Lahore Real Estate Forum

Wednesday, November 25, 2026 04:30 PM
Total records11
Records per page10
Page views today30,118
Page views last hour2,568
(11)
Friday, January 20, 2017 09:32 AM PST 
Comments closed
Contruction

Image attached to a Lahore Real Estate post about: Guys building a house as you may know....poured the foundations yesterday....there are cracks in the concrete is this normal...sho…
Guys building a house as you may know....poured the foundations yesterday....there are cracks in the concrete is this normal...should i be worried. Picture enclosed

Look25 replied on Friday, January 20, 2017 09:51 PM PST 
Its not great. Shuter shoild not be removed for at least 7 days in winter. Before progressing further you should ask qulifield structure engineer to inspect and get engineers report. Contractor will try to fill honeycombs in concrete. Make sure foundation is the main part of foundation if you have not corrected now you will have to spend lot if money later.
Why you should hire structure engineer see this link
http://www.crosstownengineering.com/insight/six-perks-hiring-structural-engineer-foundation-inspections/

Asim1 replied on Saturday, January 21, 2017 01:39 AM PST 
They are ok, it seems to be plates partition marks

KK� replied on Saturday, January 21, 2017 09:08 PM PST 
These are not cracks but shuttering offset marks...........there seems no water proofing treatment/membrane... also honey combing is there giving rise to risk of seepage..shud be treated with some water proofing chemical

asad replied on Sunday, January 22, 2017 12:45 AM PST 
you removed the shuttering too early.
use plaster to fil these openings.
next time be careful.
your contractor is not good.

Omair Waseem� replied on Sunday, January 22, 2017 11:30 AM PST 
Hmm the engineer has recommended water proofing....what does it entail....how is that done? Would using bitumen be enough?
(10)
Thursday, June 9, 2016 08:42 PM PST 
Comments closed
HTML code is disabled     Next Page