reason of this page I can not use my full name in replying any post).

ua replied on Thursday, September 29, 2005 07:26 PM PST 
I don't think that all of Sector C will be ready within 2008. A good portion may be ready by that time but I doubt that all of them will be. It is a fairly large sector and even though work is going on at a good pace, I doubt that it will finish by that time. Still, compared with other developers (including DHA, Eden and Urban Developers), the pace of work is a lot better...
(1)
Thursday, September 29, 2005 07:14 AM PST 
Comments closed
Gwadar Satellite View From Many Angles

Image attached to a Lahore Real Estate post about: Friends I just finished with many Gwadar satellite Images and maps.Only scheme names left to be placed on master plan map on a sat…
Friends I just finished with many Gwadar satellite Images and maps.Only scheme names left to be placed on master plan map on a satellite image that is not included in link under here.Master plan was marked after 6 hours work which I think my Gwadar loving buddies should have done :)
These images are for many angles of Gwadar.Just wait until you see fished satellite master plan map:)
http://www.pakrealestatetimes.com/showthread.php?tid=1332

SUHAIB replied on Thursday, September 29, 2005 07:37 AM PST 
dude, that photo is yearsssss old, the port area is empty on the picture, but actully its complete.

Kaisrani replied on Thursday, September 29, 2005 07:44 AM PST 
Brother SUHAIB!
I was also thinking like you BUT when I read the last sentence of brother CMY's post (I REPEAT: "Just wait until you see fished satellite master plan map") then I decided to keep quite.

suhaib replied on Thursday, September 29, 2005 07:53 AM PST 
yes but that map is not available this is the last map of gwadar released by google earth/
HTML code is disabled