Lahore Real Estate Forum

Wednesday, November 25, 2026 03:34 PM
Total records11
Records per page10
Page views today27,677
Page views last hour2,247
(11)
Sunday, January 8, 2017 05:26 AM PST 
Comments closed
(10)
Saturday, January 7, 2017 08:59 AM PST 
Comments closed
DHA Multan

Aoa
Please guide that where you see DHA Multan after launch may be at end of this month most likely. Also where it would stand in January 2018 as per your assessment.
Regards

Samurai� replied on Saturday, January 7, 2017 02:03 PM PST 
Kindly read the message of cmy below.

NISAR replied on Saturday, January 7, 2017 07:42 PM PST 
DEAR IT IS BEST TIME TO EXIT.,ACCORDING TO CMY SB

RaoMubarak� replied on Saturday, January 7, 2017 09:15 PM PST 
As per CMY, DHA Multan is still high return & less risk investment and a best buy at current rates for the genuine investors who can wait for some time. It will give 100% profit in next 3 years.
In my view time to exit is for short term hunters and bouncing balls.

Ahmed 1� replied on Sunday, January 8, 2017 02:38 AM PST 
You will see continous price hike. Soon it would touch 55lacs as lot of investors are investing in this pocket hence price will go further up.

Samurai� replied on Sunday, January 8, 2017 04:13 AM PST 
If DHA multan is launched it would definately touch 50. After launch the main point would be the price of plot on installments and number of available plots. If smaller plots are offered in good number then it may affect the growth of 1K as many investors will go for smaller plots.
In January 2018, the price will largely depend if the plot are allocated or not. In my opinon the master stroke of the last year was switching from prism to multan and the next master stroke may be the reverse. I am thinking what time would be suitable for that.

MWH replied on Sunday, January 8, 2017 05:25 AM PST 
Please guide about DHA Multan, I just got file allocated two weeks back, is it good to hold for a year or so? If I dispose it right now then what would be next good option for one to two years investment? Range is about 45lac.
Regards

Jameel Mughal� replied on Sunday, January 8, 2017 07:39 AM PST 
I myself like medium term and Long term investment, with such a margin I will exit only if File was Open whic is not the case in Multan, Better wait for Ballot at least
(9)
Saturday, January 7, 2017 07:09 AM PST 
Comments closed
House contruction

Sorry this is a bit off topic, I am constructing a house at the moment we are putting in the foundations , its time to put in the pipes. We are putting in dadex pipes....what will be total cost of piping for the whole house of 12000 sq ft.
Plus would like to know the cost of wood work and tiles ...can anyone help?

Waseem� replied on Saturday, January 7, 2017 08:27 AM PST 

Jameel Mughal� replied on Saturday, January 7, 2017 10:53 AM PST 
It depends a Lot on the Plan and quality of wood work, Now New MDF Wood work is cheaper and good Looking, Roughly wood work cost you 250 to 400 per foot
Pipes should be of best quality in long run it will not make more than 50000 Difference than others

MWH replied on Saturday, January 7, 2017 08:39 PM PST 
But If I want to stay for another year what would be the prospects?

Omair Waseem� replied on Sunday, January 8, 2017 04:23 AM PST 
Thank you guys....Jameel and Waseem sb quick questions
Waseem/Jameel not labour rate but rather cost in terms of putting in fixtures and doors. I will have 11 rooms in the house so around 45 doors and Chogats , plus another 3 kitchens and a few cabinets. I have budgeted about 40 lacs....do you think that would be enough with labour.
Simiarly budgeted about 36lac for tiles at a rate of 220 sq ft * 15000 +/- some
He is projecting around 60 ton of steel of 12000 sq ft house and says around 6000 bags of cement for the same do you think that is right? I feel its a alot ...he say he will use 26.5 ton in basement alone and 1800 bags in the basement with foundation, jaal and walls and pillars....if that is the case would the remaining be enough ie 33.5 ton and 4200 for the other 2 floors

Omair Waseem� replied on Sunday, January 8, 2017 06:21 AM PST 
Few questions more questions :
- The contractor says we will need 64 ton of steel with 26.5 ton being used in the basement along with double jaal and retention walls, does that make sense
- Cement he says 6300 bags isnt that alot?
- Using blocks, how many blocks will be needed any idea
- I am budgeting and I have kept the following for
- Tiles (without labour) = 36 lacs
- Wood (with labour) = 43 lacs
Would this work?

Jameel Mughal� replied on Sunday, January 8, 2017 07:36 AM PST 
Toles without Labor 36 Lac is Lot Tiles Alone will not Cost that Much Tiles are just 1500 Rs Per Meter or 10 Sq Feet [Medium quality China which you see in almost all shops Gourmet Banks etc]
Similarly I could not Understand wood work 43 Lac You mean Wood Doors etc with Material? That should be more than enough too.
Cement estimate is OK as basement is there otherwise would be 30 Percent Less
You can save bit of Sarya, if you design grid by some experienced Architect, But again I will Tell you Steel and Cement should not be Compromised, Spending 2,3 Lac More gives you lot of extra life to your house and saves you from earth quake Cracks
When you complete all estimate ls share with us hous much yo spent in total

User_6006� replied on Sunday, January 8, 2017 07:46 AM PST 
best imported quality pipe is BBJ Lahore , highly recommended , after that dadex , avoid popular and jamal .

Waseem� replied on Sunday, January 8, 2017 09:05 AM PST 
Your architect can tell you how much steel is needed. 64 tons seems to be on the higher side. 1 kanal house without basement uses 10-14 tonnes of steel & cement bags approx 2000 bags, so your house with basement 6300 bags seems okay. Basement will eat lots of money because of concrete base & walls.
Tiles budget depends upon tiles price you select & same goes for woodwork. You must allocate budget for each item separately, like budget for tiles for each bathroom, similarly for doors, kitchens, & cabinets separately. Visit the market & gauge the prices for tiles & if you have size of each bath & room, you can calculate your rough budget.

Ibrahimdxb replied on Sunday, January 8, 2017 10:15 PM PST 
Hi Omair, the best ways is to hire the services of some engineer will be a lot better at the end. you will spend millions but without proper supervision of an expert? is not wise, but the choice is yours.

Habib replied on Monday, January 9, 2017 01:43 AM PST 
Dear Omair, Tiles (without labour) = 36 lacs
- Wood (with labour) = 43 lacs
you Look inexperienced, However it is based upon quality you need to this much money is more than enough for 2 houses.

Omair Waseem� replied on Monday, January 9, 2017 03:04 AM PST 
Habib I am ...I am 30 yrs old making a house for my father...I am looking for direction , the contractor is throwing all sort of rubbish numbers at me

Omair Waseem� replied on Monday, January 9, 2017 04:17 AM PST 
Boss i am inexperienced...making a house for myself ..looking for guidance

Habib replied on Monday, January 9, 2017 06:40 PM PST 
Omair in that case I will tell you take a second Opinion based on your design, as figures look too high to me.
read some Local Book about construction as suggested by others it will give you good insight, When I was teenager may Father Constructed Couple of Houses and ten myself did renovation of a house hence I have some Basic idea.

S.Mahmood replied on Wednesday, January 11, 2017 11:12 PM PST 
Can some body add here that same tile should be used in drawing/T.V Loung and in bed rooms. If some one also mention that in cost of 1500 to 2000 meter which tiles are better in look and quality.
HTML code is disabled     Next Page