Lahore Real Estate Forum

Wednesday, November 25, 2026 06:09 PM
Total records62
Records per page10
Page views today33,910
Page views last hour2,014
(62)
Wednesday, November 18, 2015 09:52 PM PST 
Comments closed
(61)
Monday, August 17, 2015 06:27 AM PST 
Comments closed
(60)
Monday, May 4, 2015 06:06 AM PST 
Comments closed

Dear CMY Sahib:
I purchased two AFFIDAVIT files 05M and 10M respectivelly of Phase-9 through Lahore RealEstate (LRE from Ch.Saeed and Mr. Hassan Raza) and received intimation letters only and returned back to KSA.As balloting is due on 15May, 2015, therefore, please be informed that my files will be included in the ballot or not.
sorry for repeting question as it was not answered earlier

CMY replied on Monday, May 4, 2015 06:09 AM PST 
Azad bhai 100% assurance they will be in ballot.

CMY replied on Monday, May 4, 2015 06:13 AM PST 
I must have said Insha Allah in above reply .
Insha Allah will make it almost 100% sure thing.
(59)
Thursday, January 8, 2015 02:47 AM PST 
Comments closed
Repair of Roof Top

I want to repair/treatment for the roof top of my house in Askari 10.
What are the steps involved in the treatment of roofs.
Will cementing the roof serve the purpose or I have to go for some other remedies.
Kindly share your experience.
Also share address of good contractor having experience in repairing roofs in Askari 10 lahore.
Thanks

Azad replied on Thursday, January 8, 2015 02:49 AM PST 
No body could suggest repair of Askaris...the only remedy is to do it afresh..

RZ replied on Thursday, January 8, 2015 04:39 AM PST 
Spray thick coat of hot bitumen ( asphalt ) when gets cold cover it with quality polythene sheet preferably double it. then spread 50mm sand with no stone so the polythene sheet and bitumen spray do not get damaged. now place Terrazzo (chips tile) with wet cement mortar sloping out side.
B. cast new chips floor with proper slop to sides.
Note Cement plaster or new concrete in slop will get creak and not a long term solution.

NM CH replied on Thursday, January 8, 2015 07:16 PM PST 
@ RZ.
Thanks RZ for your detailed reply.
How much time will be required for 250 meter roof top ?
What will be the estimated cost ?
Will it need to shave off the previous structure of the roof or it can be done over the existing roof ?
Your worthy reply is awaited.
Thanks again

RZ replied on Thursday, January 8, 2015 09:10 PM PST 
Not necessarily but you must clean very well the surface with wire brush and remove all loose element before the application of bitumen. Make sure when you lay tiles there is good slop drawn either side.
Cure the tiles by showering water for 7 days so the mortar and grout get good strengthened.
This is little costly but will save keeping your roof cool as well. I am not sure cost wise but it should not take more then a week if you have well equipped workforce.

NM CH replied on Thursday, January 8, 2015 10:07 PM PST 
Thanks a lot Mr RZ for your detailed reply.
(58)
Thursday, September 4, 2014 09:52 PM PST 
Comments closed
(57)
Thursday, April 25, 2013 09:43 PM PST 
Comments closed

I received a letter from Divine Gardens Marketing Department for Interior Designing options. The letter has 25 options available that DG can add to the house. Unfortunately, the letter does not include any pricing for each item to be included. Does anyone else who has house in DV received it?

Azad replied on Friday, April 26, 2013 02:49 AM PST 
Yes I received letter and called Divine Garden, they said just choose your options, sign on letter and send to them so they will forward to contractor and contractor will send you the cost and you can decide that you want or not.
Regards
(56)
Thursday, August 23, 2012 01:33 AM PST 
Comments closed
(53)
Sunday, August 19, 2012 12:38 AM PST 
Comments closed
HTML code is disabled     Next Page