10 am - 07 pm

Monday - Saturday

MB-46 DHA Phase 6,

Lahore, Pakistan

+92-42-111-111-040

[email protected]

Compare Listings

Prime Homes Construction Update

Located just across from Marriam Town’s main gate, the prime homes development offers both single‑storey and double‑storey options. The project sits on a well‑connected plot with direct access roads and neighboring streets on either side, ensuring easy commuting and future connectivity.

Site Overview and Construction Stages

The current phase shows a solid foundation with a damp board and a 12‑inch thick concrete slab. Above this, a 1‑foot plant beam supports the structure, a feature often omitted in smaller builds. The beam is reinforced with a 2‑inch concrete layer beneath, ensuring long‑term stability.

Construction progress is visible on the front façade where the plaster, plasterboard, and finishing touches are already in place. The site is equipped with professional engineers and skilled labor, allowing for swift completion of key milestones.

Key Construction Details

  • Foundation: 12‑inch damp board + 2‑inch concrete slab
  • Support: 1‑foot plant beam with reinforced concrete beneath
  • Finishes: Plaster, plasterboard, and early plasterwork visible
  • Workforce: On‑site engineers and laborers maintain daily progress

Payment Options and Ownership Transfer

Prospective owners can choose between single‑storey or double‑storey layouts depending on budget. A 50% installment at the start can secure handover within six months, while a full payment schedule can lead to ownership within three years.

For those holding existing project files, the development offers a seamless merge. By submitting these documents, buyers can transfer their current holdings into the new layout without detection, converting unused parcels into ready‑to‑move homes.

Steps for Merging Existing Files

  1. Gather your existing project file and verification documents.
  2. Submit the file to the development’s approval team.
  3. Once approved, the new plan is integrated, and payment proceeds as per the installment plan.
  4. Receive a fully constructed house within the agreed timeline.

With the prime homes site’s strategic location and robust construction practices, investors and homeowners alike can expect reliable quality and a clear path to ownership.


Stay Ahead in the Real Estate Market

Want real-time updates on property trends, market insights, and investment opportunities? Join our WhatsApp Channel today:

https://whatsapp.com/channel/0029Va8D70511uLBB3FgCK0u

Choudry Mujahid Yasin (CMY)
Owner, LahoreRealEstate.Com

Have a question or looking for personalized guidance? Message directly on WhatsApp:

+923224929992

Lahore Real Estate business card for Choudry Mujahid Yasin

Related posts

  • Blog

تھر و چولستان میں پانی: امکانات اور چیلنجز

صحرائی علاقوں میں آبپاشی، سیلابی پانی کے ذخیرے

Continue reading
by Choudhry Mujahid Yasin
  • Blog

Water Management in Thar and Cholistan

Explore proposals to bring water to Thar and

Continue reading
by Choudhry Mujahid Yasin
  • Blog

گوادر ماسٹر پلان اور جائیداد کی سمجھ

گوادر میں جائیداد دیکھتے وقت ماسٹر پلان، زوننگ

Continue reading
by Choudhry Mujahid Yasin

Join The Discussion